Skip to content
Thomas Chace edited this page Jun 2, 2014 · 21 revisions

Release Schedule

Post 1.0 Objectives:

* Single software channel support.
* Recursive dependency resolution.
* Conflict resolution.
* Upgrading packages.
* Fetching/installing packages.
* Erasing packages.
* Software channel auto-syncing.

Post 1.5 Objectives:

* Local installations.
* Package groups.
* Architecture detection.
* Sha256sum checking.

Post 2.0 Objectives:

* Multiple software channel support.
* Local repository support.
* Separate command to work with the database.
* Ability to change the root for installation.

Post 2.5 Objectives:

* Plugin system.
* Integrated build system.
* Automated source building.

Post 3.0 Objectives:

* Expanded and improved build system.
* Switch to an SQLite database for repositories.

Post 4.0 Objectives:

* Delta support.
* Package signing.
* Graphical Interface.
Clone this wiki locally