Skip to content

Latest commit

 

History

History
7 lines (5 loc) · 523 Bytes

File metadata and controls

7 lines (5 loc) · 523 Bytes

GP106 - Computing Project | Security-System

Building a scaled down version of the security system of The Pentagon of the USA

The project was consists of 3 subprojects. 3 groups of 4 students each worked together to complete each subproject. Subprojects were namely the Classified Document Room (CDR), President’s Office (PO), Central Control Centre (CCC).

Ultimately, these subproject worked together as one system. Students were provided with necessary infrastructure and resources in order to complete the project.