diff --git a/CHANGELOG.md b/CHANGELOG.md index fbea8611..99156850 100644 --- a/CHANGELOG.md +++ b/CHANGELOG.md @@ -1,3 +1,24 @@ +## 3.0.9 +* Upgrade API to 5.9.0 +* Fix axis position compared to tasks position +* Increase axis and tasks padding so axis is visible when "Date type" is set to "Hour" +* Remove magic numbers + +## 3.0.8 +* Fix bar start position and axis visibility on scroll + +## 3.0.7 +* Fix issue with showing multiple context menus +* Fix npm vulnerabilities + +## 3.0.6 +* Rollback shifted task bars in order to have backwards compatibility +* NPM vulnerabilities fixed + +## 3.0.5 +* Fix issue with disappearing of the task bar +* Fix issue with shifted task bar when `barsRoundedCorners` is enabled + ## 3.0.4 * Fix issue when milestones were rendered twice * Show customized legend name in the tooltips diff --git a/package-lock.json b/package-lock.json index 4af8336e..26175ad7 100644 --- a/package-lock.json +++ b/package-lock.json @@ -1,12 +1,12 @@ { "name": "powerbi-visuals-gantt", - "version": "3.0.4.0", + "version": "3.0.10.0", "lockfileVersion": 3, "requires": true, "packages": { "": { "name": "powerbi-visuals-gantt", - "version": "3.0.4.0", + "version": "3.0.10.0", "license": "MIT", "dependencies": { "d3-collection": "^1.0.7", @@ -26,8 +26,8 @@ "lodash.toarray": "^4.4.0", "lodash.uniq": "^4.5.0", "lodash.uniqby": "^4.7.0", - "powerbi-visuals-api": "^5.8.0", - "powerbi-visuals-utils-chartutils": "^6.0.2", + "powerbi-visuals-api": "^5.9.0", + "powerbi-visuals-utils-chartutils": "^6.0.3", "powerbi-visuals-utils-colorutils": "^6.0.3", "powerbi-visuals-utils-dataviewutils": "^6.0.2", "powerbi-visuals-utils-formattingmodel": "^6.0.1", @@ -58,8 +58,8 @@ "@types/lodash.uniq": "^4.5.9", "@types/lodash.uniqby": "^4.7.9", "@types/webpack": "^5.28.5", - "@typescript-eslint/eslint-plugin": "^7.2.0", - "@typescript-eslint/parser": "^7.2.0", + "@typescript-eslint/eslint-plugin": "^7.4.0", + "@typescript-eslint/parser": "^7.4.0", "css-loader": "^6.10.0", "eslint": "^8.57.0", "eslint-plugin-powerbi-visuals": "^0.8.1", @@ -80,8 +80,8 @@ "powerbi-visuals-utils-testutils": "^6.1.0", "style-loader": "^3.3.4", "ts-loader": "^9.5.1", - "typescript": "^5.4.2", - "webpack": "^5.90.3" + "typescript": "^5.4.3", + "webpack": "^5.91.0" } }, "node_modules/@aashutoshrathi/word-wrap": { @@ -1230,16 +1230,16 @@ } }, "node_modules/@typescript-eslint/eslint-plugin": { - "version": "7.2.0", - "resolved": "https://registry.npmjs.org/@typescript-eslint/eslint-plugin/-/eslint-plugin-7.2.0.tgz", - "integrity": "sha512-mdekAHOqS9UjlmyF/LSs6AIEvfceV749GFxoBAjwAv0nkevfKHWQFDMcBZWUiIC5ft6ePWivXoS36aKQ0Cy3sw==", + "version": "7.4.0", + "resolved": "https://registry.npmjs.org/@typescript-eslint/eslint-plugin/-/eslint-plugin-7.4.0.tgz", + "integrity": "sha512-yHMQ/oFaM7HZdVrVm/M2WHaNPgyuJH4WelkSVEWSSsir34kxW2kDJCxlXRhhGWEsMN0WAW/vLpKfKVcm8k+MPw==", "dev": true, "dependencies": { "@eslint-community/regexpp": "^4.5.1", - "@typescript-eslint/scope-manager": "7.2.0", - "@typescript-eslint/type-utils": "7.2.0", - "@typescript-eslint/utils": "7.2.0", - "@typescript-eslint/visitor-keys": "7.2.0", + "@typescript-eslint/scope-manager": "7.4.0", + "@typescript-eslint/type-utils": "7.4.0", + "@typescript-eslint/utils": "7.4.0", + "@typescript-eslint/visitor-keys": "7.4.0", "debug": "^4.3.4", "graphemer": "^1.4.0", "ignore": "^5.2.4", @@ -1248,7 +1248,7 @@ "ts-api-utils": "^1.0.1" }, "engines": { - "node": "^16.0.0 || >=18.0.0" + "node": "^18.18.0 || >=20.0.0" }, "funding": { "type": "opencollective", @@ -1265,19 +1265,19 @@ } }, "node_modules/@typescript-eslint/parser": { - "version": "7.2.0", - "resolved": "https://registry.npmjs.org/@typescript-eslint/parser/-/parser-7.2.0.tgz", - "integrity": "sha512-5FKsVcHTk6TafQKQbuIVkXq58Fnbkd2wDL4LB7AURN7RUOu1utVP+G8+6u3ZhEroW3DF6hyo3ZEXxgKgp4KeCg==", + "version": "7.4.0", + "resolved": "https://registry.npmjs.org/@typescript-eslint/parser/-/parser-7.4.0.tgz", + "integrity": "sha512-ZvKHxHLusweEUVwrGRXXUVzFgnWhigo4JurEj0dGF1tbcGh6buL+ejDdjxOQxv6ytcY1uhun1p2sm8iWStlgLQ==", "dev": true, "dependencies": { - "@typescript-eslint/scope-manager": "7.2.0", - "@typescript-eslint/types": "7.2.0", - "@typescript-eslint/typescript-estree": "7.2.0", - "@typescript-eslint/visitor-keys": "7.2.0", + "@typescript-eslint/scope-manager": "7.4.0", + "@typescript-eslint/types": "7.4.0", + "@typescript-eslint/typescript-estree": "7.4.0", + "@typescript-eslint/visitor-keys": "7.4.0", "debug": "^4.3.4" }, "engines": { - "node": "^16.0.0 || >=18.0.0" + "node": "^18.18.0 || >=20.0.0" }, "funding": { "type": "opencollective", @@ -1293,16 +1293,16 @@ } }, "node_modules/@typescript-eslint/scope-manager": { - "version": "7.2.0", - "resolved": "https://registry.npmjs.org/@typescript-eslint/scope-manager/-/scope-manager-7.2.0.tgz", - "integrity": "sha512-Qh976RbQM/fYtjx9hs4XkayYujB/aPwglw2choHmf3zBjB4qOywWSdt9+KLRdHubGcoSwBnXUH2sR3hkyaERRg==", + "version": "7.4.0", + "resolved": "https://registry.npmjs.org/@typescript-eslint/scope-manager/-/scope-manager-7.4.0.tgz", + "integrity": "sha512-68VqENG5HK27ypafqLVs8qO+RkNc7TezCduYrx8YJpXq2QGZ30vmNZGJJJC48+MVn4G2dCV8m5ZTVnzRexTVtw==", "dev": true, "dependencies": { - "@typescript-eslint/types": "7.2.0", - "@typescript-eslint/visitor-keys": "7.2.0" + "@typescript-eslint/types": "7.4.0", + "@typescript-eslint/visitor-keys": "7.4.0" }, "engines": { - "node": "^16.0.0 || >=18.0.0" + "node": "^18.18.0 || >=20.0.0" }, "funding": { "type": "opencollective", @@ -1310,18 +1310,18 @@ } }, "node_modules/@typescript-eslint/type-utils": { - "version": "7.2.0", - "resolved": "https://registry.npmjs.org/@typescript-eslint/type-utils/-/type-utils-7.2.0.tgz", - "integrity": "sha512-xHi51adBHo9O9330J8GQYQwrKBqbIPJGZZVQTHHmy200hvkLZFWJIFtAG/7IYTWUyun6DE6w5InDReePJYJlJA==", + "version": "7.4.0", + "resolved": "https://registry.npmjs.org/@typescript-eslint/type-utils/-/type-utils-7.4.0.tgz", + "integrity": "sha512-247ETeHgr9WTRMqHbbQdzwzhuyaJ8dPTuyuUEMANqzMRB1rj/9qFIuIXK7l0FX9i9FXbHeBQl/4uz6mYuCE7Aw==", "dev": true, "dependencies": { - "@typescript-eslint/typescript-estree": "7.2.0", - "@typescript-eslint/utils": "7.2.0", + "@typescript-eslint/typescript-estree": "7.4.0", + "@typescript-eslint/utils": "7.4.0", "debug": "^4.3.4", "ts-api-utils": "^1.0.1" }, "engines": { - "node": "^16.0.0 || >=18.0.0" + "node": "^18.18.0 || >=20.0.0" }, "funding": { "type": "opencollective", @@ -1337,12 +1337,12 @@ } }, "node_modules/@typescript-eslint/types": { - "version": "7.2.0", - "resolved": "https://registry.npmjs.org/@typescript-eslint/types/-/types-7.2.0.tgz", - "integrity": "sha512-XFtUHPI/abFhm4cbCDc5Ykc8npOKBSJePY3a3s+lwumt7XWJuzP5cZcfZ610MIPHjQjNsOLlYK8ASPaNG8UiyA==", + "version": "7.4.0", + "resolved": "https://registry.npmjs.org/@typescript-eslint/types/-/types-7.4.0.tgz", + "integrity": "sha512-mjQopsbffzJskos5B4HmbsadSJQWaRK0UxqQ7GuNA9Ga4bEKeiO6b2DnB6cM6bpc8lemaPseh0H9B/wyg+J7rw==", "dev": true, "engines": { - "node": "^16.0.0 || >=18.0.0" + "node": "^18.18.0 || >=20.0.0" }, "funding": { "type": "opencollective", @@ -1350,13 +1350,13 @@ } }, "node_modules/@typescript-eslint/typescript-estree": { - "version": "7.2.0", - "resolved": "https://registry.npmjs.org/@typescript-eslint/typescript-estree/-/typescript-estree-7.2.0.tgz", - "integrity": "sha512-cyxS5WQQCoBwSakpMrvMXuMDEbhOo9bNHHrNcEWis6XHx6KF518tkF1wBvKIn/tpq5ZpUYK7Bdklu8qY0MsFIA==", + "version": "7.4.0", + "resolved": "https://registry.npmjs.org/@typescript-eslint/typescript-estree/-/typescript-estree-7.4.0.tgz", + "integrity": "sha512-A99j5AYoME/UBQ1ucEbbMEmGkN7SE0BvZFreSnTd1luq7yulcHdyGamZKizU7canpGDWGJ+Q6ZA9SyQobipePg==", "dev": true, "dependencies": { - "@typescript-eslint/types": "7.2.0", - "@typescript-eslint/visitor-keys": "7.2.0", + "@typescript-eslint/types": "7.4.0", + "@typescript-eslint/visitor-keys": "7.4.0", "debug": "^4.3.4", "globby": "^11.1.0", "is-glob": "^4.0.3", @@ -1365,7 +1365,7 @@ "ts-api-utils": "^1.0.1" }, "engines": { - "node": "^16.0.0 || >=18.0.0" + "node": "^18.18.0 || >=20.0.0" }, "funding": { "type": "opencollective", @@ -1402,21 +1402,21 @@ } }, "node_modules/@typescript-eslint/utils": { - "version": "7.2.0", - "resolved": "https://registry.npmjs.org/@typescript-eslint/utils/-/utils-7.2.0.tgz", - "integrity": "sha512-YfHpnMAGb1Eekpm3XRK8hcMwGLGsnT6L+7b2XyRv6ouDuJU1tZir1GS2i0+VXRatMwSI1/UfcyPe53ADkU+IuA==", + "version": "7.4.0", + "resolved": "https://registry.npmjs.org/@typescript-eslint/utils/-/utils-7.4.0.tgz", + "integrity": "sha512-NQt9QLM4Tt8qrlBVY9lkMYzfYtNz8/6qwZg8pI3cMGlPnj6mOpRxxAm7BMJN9K0AiY+1BwJ5lVC650YJqYOuNg==", "dev": true, "dependencies": { "@eslint-community/eslint-utils": "^4.4.0", "@types/json-schema": "^7.0.12", "@types/semver": "^7.5.0", - "@typescript-eslint/scope-manager": "7.2.0", - "@typescript-eslint/types": "7.2.0", - "@typescript-eslint/typescript-estree": "7.2.0", + "@typescript-eslint/scope-manager": "7.4.0", + "@typescript-eslint/types": "7.4.0", + "@typescript-eslint/typescript-estree": "7.4.0", "semver": "^7.5.4" }, "engines": { - "node": "^16.0.0 || >=18.0.0" + "node": "^18.18.0 || >=20.0.0" }, "funding": { "type": "opencollective", @@ -1427,16 +1427,16 @@ } }, "node_modules/@typescript-eslint/visitor-keys": { - "version": "7.2.0", - "resolved": "https://registry.npmjs.org/@typescript-eslint/visitor-keys/-/visitor-keys-7.2.0.tgz", - "integrity": "sha512-c6EIQRHhcpl6+tO8EMR+kjkkV+ugUNXOmeASA1rlzkd8EPIriavpWoiEz1HR/VLhbVIdhqnV6E7JZm00cBDx2A==", + "version": "7.4.0", + "resolved": "https://registry.npmjs.org/@typescript-eslint/visitor-keys/-/visitor-keys-7.4.0.tgz", + "integrity": "sha512-0zkC7YM0iX5Y41homUUeW1CHtZR01K3ybjM1l6QczoMuay0XKtrb93kv95AxUGwdjGr64nNqnOCwmEl616N8CA==", "dev": true, "dependencies": { - "@typescript-eslint/types": "7.2.0", + "@typescript-eslint/types": "7.4.0", "eslint-visitor-keys": "^3.4.1" }, "engines": { - "node": "^16.0.0 || >=18.0.0" + "node": "^18.18.0 || >=20.0.0" }, "funding": { "type": "opencollective", @@ -1450,9 +1450,9 @@ "dev": true }, "node_modules/@webassemblyjs/ast": { - "version": "1.11.6", - "resolved": "https://registry.npmjs.org/@webassemblyjs/ast/-/ast-1.11.6.tgz", - "integrity": "sha512-IN1xI7PwOvLPgjcf180gC1bqn3q/QaOCwYUahIOhbYUu8KA/3tw2RT/T0Gidi1l7Hhj5D/INhJxiICObqpMu4Q==", + "version": "1.12.1", + "resolved": "https://registry.npmjs.org/@webassemblyjs/ast/-/ast-1.12.1.tgz", + "integrity": "sha512-EKfMUOPRRUTy5UII4qJDGPpqfwjOmZ5jeGFwid9mnoqIFK+e0vqoi1qH56JpmZSzEL53jKnNzScdmftJyG5xWg==", "dev": true, "dependencies": { "@webassemblyjs/helper-numbers": "1.11.6", @@ -1472,9 +1472,9 @@ "dev": true }, "node_modules/@webassemblyjs/helper-buffer": { - "version": "1.11.6", - "resolved": "https://registry.npmjs.org/@webassemblyjs/helper-buffer/-/helper-buffer-1.11.6.tgz", - "integrity": "sha512-z3nFzdcp1mb8nEOFFk8DrYLpHvhKC3grJD2ardfKOzmbmJvEf/tPIqCY+sNcwZIY8ZD7IkB2l7/pqhUhqm7hLA==", + "version": "1.12.1", + "resolved": "https://registry.npmjs.org/@webassemblyjs/helper-buffer/-/helper-buffer-1.12.1.tgz", + "integrity": "sha512-nzJwQw99DNDKr9BVCOZcLuJJUlqkJh+kVzVl6Fmq/tI5ZtEyWT1KZMyOXltXLZJmDtvLCDgwsyrkohEtopTXCw==", "dev": true }, "node_modules/@webassemblyjs/helper-numbers": { @@ -1495,15 +1495,15 @@ "dev": true }, "node_modules/@webassemblyjs/helper-wasm-section": { - "version": "1.11.6", - "resolved": "https://registry.npmjs.org/@webassemblyjs/helper-wasm-section/-/helper-wasm-section-1.11.6.tgz", - "integrity": "sha512-LPpZbSOwTpEC2cgn4hTydySy1Ke+XEu+ETXuoyvuyezHO3Kjdu90KK95Sh9xTbmjrCsUwvWwCOQQNta37VrS9g==", + "version": "1.12.1", + "resolved": "https://registry.npmjs.org/@webassemblyjs/helper-wasm-section/-/helper-wasm-section-1.12.1.tgz", + "integrity": "sha512-Jif4vfB6FJlUlSbgEMHUyk1j234GTNG9dBJ4XJdOySoj518Xj0oGsNi59cUQF4RRMS9ouBUxDDdyBVfPTypa5g==", "dev": true, "dependencies": { - "@webassemblyjs/ast": "1.11.6", - "@webassemblyjs/helper-buffer": "1.11.6", + "@webassemblyjs/ast": "1.12.1", + "@webassemblyjs/helper-buffer": "1.12.1", "@webassemblyjs/helper-wasm-bytecode": "1.11.6", - "@webassemblyjs/wasm-gen": "1.11.6" + "@webassemblyjs/wasm-gen": "1.12.1" } }, "node_modules/@webassemblyjs/ieee754": { @@ -1531,28 +1531,28 @@ "dev": true }, "node_modules/@webassemblyjs/wasm-edit": { - "version": "1.11.6", - "resolved": "https://registry.npmjs.org/@webassemblyjs/wasm-edit/-/wasm-edit-1.11.6.tgz", - "integrity": "sha512-Ybn2I6fnfIGuCR+Faaz7YcvtBKxvoLV3Lebn1tM4o/IAJzmi9AWYIPWpyBfU8cC+JxAO57bk4+zdsTjJR+VTOw==", + "version": "1.12.1", + "resolved": "https://registry.npmjs.org/@webassemblyjs/wasm-edit/-/wasm-edit-1.12.1.tgz", + "integrity": "sha512-1DuwbVvADvS5mGnXbE+c9NfA8QRcZ6iKquqjjmR10k6o+zzsRVesil54DKexiowcFCPdr/Q0qaMgB01+SQ1u6g==", "dev": true, "dependencies": { - "@webassemblyjs/ast": "1.11.6", - "@webassemblyjs/helper-buffer": "1.11.6", + "@webassemblyjs/ast": "1.12.1", + "@webassemblyjs/helper-buffer": "1.12.1", "@webassemblyjs/helper-wasm-bytecode": "1.11.6", - "@webassemblyjs/helper-wasm-section": "1.11.6", - "@webassemblyjs/wasm-gen": "1.11.6", - "@webassemblyjs/wasm-opt": "1.11.6", - "@webassemblyjs/wasm-parser": "1.11.6", - "@webassemblyjs/wast-printer": "1.11.6" + "@webassemblyjs/helper-wasm-section": "1.12.1", + "@webassemblyjs/wasm-gen": "1.12.1", + "@webassemblyjs/wasm-opt": "1.12.1", + "@webassemblyjs/wasm-parser": "1.12.1", + "@webassemblyjs/wast-printer": "1.12.1" } }, "node_modules/@webassemblyjs/wasm-gen": { - "version": "1.11.6", - "resolved": "https://registry.npmjs.org/@webassemblyjs/wasm-gen/-/wasm-gen-1.11.6.tgz", - "integrity": "sha512-3XOqkZP/y6B4F0PBAXvI1/bky7GryoogUtfwExeP/v7Nzwo1QLcq5oQmpKlftZLbT+ERUOAZVQjuNVak6UXjPA==", + "version": "1.12.1", + "resolved": "https://registry.npmjs.org/@webassemblyjs/wasm-gen/-/wasm-gen-1.12.1.tgz", + "integrity": "sha512-TDq4Ojh9fcohAw6OIMXqiIcTq5KUXTGRkVxbSo1hQnSy6lAM5GSdfwWeSxpAo0YzgsgF182E/U0mDNhuA0tW7w==", "dev": true, "dependencies": { - "@webassemblyjs/ast": "1.11.6", + "@webassemblyjs/ast": "1.12.1", "@webassemblyjs/helper-wasm-bytecode": "1.11.6", "@webassemblyjs/ieee754": "1.11.6", "@webassemblyjs/leb128": "1.11.6", @@ -1560,24 +1560,24 @@ } }, "node_modules/@webassemblyjs/wasm-opt": { - "version": "1.11.6", - "resolved": "https://registry.npmjs.org/@webassemblyjs/wasm-opt/-/wasm-opt-1.11.6.tgz", - "integrity": "sha512-cOrKuLRE7PCe6AsOVl7WasYf3wbSo4CeOk6PkrjS7g57MFfVUF9u6ysQBBODX0LdgSvQqRiGz3CXvIDKcPNy4g==", + "version": "1.12.1", + "resolved": "https://registry.npmjs.org/@webassemblyjs/wasm-opt/-/wasm-opt-1.12.1.tgz", + "integrity": "sha512-Jg99j/2gG2iaz3hijw857AVYekZe2SAskcqlWIZXjji5WStnOpVoat3gQfT/Q5tb2djnCjBtMocY/Su1GfxPBg==", "dev": true, "dependencies": { - "@webassemblyjs/ast": "1.11.6", - "@webassemblyjs/helper-buffer": "1.11.6", - "@webassemblyjs/wasm-gen": "1.11.6", - "@webassemblyjs/wasm-parser": "1.11.6" + "@webassemblyjs/ast": "1.12.1", + "@webassemblyjs/helper-buffer": "1.12.1", + "@webassemblyjs/wasm-gen": "1.12.1", + "@webassemblyjs/wasm-parser": "1.12.1" } }, "node_modules/@webassemblyjs/wasm-parser": { - "version": "1.11.6", - "resolved": "https://registry.npmjs.org/@webassemblyjs/wasm-parser/-/wasm-parser-1.11.6.tgz", - "integrity": "sha512-6ZwPeGzMJM3Dqp3hCsLgESxBGtT/OeCvCZ4TA1JUPYgmhAx38tTPR9JaKy0S5H3evQpO/h2uWs2j6Yc/fjkpTQ==", + "version": "1.12.1", + "resolved": "https://registry.npmjs.org/@webassemblyjs/wasm-parser/-/wasm-parser-1.12.1.tgz", + "integrity": "sha512-xikIi7c2FHXysxXe3COrVUPSheuBtpcfhbpFj4gmu7KRLYOzANztwUU0IbsqvMqzuNK2+glRGWCEqZo1WCLyAQ==", "dev": true, "dependencies": { - "@webassemblyjs/ast": "1.11.6", + "@webassemblyjs/ast": "1.12.1", "@webassemblyjs/helper-api-error": "1.11.6", "@webassemblyjs/helper-wasm-bytecode": "1.11.6", "@webassemblyjs/ieee754": "1.11.6", @@ -1586,12 +1586,12 @@ } }, "node_modules/@webassemblyjs/wast-printer": { - "version": "1.11.6", - "resolved": "https://registry.npmjs.org/@webassemblyjs/wast-printer/-/wast-printer-1.11.6.tgz", - "integrity": "sha512-JM7AhRcE+yW2GWYaKeHL5vt4xqee5N2WcezptmgyhNS+ScggqcT1OtXykhAb13Sn5Yas0j2uv9tHgrjwvzAP4A==", + "version": "1.12.1", + "resolved": "https://registry.npmjs.org/@webassemblyjs/wast-printer/-/wast-printer-1.12.1.tgz", + "integrity": "sha512-+X4WAlOisVWQMikjbcvY2e0rwPsKQ9F688lksZhBcPycBBuii3O7m8FACbDMWDojpAqvjIncrG8J0XHKyQfVeA==", "dev": true, "dependencies": { - "@webassemblyjs/ast": "1.11.6", + "@webassemblyjs/ast": "1.12.1", "@xtuc/long": "4.2.2" } }, @@ -3176,9 +3176,9 @@ } }, "node_modules/enhanced-resolve": { - "version": "5.15.0", - "resolved": "https://registry.npmjs.org/enhanced-resolve/-/enhanced-resolve-5.15.0.tgz", - "integrity": "sha512-LXYT42KJ7lpIKECr2mAXIaMldcNCh/7E0KBKOu4KSfkHmP+mZmSs+8V5gBAqisWBy0OO4W5Oyys0GO1Y8KtdKg==", + "version": "5.16.0", + "resolved": "https://registry.npmjs.org/enhanced-resolve/-/enhanced-resolve-5.16.0.tgz", + "integrity": "sha512-O+QWCviPNSSLAD9Ucn8Awv+poAkqn3T1XY5/N7kR7rQO9yfSGWkYZDwpJ+iKF7B8rxaQKWngSqACpgzeapSyoA==", "dev": true, "dependencies": { "graceful-fs": "^4.2.4", @@ -3461,17 +3461,17 @@ "dev": true }, "node_modules/express": { - "version": "4.18.2", - "resolved": "https://registry.npmjs.org/express/-/express-4.18.2.tgz", - "integrity": "sha512-5/PsL6iGPdfQ/lKM1UuielYgv3BUoJfz1aUwU9vHZ+J7gyvwdQXFEBIEIaxeGf0GIcreATNyBExtalisDbuMqQ==", + "version": "4.19.2", + "resolved": "https://registry.npmjs.org/express/-/express-4.19.2.tgz", + "integrity": "sha512-5T6nhjsT+EOMzuck8JjBHARTHfMht0POzlA60WV2pMD3gyXw2LZnZ+ueGdNxG+0calOJcWKbpFcuzLZ91YWq9Q==", "dev": true, "dependencies": { "accepts": "~1.3.8", "array-flatten": "1.1.1", - "body-parser": "1.20.1", + "body-parser": "1.20.2", "content-disposition": "0.5.4", "content-type": "~1.0.4", - "cookie": "0.5.0", + "cookie": "0.6.0", "cookie-signature": "1.0.6", "debug": "2.6.9", "depd": "2.0.0", @@ -3508,34 +3508,10 @@ "integrity": "sha512-PCVAQswWemu6UdxsDFFX/+gVeYqKAod3D3UVm91jHwynguOwAvYPhx8nNlM++NqRcK6CxxpUafjmhIdKiHibqg==", "dev": true }, - "node_modules/express/node_modules/body-parser": { - "version": "1.20.1", - "resolved": "https://registry.npmjs.org/body-parser/-/body-parser-1.20.1.tgz", - "integrity": "sha512-jWi7abTbYwajOytWCQc37VulmWiRae5RyTpaCyDcS5/lMdtwSz5lOpDE67srw/HYe35f1z3fDQw+3txg7gNtWw==", - "dev": true, - "dependencies": { - "bytes": "3.1.2", - "content-type": "~1.0.4", - "debug": "2.6.9", - "depd": "2.0.0", - "destroy": "1.2.0", - "http-errors": "2.0.0", - "iconv-lite": "0.4.24", - "on-finished": "2.4.1", - "qs": "6.11.0", - "raw-body": "2.5.1", - "type-is": "~1.6.18", - "unpipe": "1.0.0" - }, - "engines": { - "node": ">= 0.8", - "npm": "1.2.8000 || >= 1.4.16" - } - }, "node_modules/express/node_modules/cookie": { - "version": "0.5.0", - "resolved": "https://registry.npmjs.org/cookie/-/cookie-0.5.0.tgz", - "integrity": "sha512-YZ3GUyn/o8gfKJlnlX7g7xq4gyO6OSuhGPKaaGssGB2qgDUS0gPgtTvoyZLTt9Ab6dC4hfc9dV5arkvc/OCmrw==", + "version": "0.6.0", + "resolved": "https://registry.npmjs.org/cookie/-/cookie-0.6.0.tgz", + "integrity": "sha512-U71cyTamuh1CRNCfpGY6to28lxvNwPG4Guz/EVjgf3Jmzv0vlDp1atT9eS5dDjMYHucpHbWns6Lwf3BKz6svdw==", "dev": true, "engines": { "node": ">= 0.6" @@ -3574,21 +3550,6 @@ "integrity": "sha512-Tpp60P6IUJDTuOq/5Z8cdskzJujfwqfOTkrwIwj7IRISpnkJnT6SyJ4PCPnGMoFjC9ddhal5KVIYtAt97ix05A==", "dev": true }, - "node_modules/express/node_modules/raw-body": { - "version": "2.5.1", - "resolved": "https://registry.npmjs.org/raw-body/-/raw-body-2.5.1.tgz", - "integrity": "sha512-qqJBtEyVgS0ZmPGdCFPWJ3FreoqvG4MVQln/kCgF7Olq95IbOp0/BWyMwbdtn4VTvkM8Y7khCQ2Xgk/tcrCXig==", - "dev": true, - "dependencies": { - "bytes": "3.1.2", - "http-errors": "2.0.0", - "iconv-lite": "0.4.24", - "unpipe": "1.0.0" - }, - "engines": { - "node": ">= 0.8" - } - }, "node_modules/express/node_modules/statuses": { "version": "2.0.1", "resolved": "https://registry.npmjs.org/statuses/-/statuses-2.0.1.tgz", @@ -3809,9 +3770,9 @@ "dev": true }, "node_modules/follow-redirects": { - "version": "1.15.5", - "resolved": "https://registry.npmjs.org/follow-redirects/-/follow-redirects-1.15.5.tgz", - "integrity": "sha512-vSFWUON1B+yAw1VN4xMfxgn5fTUiaOzAJCKBwIIgT/+7CuGy9+r+5gITvP62j3RmaD5Ph65UaERdOSRGUzZtgw==", + "version": "1.15.6", + "resolved": "https://registry.npmjs.org/follow-redirects/-/follow-redirects-1.15.6.tgz", + "integrity": "sha512-wWN62YITEaOpSK584EZXJafH1AGpO8RVgElfkuXbTOrPX4fIfOyEpW/CsiNd8JdYrAoOvafRTOEnvsO++qCqFA==", "dev": true, "funding": [ { @@ -6604,11 +6565,11 @@ "integrity": "sha512-fToQmRqECBJSlHaKNAzFql52ryNnhSm2UwRXfsctcS5Hp//o9sExasVsASv6jZjXE8ACNyKjDUKdGqWsCjRd1Q==" }, "node_modules/powerbi-visuals-api": { - "version": "5.8.0", - "resolved": "https://registry.npmjs.org/powerbi-visuals-api/-/powerbi-visuals-api-5.8.0.tgz", - "integrity": "sha512-0rcldFiNPn0HSQ3XGdFzRqFofh/UHn0zcGMtcUWXqJIIL3ekhpdRmTdw/OsT9biEHVnBiim3HIhgHHoGr/se/Q==", + "version": "5.9.0", + "resolved": "https://registry.npmjs.org/powerbi-visuals-api/-/powerbi-visuals-api-5.9.0.tgz", + "integrity": "sha512-i7GLJOr2gNvdvHuGqTt+ktBVuRcrduoJMIG94avCba/iPEo2pHGqbdESfsV85UALwZA+6lTKfOnwn83lDh0rCA==", "dependencies": { - "semver": "^7.3.5" + "semver": "^7.6.0" } }, "node_modules/powerbi-visuals-tools": { @@ -6898,9 +6859,9 @@ } }, "node_modules/powerbi-visuals-utils-chartutils": { - "version": "6.0.2", - "resolved": "https://registry.npmjs.org/powerbi-visuals-utils-chartutils/-/powerbi-visuals-utils-chartutils-6.0.2.tgz", - "integrity": "sha512-3YzN43zgvXIA0Gv1suGAFH4GJqpXqMCKNmpAt9vEuwVmN1rNWV51CMJjFVEDaE3k5zbuSYKPwEerJEmXJdR9iQ==", + "version": "6.0.3", + "resolved": "https://registry.npmjs.org/powerbi-visuals-utils-chartutils/-/powerbi-visuals-utils-chartutils-6.0.3.tgz", + "integrity": "sha512-wDoR7eDwTFWh9di4xk8mQKXDtUQ8GGdtEmXWfcuJ8T3XLSNnE3ek3NtpistbYuAKgWnCS0mW625JyZ0I/nLLpg==", "dependencies": { "d3-array": "^3.2.4", "d3-axis": "^3.0.0", @@ -7500,9 +7461,9 @@ } }, "node_modules/semver": { - "version": "7.5.4", - "resolved": "https://registry.npmjs.org/semver/-/semver-7.5.4.tgz", - "integrity": "sha512-1bCSESV6Pv+i21Hvpxp3Dx+pSD8lIPt8uVjRrxAUt/nbswYc+tK6Y2btiULjd4+fnq15PX+nqQDC7Oft7WkwcA==", + "version": "7.6.0", + "resolved": "https://registry.npmjs.org/semver/-/semver-7.6.0.tgz", + "integrity": "sha512-EnwXhrlwXMk9gKu5/flx5sv/an57AkRplG3hTK68W7FRDN+k+OWBj65M7719OkA82XLBxrcX0KSHj+X5COhOVg==", "dependencies": { "lru-cache": "^6.0.0" }, @@ -8389,9 +8350,9 @@ } }, "node_modules/typescript": { - "version": "5.4.2", - "resolved": "https://registry.npmjs.org/typescript/-/typescript-5.4.2.tgz", - "integrity": "sha512-+2/g0Fds1ERlP6JsakQQDXjZdZMM+rqpamFZJEKh4kwTIn3iDkgKtby0CeNd5ATNZ4Ry1ax15TMx0W2V+miizQ==", + "version": "5.4.3", + "resolved": "https://registry.npmjs.org/typescript/-/typescript-5.4.3.tgz", + "integrity": "sha512-KrPd3PKaCLr78MalgiwJnA25Nm8HAmdwN3mYUYZgG/wizIo9EainNVQI9/yDavtVFRN2h3k8uf3GLHuhDMgEHg==", "dev": true, "bin": { "tsc": "bin/tsc", @@ -8570,9 +8531,9 @@ } }, "node_modules/watchpack": { - "version": "2.4.0", - "resolved": "https://registry.npmjs.org/watchpack/-/watchpack-2.4.0.tgz", - "integrity": "sha512-Lcvm7MGST/4fup+ifyKi2hjyIAwcdI4HRgtvTpIUxBRhB+RFtUh8XtDOxUfctVCnhVi+QQj49i91OyvzkJl6cg==", + "version": "2.4.1", + "resolved": "https://registry.npmjs.org/watchpack/-/watchpack-2.4.1.tgz", + "integrity": "sha512-8wrBCMtVhqcXP2Sup1ctSkga6uc2Bx0IIvKyT7yTFier5AXHooSI+QyQQAtTb7+E0IUCCKyTFmXqdqgum2XWGg==", "dev": true, "dependencies": { "glob-to-regexp": "^0.4.1", @@ -8601,26 +8562,26 @@ } }, "node_modules/webpack": { - "version": "5.90.3", - "resolved": "https://registry.npmjs.org/webpack/-/webpack-5.90.3.tgz", - "integrity": "sha512-h6uDYlWCctQRuXBs1oYpVe6sFcWedl0dpcVaTf/YF67J9bKvwJajFulMVSYKHrksMB3I/pIagRzDxwxkebuzKA==", + "version": "5.91.0", + "resolved": "https://registry.npmjs.org/webpack/-/webpack-5.91.0.tgz", + "integrity": "sha512-rzVwlLeBWHJbmgTC/8TvAcu5vpJNII+MelQpylD4jNERPwpBJOE2lEcko1zJX3QJeLjTTAnQxn/OJ8bjDzVQaw==", "dev": true, "dependencies": { "@types/eslint-scope": "^3.7.3", "@types/estree": "^1.0.5", - "@webassemblyjs/ast": "^1.11.5", - "@webassemblyjs/wasm-edit": "^1.11.5", - "@webassemblyjs/wasm-parser": "^1.11.5", + "@webassemblyjs/ast": "^1.12.1", + "@webassemblyjs/wasm-edit": "^1.12.1", + "@webassemblyjs/wasm-parser": "^1.12.1", "acorn": "^8.7.1", "acorn-import-assertions": "^1.9.0", "browserslist": "^4.21.10", "chrome-trace-event": "^1.0.2", - "enhanced-resolve": "^5.15.0", + "enhanced-resolve": "^5.16.0", "es-module-lexer": "^1.2.1", "eslint-scope": "5.1.1", "events": "^3.2.0", "glob-to-regexp": "^0.4.1", - "graceful-fs": "^4.2.9", + "graceful-fs": "^4.2.11", "json-parse-even-better-errors": "^2.3.1", "loader-runner": "^4.2.0", "mime-types": "^2.1.27", @@ -8628,7 +8589,7 @@ "schema-utils": "^3.2.0", "tapable": "^2.1.1", "terser-webpack-plugin": "^5.3.10", - "watchpack": "^2.4.0", + "watchpack": "^2.4.1", "webpack-sources": "^3.2.3" }, "bin": { @@ -8705,9 +8666,9 @@ } }, "node_modules/webpack-dev-middleware": { - "version": "5.3.3", - "resolved": "https://registry.npmjs.org/webpack-dev-middleware/-/webpack-dev-middleware-5.3.3.tgz", - "integrity": "sha512-hj5CYrY0bZLB+eTO+x/j67Pkrquiy7kWepMHmUMoPsmcUaeEnQJqFzHJOyxgWlq746/wUuA64p9ta34Kyb01pA==", + "version": "5.3.4", + "resolved": "https://registry.npmjs.org/webpack-dev-middleware/-/webpack-dev-middleware-5.3.4.tgz", + "integrity": "sha512-BVdTqhhs+0IfoeAf7EoH5WE+exCmqGerHfDM0IL096Px60Tq2Mn9MAbnaGUe6HiMa41KMCYF19gyzZmBcq/o4Q==", "dev": true, "dependencies": { "colorette": "^2.0.10", diff --git a/package.json b/package.json index 32c4c3d8..0c0bbf96 100644 --- a/package.json +++ b/package.json @@ -1,6 +1,6 @@ { "name": "powerbi-visuals-gantt", - "version": "3.0.4.0", + "version": "3.0.10.0", "description": "A Gantt chart is a type of bar chart which illustrates a project timeline or schedule. The Gantt Chart visual shows the Tasks, Start Dates, Durations, % Complete, and Resources for a project. The Gantt Chart visual can be used to show current schedule status using percent-complete shadings and a vertical \"TODAY\" line. The Legend may be used to group or filter tasks based upon data values.", "repository": { "type": "git", @@ -44,8 +44,8 @@ "lodash.toarray": "^4.4.0", "lodash.uniq": "^4.5.0", "lodash.uniqby": "^4.7.0", - "powerbi-visuals-api": "^5.8.0", - "powerbi-visuals-utils-chartutils": "^6.0.2", + "powerbi-visuals-api": "^5.9.0", + "powerbi-visuals-utils-chartutils": "^6.0.3", "powerbi-visuals-utils-colorutils": "^6.0.3", "powerbi-visuals-utils-dataviewutils": "^6.0.2", "powerbi-visuals-utils-formattingmodel": "^6.0.1", @@ -76,8 +76,8 @@ "@types/lodash.uniq": "^4.5.9", "@types/lodash.uniqby": "^4.7.9", "@types/webpack": "^5.28.5", - "@typescript-eslint/eslint-plugin": "^7.2.0", - "@typescript-eslint/parser": "^7.2.0", + "@typescript-eslint/eslint-plugin": "^7.4.0", + "@typescript-eslint/parser": "^7.4.0", "css-loader": "^6.10.0", "eslint": "^8.57.0", "eslint-plugin-powerbi-visuals": "^0.8.1", @@ -98,7 +98,7 @@ "powerbi-visuals-utils-testutils": "^6.1.0", "style-loader": "^3.3.4", "ts-loader": "^9.5.1", - "typescript": "^5.4.2", - "webpack": "^5.90.3" + "typescript": "^5.4.3", + "webpack": "^5.91.0" } } diff --git a/pbiviz.json b/pbiviz.json index ce879d43..8d5ec1d5 100644 --- a/pbiviz.json +++ b/pbiviz.json @@ -1,15 +1,15 @@ { "visual": { "name": "Gantt", - "displayName": "Gantt 3.0.4.0", + "displayName": "Gantt 3.0.10.0", "guid": "Gantt1448688115699", "visualClassName": "Gantt", - "version": "3.0.4.0", + "version": "3.0.10.0", "description": "A Gantt chart is a type of bar chart which illustrates a project timeline or schedule. The Gantt Chart visual shows the Tasks, Start Dates, Durations, % Complete, and Resources for a project. The Gantt Chart visual can be used to show current schedule status using percent-complete shadings and a vertical \"TODAY\" line. The Legend may be used to group or filter tasks based upon data values.", "supportUrl": "https://community.powerbi.com", "gitHubUrl": "https://github.com/Microsoft/powerbi-visuals-gantt" }, - "apiVersion": "5.8.0", + "apiVersion": "5.9.0", "author": { "name": "Microsoft", "email": "pbicvsupport@microsoft.com" diff --git a/src/behavior.ts b/src/behavior.ts index b5fb97b7..f20c9b18 100644 --- a/src/behavior.ts +++ b/src/behavior.ts @@ -147,6 +147,7 @@ export class Behavior implements IInteractiveBehavior { y: event.clientY }); event.preventDefault(); + event.stopPropagation(); } }); @@ -159,30 +160,7 @@ export class Behavior implements IInteractiveBehavior { y: event.clientY }); event.preventDefault(); - } - }); - - this.options.subTasksCollapse.selection.on("contextmenu", (event: MouseEvent) => { - if (event) { - this.selectionHandler.handleContextMenu( - null, - { - x: event.clientX, - y: event.clientY - }); - event.preventDefault(); - } - }); - - this.options.allSubtasksCollapse.selection.on("contextmenu", (event: MouseEvent) => { - if (event) { - this.selectionHandler.handleContextMenu( - null, - { - x: event.clientX, - y: event.clientY - }); - event.preventDefault(); + event.stopPropagation(); } }); diff --git a/src/gantt.ts b/src/gantt.ts index 03037a21..393a638f 100644 --- a/src/gantt.ts +++ b/src/gantt.ts @@ -309,6 +309,8 @@ export class Gantt implements IVisual { private static TaskLineCoordinateX: number = 15; private static AxisLabelClip: number = 40; private static AxisLabelStrokeWidth: number = 1; + private static AxisTopMargin: number = 6; + private static CollapseAllLeftShift: number = 7.5; private static BarHeightMargin: number = 5; private static ChartLineHeightDivider: number = 4; private static ResourceWidthPadding: number = 10; @@ -329,6 +331,7 @@ export class Gantt implements IVisual { public static RectRound: number = 7; private static TimeScale: timeScale; + private xAxisProperties: IAxisProperties; private static get DefaultMargin(): IMargin { return { @@ -420,11 +423,6 @@ export class Gantt implements IVisual { .append("g") .classed(Gantt.Tasks.className, true); - // create tasks container - this.taskGroup = this.chartGroup - .append("g") - .classed(Gantt.Tasks.className, true); - // create axis container this.axisGroup = this.ganttSvg .append("g") @@ -476,6 +474,7 @@ export class Gantt implements IVisual { const taskLabelsWidth: number = this.viewModel.settings.taskLabelsCardSettings.show.value ? this.viewModel.settings.taskLabelsCardSettings.width.value : 0; + const scrollTop: number = event.target.scrollTop; const scrollLeft: number = event.target.scrollLeft; @@ -1702,6 +1701,7 @@ export class Gantt implements IVisual { }; const xAxisProperties: IAxisProperties = this.calculateAxes(viewportIn, this.textProperties, startDate, endDate, ticks, false); + this.xAxisProperties = xAxisProperties; Gantt.TimeScale = >xAxisProperties.scale; this.renderAxis(xAxisProperties); @@ -1726,7 +1726,7 @@ export class Gantt implements IVisual { private bindInteractivityService(tasks: Task[]): void { if (this.interactivityService) { const behaviorOptions: BehaviorOptions = { - clearCatcher: this.clearCatcher, + clearCatcher: this.body, taskSelection: this.taskGroup.selectAll(Gantt.SingleTask.selectorName), legendSelection: this.body.selectAll(Gantt.LegendItems.selectorName), subTasksCollapse: { @@ -2010,7 +2010,7 @@ export class Gantt implements IVisual { const categoriesAreaBackgroundColor: string = this.colorHelper.getThemeColor(); const isHighContrast: boolean = this.colorHelper.isHighContrast; - this.updateCollapseAllGroup(categoriesAreaBackgroundColor); + this.updateCollapseAllGroup(categoriesAreaBackgroundColor, taskLabelsShow); if (taskLabelsShow) { this.lineGroupWrapper @@ -2124,7 +2124,7 @@ export class Gantt implements IVisual { } } - private updateCollapseAllGroup(categoriesAreaBackgroundColor: string) { + private updateCollapseAllGroup(categoriesAreaBackgroundColor: string, taskLabelShow: boolean) { this.collapseAllGroup .selectAll("svg") .remove(); @@ -2138,7 +2138,10 @@ export class Gantt implements IVisual { .remove(); if (this.viewModel.isParentFilled) { - const categoryLabelsWidth: number = this.viewModel.settings.taskLabelsCardSettings.width.value; + const categoryLabelsWidth: number = this.viewModel.settings.taskLabelsCardSettings.show.value + ? this.viewModel.settings.taskLabelsCardSettings.width.value + : 0; + this.collapseAllGroup .append("rect") .attr("width", categoryLabelsWidth) @@ -2151,7 +2154,7 @@ export class Gantt implements IVisual { .attr("viewBox", "0 0 48 48") .attr("width", this.groupLabelSize) .attr("height", this.groupLabelSize) - .attr("x", 0) + .attr("x", Gantt.CollapseAllLeftShift + this.xAxisProperties.outerPadding || 0) .attr("y", this.secondExpandAllIconOffset) .attr(this.collapseAllFlag, (this.collapsedTasks.length ? "1" : "0")); @@ -2170,13 +2173,15 @@ export class Gantt implements IVisual { drawCollapseButton(expandCollapseButton, buttonExpandCollapseColor); } - this.collapseAllGroup - .append("text") - .attr("x", this.secondExpandAllIconOffset + this.groupLabelSize) - .attr("y", this.groupLabelSize) - .attr("font-size", "12px") - .attr("fill", this.colorHelper.getHighContrastColor("foreground", Gantt.DefaultValues.CollapseAllTextColor)) - .text(this.collapsedTasks.length ? this.localizationManager.getDisplayName("Visual_Expand_All") : this.localizationManager.getDisplayName("Visual_Collapse_All")); + if (taskLabelShow) { + this.collapseAllGroup + .append("text") + .attr("x", this.secondExpandAllIconOffset + this.groupLabelSize) + .attr("y", this.groupLabelSize) + .attr("font-size", "12px") + .attr("fill", this.colorHelper.getHighContrastColor("foreground", Gantt.DefaultValues.CollapseAllTextColor)) + .text(this.collapsedTasks.length ? this.localizationManager.getDisplayName("Visual_Expand_All") : this.localizationManager.getDisplayName("Visual_Collapse_All")); + } } } @@ -2396,19 +2401,15 @@ export class Gantt implements IVisual { * @param barsRoundedCorners are bars with rounded corners */ private drawTaskRect(task: Task, taskConfigHeight: number, barsRoundedCorners: boolean): string { - // milestones are already rendered in the function MilestonesRender - if (task.Milestones && task.Milestones.length > 0) { - return undefined; - } - const x = this.hasNotNullableDates ? Gantt.TimeScale(task.start) : 0, y = Gantt.getBarYCoordinate(task.index, taskConfigHeight) + (task.index + 1) * this.getResourceLabelTopMargin(), width = this.getTaskRectWidth(task), height = Gantt.getBarHeight(taskConfigHeight), radius = Gantt.RectRound; - if (barsRoundedCorners) { - return drawRoundedRectByPath(x, y, width + Gantt.RectRound, height, radius); + + if (barsRoundedCorners && width >= 2 * radius) { + return drawRoundedRectByPath(x, y, width, height, radius); } return drawNotRoundedRectByPath(x, y, width, height); @@ -2640,7 +2641,7 @@ export class Gantt implements IVisual { x = x - width / 2; } - if (this.formattingSettings.generalCardSettings.barsRoundedCorners.value) { + if (this.formattingSettings.generalCardSettings.barsRoundedCorners.value && width >= 2 * radius) { return drawRoundedRectByPath(x, y, width, height, radius); } @@ -3109,13 +3110,13 @@ export class Gantt implements IVisual { const translateYValue: number = Gantt.TaskLabelsMarginTop + (this.ganttDiv.node() as SVGSVGElement).scrollTop; this.axisGroup - .attr("transform", SVGManipulations.translate(settings.taskLabelsCardSettings.width.value + margin.left + Gantt.SubtasksLeftMargin, translateYValue)); + .attr("transform", SVGManipulations.translate(translateXValue, translateYValue)); translateXValue = (this.ganttDiv.node() as SVGSVGElement).scrollLeft; this.lineGroup .attr("transform", SVGManipulations.translate(translateXValue, 0)); this.collapseAllGroup - .attr("transform", SVGManipulations.translate(0, margin.top / 4)); + .attr("transform", SVGManipulations.translate(0, margin.top / 4 + Gantt.AxisTopMargin)); } private getMilestoneLineLength(numOfTasks: number): number { diff --git a/src/utils.ts b/src/utils.ts index df058e95..c43f50e6 100644 --- a/src/utils.ts +++ b/src/utils.ts @@ -3,7 +3,7 @@ import lodashRange from "lodash.range"; export const drawRoundedRectByPath = (x: number, y: number, width: number, height: number, radius: number) => { if (!width || !height) { - return; + return undefined; } const r = radius; @@ -23,7 +23,7 @@ export const drawRoundedRectByPath = (x: number, y: number, width: number, heigh export const drawNotRoundedRectByPath = (x: number, y: number, width: number, height: number) => { if (!width || !height) { - return; + return undefined; } return ` M${x},${y} diff --git a/stringResources/ar-SA/resources.resjson b/stringResources/ar-SA/resources.resjson index 4f7c0766..7150821a 100644 --- a/stringResources/ar-SA/resources.resjson +++ b/stringResources/ar-SA/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "وسيلة إيضاح", "Role_Task": "المهمة", + "Role_Parent": "الأصل", "Role_StartDate": "تاريخ البدء", "Role_EndDate": "تاريخ الانتهاء", "Role_Duration": "مدة", "Role_Completion": "نسبة الاكتمال", "Role_Resource": "المورد", + "Role_Milestones": "المراحل الرئيسية", "Role_Tooltips": "تلميحات الأداة", "Visual_General": "عام", + "Visual_Short_Description": "أحد أنواع المخطط الشريطي التي توضح فترة زمنية لمشروع أو جدوله الزمني مع الموارد", + "Visual_Long_Description": "مخطط جانت هو أحد أنواع المخطط الشريطي لتوضيح جدول مع محور الوقت. عند وضع مخطط جانت جنبًا إلى جنب مع مخططات مميزة أخرى في لوحة تفاعلية، يمكنك إدارة مشروعك بطريقة جديدة. في Power BI مع تفاعل مرئيات مع بعضها البعض، يمكنك الاطلاع على تخصيص الموارد واكتمال المهمة والمهام المتبقية من منظور مختلف والتحكم في المستقبل.\nتعتبر مخططات جانت جزءًا ضروريًا في قائمة إدارة المشروع. يحب المدراء التنفيذيون ومدراء المشروع مخططات جانت، وذلك لأنها تعرض بطريقة موجزة وفعالة جدًا، الخط الزمني الشامل للمشروع والحالة الحالية والتقدم (أو النقص في هذا وذاك) مع المهمة بتفاصيل كبيرة.\nباستخدام هذه المرئيات المخصصة، يمكنك تحديد المهام وتاريخ البدء والمدة والنسبة المئوية للاكتمال لعرضها على جانت. الرجاء ملاحظة أنه من المتوقع أن تكون النسبة المئوية للاكتمال قيمة عشرية (على سبيل المثال فإن 0.85 تعني 85%) و تاريخ البدء حقل تاريخ وليس تسلسل هيكلي للتاريخ.\nيمكنك أيضا التحكم في لون الشريط بوسيلة إيضاح. يمكنك استخدام أي حقل ذي صلة من مشروعك كوسيلة إيضاح على سبيل المثال نوع المهمة لهذا الغرض. بالإضافة إلى ذلك، يمكنك أيضا تحديد حقل المورد، والذي قد يكون مسردًا بجانب الشريط في جانت.\nفيما يلي مرئيات مصدر مفتوح. احصل على التعليمات البرمجية من GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "مهام المجموعة", "Visual_ScrollToCurrentTime": "تمرير إلى الوقت الحالي", "Visual_DaysOff": "العطلات", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "إعدادات المهمة", "Visual_TaskSettings_Color": "لون المهمة", "Visual_TaskSettings_Height": "الارتفاع", - "Visual_TaskSettings_RoundedCorners": "الزوايا المستديرة", + "Visual_BarsRoundedCorners": "زوايا أشرطة مستديرة", "Visual_DataLabels": "تسميات البيانات", "Visual_CategoryLabels": "تسميات الفئة", "Visual_Type": "النوع", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "دقائق", "Visual_DurationUnit_Seconds": "ثوانٍ", "Visual_DurationMinimum": "الحد الأدنى للمدة", - "Role_Parent": "الأصل", "Visual_SubTasks": "المهام الفرعية", "Visual_InheritParentLegend": "وراثة وسيلة الإيضاح الأصل", "Visual_ParentDurationByChildren": "مدة الأصل حسب التابع", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "مُعيَّن", "Visual_Shape_Square": "تربيع", "Visual_Shape_Circle": "دائرة", - "Visual_Description_Milestones": "عرض خيارات المراحل الرئيسية" + "Visual_Description_Milestones": "عرض خيارات المراحل الرئيسية", + "Visual_Expand_All": "توسيع الكل", + "Visual_Collapse_All": "طي الكل" } \ No newline at end of file diff --git a/stringResources/bg-BG/resources.resjson b/stringResources/bg-BG/resources.resjson index dced3c9c..06e2bde7 100644 --- a/stringResources/bg-BG/resources.resjson +++ b/stringResources/bg-BG/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Легенда", "Role_Task": "Задача", + "Role_Parent": "Родителски", "Role_StartDate": "Начална дата", "Role_EndDate": "Крайна дата", "Role_Duration": "Продължителност", "Role_Completion": "% завършване", "Role_Resource": "Ресурс", + "Role_Milestones": "Контролни точки", "Role_Tooltips": "Пояснения", "Visual_General": "Общи", + "Visual_Short_Description": "Вид стълбовидна диаграма, която показва времева линия на проект или график с ресурси", + "Visual_Long_Description": "Диаграмата на Гант е вид стълбовидна диаграма, която илюстрира график с времева ос. При поставяне на диаграмата на Гант до други аналитични диаграми в интерактивно платно можете да управлявате проекта си по изцяло нов начин. В Power BI, където визуалните обекти си взаимодействат, може да преглеждате разпределението на ресурсите, степента на завършване на задачите и оставащите задачи в различна перспектива и да получите инструменти за по-ефективен контрол на бъдещите резултати.\nДиаграмите на Гант са необходима част от портфолиото за управление на проекти. Проектните мениджъри и ръководителите обичат да използват диаграмите на Гант, тъй като само с един поглед те показват визуално по много ефективен начин цялата времева линия на проекта, текущото състояние и напредъка (или липсата на такъв), както и възложената задача със значителни подробности.\nЧрез този персонализиран визуален обект можете да укажете задачите, началната дата, продължителността и % на завършване и да ги рендирате като диаграма на Гант. Обърнете внимание, че %Completion изисква десетична стойност (например 0,85 означава 85%), а началната дата изисква поле за дата вместо йерархия на дати.\nМожете също така да управлявате цвета на стълба чрез легенда. За целта можете да използвате всяко подходящо поле от проекта като легенда, като например типа на задачата. Освен това можете да укажете полето с ресурси, което ще бъде показано до стълба в диаграмата на Гант.\nТова е визуален обект с отворен код. Може да получите кода от GitHub на адрес: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Групови задачи", "Visual_ScrollToCurrentTime": "Превъртане до текущия час", "Visual_DaysOff": "Почивни дни", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Настройки на задача", "Visual_TaskSettings_Color": "Цвят на задача", "Visual_TaskSettings_Height": "Височина", - "Visual_TaskSettings_RoundedCorners": "Заоблени ъгли", + "Visual_BarsRoundedCorners": "Заоблени ъгли", "Visual_DataLabels": "Етикети на данни", "Visual_CategoryLabels": "Етикети на категория", "Visual_Type": "Тип", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Минути", "Visual_DurationUnit_Seconds": "Секунди", "Visual_DurationMinimum": "Минимална продължителност", - "Role_Parent": "Родителски", "Visual_SubTasks": "Подзадачи", "Visual_InheritParentLegend": "Наследяване на родителска легенда", "Visual_ParentDurationByChildren": "Родителска продължителност от дъщерни елементи", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Ромб", "Visual_Shape_Square": "Квадрат", "Visual_Shape_Circle": "Кръг", - "Visual_Description_Milestones": "Показване на опциите за контролни точки" + "Visual_Description_Milestones": "Показване на опциите за контролни точки", + "Visual_Expand_All": "Разгъване на всички", + "Visual_Collapse_All": "Сгъване на всички" } \ No newline at end of file diff --git a/stringResources/ca-ES/resources.resjson b/stringResources/ca-ES/resources.resjson index 916cc9f4..b1278f0c 100644 --- a/stringResources/ca-ES/resources.resjson +++ b/stringResources/ca-ES/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Llegenda", "Role_Task": "Tasca", + "Role_Parent": "Principal", "Role_StartDate": "Data d'inici", "Role_EndDate": "Data final", "Role_Duration": "Durada", "Role_Completion": "Percentatge de finalització", "Role_Resource": "Recurs", + "Role_Milestones": "Fites", "Role_Tooltips": "Indicadors de funcions", "Visual_General": "General", + "Visual_Short_Description": "Tipus de gràfic de barres que il·lustra la cronologia d'un projecte o la programació amb els recursos.", + "Visual_Long_Description": "El gràfic de Gantt és un tipus de gràfic de barres que permet il·lustrar una programació amb un eix temporal. Si col·loqueu un gràfic de Gantt amb altres gràfics informatius en un llenç interactiu, podreu administrar els vostres projectes d'una manera totalment nova. Al Power BI, atès que els elements visuals interactuen els uns amb els altres, podeu consultar l'assignació de recursos, el procés de les tasques i les feines pendents d'una perspectiva diferent i tenir el futur sota control.\nEls gràfics de Gantt són una part indispensable de la cartera de l'administració de projectes. Als administradors de projectes i al personal directiu els encanten els gràfics de Gantt, ja que permeten mostrar de manera efectiva i d'una ullada la cronologia general d'un projecte, l'estat i el progrés, juntament amb les assignacions, amb un nivell de detall important.\nAmb aquest element visual personalitzat, podeu especificar les tasques, la data d'inici, la duració i el percentatge de finalització per representar-les en un format de Gantt. Tingueu en compte que el percentatge de finalització s'expressa en valors decimals, és a dir, 0,85 correspon al 85 %, i que la data d'inici és un camp de data i no una jerarquia.\nTambé podeu controlar el color de la barra amb una llegenda. Podeu fer servir qualsevol camp del projecte que sigui rellevant com a llegenda, per exemple, el tipus de tasca. A més, podeu especificar el camp de recurs, que es mostrarà al costat de la barra al gràfic de Gantt.\nAquest element visual és de codi obert. Podeu obtenir el codi al GitHub, a https://github.com/Microsoft/powerbi-visuals-gantt.", "Visual_GroupTasks": "Agrupa les tasques", "Visual_ScrollToCurrentTime": "Desplaça a l'hora actual", "Visual_DaysOff": "Dies lliures", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Configuració de la tasca", "Visual_TaskSettings_Color": "Color de la tasca", "Visual_TaskSettings_Height": "Alçada", - "Visual_TaskSettings_RoundedCorners": "Extrems arrodonits", + "Visual_BarsRoundedCorners": "Barres amb cantonades arrodonides", "Visual_DataLabels": "Etiquetes de dades", "Visual_CategoryLabels": "Etiquetes de categoria", "Visual_Type": "Tipus", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minuts", "Visual_DurationUnit_Seconds": "Segons", "Visual_DurationMinimum": "Durada mínima", - "Role_Parent": "Principal", "Visual_SubTasks": "Subtasques", "Visual_InheritParentLegend": "Hereta la llegenda principal", "Visual_ParentDurationByChildren": "Durada principal per element secundari", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rombe", "Visual_Shape_Square": "Quadrat", "Visual_Shape_Circle": "Cercle", - "Visual_Description_Milestones": "Mostra les opcions de fites" + "Visual_Description_Milestones": "Mostra les opcions de fites", + "Visual_Expand_All": "Expandeix-ho tot", + "Visual_Collapse_All": "Redueix-ho tot" } \ No newline at end of file diff --git a/stringResources/cs-CZ/resources.resjson b/stringResources/cs-CZ/resources.resjson index e5712d7e..e58e2f28 100644 --- a/stringResources/cs-CZ/resources.resjson +++ b/stringResources/cs-CZ/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Úkol", + "Role_Parent": "Nadřazený", "Role_StartDate": "Počáteční datum", "Role_EndDate": "Koncové datum", "Role_Duration": "Doba trvání", "Role_Completion": "% dokončení", "Role_Resource": "Prostředek", + "Role_Milestones": "Milníky", "Role_Tooltips": "Popisky", "Visual_General": "Obecné", + "Visual_Short_Description": "Typ pruhového grafu, který ukazuje časovou osu projektu nebo plán se zdroji", + "Visual_Long_Description": "Ganttův diagram je typ pruhového grafu, který slouží ke znázornění plánu s časovou osou. Když Ganttův diagram společně s dalšími užitečnými grafy vložíte na interaktivní plátno, získáte zcela nové možnosti správy svého projektu. V Power BI vizuály komunikují mezi sebou, a tak se můžete podívat na přidělení prostředků, stavy dokončení úkolů a zbývající úkoly z různých úhlů pohledu a získat jasnou vizi do budoucnosti.\nGanttovy diagramy jsou nepostradatelnou součástí portfolia správy projektů. Projektoví a výkonní manažeři Ganttovy diagramy milují, protože na první pohled vizuálně a velmi efektivně zobrazují přehled celkové časové osy projektu, aktuální stav a postup (nebo informaci o tom, že se příliš nepostupuje) a poměrně podrobně popsaná přiřazení.\nDíky tomuto vlastnímu vizuálu můžete zadávat úkoly, datum zahájení, trvání a procento dokončení a to vše vykreslit jako Ganttův diagram. Upozorňujeme, že se u procenta dokončení očekává desetinná hodnota (například 0.85 znamená 85 %) a u data zahájení datové pole, nikoli datová hierarchie.\nMůžete také určit barvu panelu s legendou. Jako legendu můžete použít libovolné odpovídající pole z projektu, například typ úlohy pro tento účel. Navíc můžete také zadat pole prostředku, který bude uveden v Ganttově diagramu vedle panelu.\nTento vizuál je typu open source. Kód můžete získat z Githubu: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Skupinové úkoly", "Visual_ScrollToCurrentTime": "Posunout na aktuální čas", "Visual_DaysOff": "Dny volna", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Nastavení úkolu", "Visual_TaskSettings_Color": "Barva úkolu", "Visual_TaskSettings_Height": "Výška", - "Visual_TaskSettings_RoundedCorners": "Zaoblené rohy", + "Visual_BarsRoundedCorners": "Zaoblené rohy pruhů", "Visual_DataLabels": "Popisky dat", "Visual_CategoryLabels": "Popisky kategorií", "Visual_Type": "Typ", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minuty", "Visual_DurationUnit_Seconds": "Sekundy", "Visual_DurationMinimum": "Minimální doba trvání", - "Role_Parent": "Nadřazený", "Visual_SubTasks": "Dílčí úkoly", "Visual_InheritParentLegend": "Zdědit legendu nadřazeného objektu", "Visual_ParentDurationByChildren": "Doba trvání nadřazených objektů podle podřízených", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Kosočtverec", "Visual_Shape_Square": "Čtverec", "Visual_Shape_Circle": "Kruh", - "Visual_Description_Milestones": "Zobrazit možnosti milníků" + "Visual_Description_Milestones": "Zobrazit možnosti milníků", + "Visual_Expand_All": "Rozbalit vše", + "Visual_Collapse_All": "Sbalit vše" } \ No newline at end of file diff --git a/stringResources/da-DK/resources.resjson b/stringResources/da-DK/resources.resjson index 632f4f3f..350aa4e8 100644 --- a/stringResources/da-DK/resources.resjson +++ b/stringResources/da-DK/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Forklaring", "Role_Task": "Opgave", + "Role_Parent": "Overordnet", "Role_StartDate": "Startdato", "Role_EndDate": "Slutdato", "Role_Duration": "Varighed", "Role_Completion": "% fuldført", "Role_Resource": "Ressource", + "Role_Milestones": "Milepæle", "Role_Tooltips": "Værktøjstip", "Visual_General": "Generelt", + "Visual_Short_Description": "En type liggende søjlediagram, som illustrerer en projekts tidslinje eller tidsplan med ressourcer", + "Visual_Long_Description": "Ganttdiagrammet er en type søjlediagram til at illustrere en tidsplan med tidsakse. Når du lægger Ganttdiagrammet sammen med andre nyttige diagrammer i et interaktivt lærred, kan du administrere projektet på en helt ny måde. Mens visualiseringer interagerer med hinanden i Power BI, kan du se på din ressourceallokering, opgaveudførelse og resterende opgaver i et andet perspektiv og få godt styr på fremtiden.\nGanttdiagrammer er en uundværlig del af projektstyringsporteføljen. Projektledere og direktører er glade for Ganttdiagrammer, da de visuelt præsenter, i en effektiv og hurtigt opfattet form, den overordnede tidslinje i projektet, den aktuelle status og fremdrift (eller mangel på samme) sammen med en detaljeret gennemgang af opgaven.\nMed denne brugerdefinerede visualisering kan du angive opgaver, startdato, varighed og %Completion (fuldførelse) og gengive dem som Gantt. Bemærk, at %Completion forventer en decimalværdi (for eksempel 0,85 betyder 85 %) og startdatoen, en dato og ikke en datohierarki.\nDu kan også styre farven på værktøjslinjen med en forklaring. Du kan bruge de relevante felter fra projektet som forklaring f.eks. opgavetype til dette formål. Derudover kan du også angive ressourcefeltet, der ville blive angivet ved siden af bjælken i Gantt.\nDette er en visualisering med åben kildekode. Koden kan hentes hos GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Gruppeopgaver", "Visual_ScrollToCurrentTime": "Rul til aktuel tid", "Visual_DaysOff": "Fridage", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Indstillinger for opgave", "Visual_TaskSettings_Color": "Opgavefarve", "Visual_TaskSettings_Height": "Højde", - "Visual_TaskSettings_RoundedCorners": "Afrundede hjørner", + "Visual_BarsRoundedCorners": "Afrundede hjørner af søjler", "Visual_DataLabels": "Datamærkater", "Visual_CategoryLabels": "Kategorietiketter", "Visual_Type": "Type", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minutter", "Visual_DurationUnit_Seconds": "Sekunder", "Visual_DurationMinimum": "Min. varighed", - "Role_Parent": "Overordnet", "Visual_SubTasks": "Underordnede opgaver", "Visual_InheritParentLegend": "Overtag overordnet forklaring", "Visual_ParentDurationByChildren": "Overordnet varighed af underordnede elementer", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rhombus", "Visual_Shape_Square": "Kvadrat", "Visual_Shape_Circle": "Cirkel", - "Visual_Description_Milestones": "Vis indstillinger for milepæle" + "Visual_Description_Milestones": "Vis indstillinger for milepæle", + "Visual_Expand_All": "Udvid alt", + "Visual_Collapse_All": "Skjul alle" } \ No newline at end of file diff --git a/stringResources/de-DE/resources.resjson b/stringResources/de-DE/resources.resjson index 7105d019..3e7bc950 100644 --- a/stringResources/de-DE/resources.resjson +++ b/stringResources/de-DE/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legende", "Role_Task": "Aufgabe", + "Role_Parent": "Übergeordnetes Element", "Role_StartDate": "Startdatum", "Role_EndDate": "Enddatum", "Role_Duration": "Dauer", "Role_Completion": "% abgeschlossen", "Role_Resource": "Ressource", + "Role_Milestones": "Meilensteine", "Role_Tooltips": "QuickInfos", "Visual_General": "Allgemein", + "Visual_Short_Description": "Ein Typ eines Balkendiagramms, der einen Projektzeitplan mit Ressourcen anzeigt.", + "Visual_Long_Description": "Ein Gantt-Diagramm ist ein Balkendiagramm, das einen Ablaufplan mit einer Zeitachse veranschaulicht. Wenn Sie ein Gantt-Diagramm zusammen mit anderen aufschlussreichen Diagrammen auf eine interaktive Canvas platzieren, können Sie Ihr Projekt auf eine ganz neue Art und Weise verwalten. Da Visuals in Power BI miteinander interagieren, können Sie sich Ihre Ressourcenzuordnungen sowie abgeschlossene und ausstehende Aufgaben aus verschiedenen Blickwinkeln ansehen und haben die Zukunft Ihres Projekts fest im Griff.\nGantt-Diagramme sind ein unentbehrlicher Bestandteil des Projektmanagementportfolios. Projektmanager und ihre Vorgesetzten sind begeistert von Gantt-Diagrammen, weil diese den kompletten Zeitablauf eines Projekts, den aktuellen Status und Fortschritt (bzw. Stillstand) sowie alle Zuordnungen mit hoher Detailgenauigkeit und dennoch effektiv auf einen Blick sichtbar machen.\nMit diesem benutzerdefinierten Visual können Sie Aufgaben, Startdatum, Dauer und Prozentsatz der Fertigstellung angeben, damit diese Werte als Gantt-Diagramm gerendert werden. Hinweis: Für den Prozentsatz der Fertigstellung wird ein Dezimalwert (0,85 bedeutet 85 %) und ein Startdatum erwartet (ein Datumsfeld, keine Datumshierarchie).\nSie können auch die Farbe der Balken mit einer Legende steuern. Zu diesem Zweck können Sie jedes beliebige relevante Feld aus Ihrem Projekt als Legende verwenden, wie z. B. den Aufgabentyp. Darüber hinaus können Sie auch das Ressourcenfeld angeben, das im Gantt-Diagramm neben dem Balken angezeigt werden soll.\nDies ist ein Open Source-Visual. Rufen Sie den Code aus GitHub ab: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Tasks gruppieren", "Visual_ScrollToCurrentTime": "Zum aktuellen Zeitpunkt scrollen", "Visual_DaysOff": "Freie Tage", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Aufgabeneinstellungen", "Visual_TaskSettings_Color": "Farbe für Aufgaben", "Visual_TaskSettings_Height": "Höhe", - "Visual_TaskSettings_RoundedCorners": "Abgerundete Ecken", + "Visual_BarsRoundedCorners": "Balken mit abgerundeten Ecken", "Visual_DataLabels": "Datenbeschriftungen", "Visual_CategoryLabels": "Kategoriebeschriftungen", "Visual_Type": "Typ", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minuten", "Visual_DurationUnit_Seconds": "Sekunden", "Visual_DurationMinimum": "Dauer (Minuten)", - "Role_Parent": "Übergeordnetes Element", "Visual_SubTasks": "Unteraufgaben", "Visual_InheritParentLegend": "Übergeordnete Legende erben", "Visual_ParentDurationByChildren": "Dauer für übergeordnetes Element nach untergeordnetem Element", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rhombus", "Visual_Shape_Square": "Quadrat", "Visual_Shape_Circle": "Kreis", - "Visual_Description_Milestones": "Optionen für Meilensteine anzeigen" + "Visual_Description_Milestones": "Optionen für Meilensteine anzeigen", + "Visual_Expand_All": "Alle erweitern", + "Visual_Collapse_All": "Alle reduzieren" } \ No newline at end of file diff --git a/stringResources/el-GR/resources.resjson b/stringResources/el-GR/resources.resjson index fecb09d3..6b205b47 100644 --- a/stringResources/el-GR/resources.resjson +++ b/stringResources/el-GR/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Υπόμνημα", "Role_Task": "Εργασία", + "Role_Parent": "Γονικό", "Role_StartDate": "Ημερομηνία έναρξης", "Role_EndDate": "Ημερομηνία λήξης", "Role_Duration": "Διάρκεια", "Role_Completion": "% ολοκλήρωσης", "Role_Resource": "Πόρος", + "Role_Milestones": "Ορόσημα", "Role_Tooltips": "Συμβουλές εργαλείων", "Visual_General": "Γενικά", + "Visual_Short_Description": "Ένας τύπος γραφήματος ράβδων που απεικονίζει μια λωρίδα χρόνου έργου ή το χρονοδιάγραμμα με πόρους", + "Visual_Long_Description": "Το γράφημα Gantt είναι ένας τύπος γραφήματος ράβδων για την απεικόνιση ενός χρονοδιαγράμματος με άξονα χρόνου. Όταν τοποθετείτε ένα γράφημα Gantt μαζί με άλλα γραφήματα σε έναν αλληλεπιδραστικό καμβά, μπορείτε να διαχειριστείτε το έργο σας με εντελώς νέο τρόπο. Στο Power BI, καθώς οι απεικονίσεις αλληλεπιδρούν μεταξύ τους, μπορείτε να εξετάσετε την εκχώρηση πόρων, την ολοκλήρωση της εργασίας και τις εργασίες που απομένουν με διαφορετική προοπτική και να αποκτήσετε μια σαφή άποψη για τις εξελίξεις.\nΤα γραφήματα Gantt είναι απαραίτητο μέρος του έργου διαχείρισης χαρτοφυλακίου. Οι διαχειριστές έργων και τα στελέχη εκτιμούν τα γραφήματα Gantt, καθώς απεικονίζουν πολύ αποτελεσματικά με μια ματιά, τη συνολική λωρίδα χρόνου του έργου, την τρέχουσα κατάσταση και την εξέλιξη (ή τη στασιμότητα) της ανάθεσης, με λεπτομέρειες.\nΣε αυτή την προσαρμοσμένη απεικόνιση, μπορείτε να καθορίσετε τις εργασίες, την ημερομηνία έναρξης, τη διάρκεια και το ποσοστό ολοκλήρωσης για την απόδοσή τους ως Gantt. Λάβετε υπόψη ότι το ποσοστό ολοκλήρωσης αναμένει μια δεκαδική τιμή (για παράδειγμα 0,85 σημαίνει 85%) και η Ημερομηνία έναρξης, ένα πεδίο ημερομηνίας και όχι μια ιεραρχία ημερομηνιών.\nΜπορείτε επίσης να ελέγξετε το χρώμα της γραμμής με ένα υπόμνημα. Μπορείτε να χρησιμοποιήσετε οποιοδήποτε σχετικό πεδίο από το έργο σας ως υπόμνημα για αυτόν το σκοπό, για παράδειγμα τύπο εργασίας. Επιπλέον, μπορείτε να καθορίσετε το πεδίο πόρου που θα αναφέρεται δίπλα στη γραμμή στο Gantt.\nΑυτό είναι μια απεικόνιση ανοιχτού κώδικα. Αποκτήστε τον κώδικα από το GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Εργασίες ομάδας", "Visual_ScrollToCurrentTime": "Κύλιση στην τρέχουσα χρονική στιγμή", "Visual_DaysOff": "Άδεια", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Ρυθμίσεις εργασίας", "Visual_TaskSettings_Color": "Χρώμα εργασίας", "Visual_TaskSettings_Height": "Ύψος", - "Visual_TaskSettings_RoundedCorners": "Στρογγυλεμένες γωνίες", + "Visual_BarsRoundedCorners": "Ράβδοι στρογγυλεμένες γωνίες", "Visual_DataLabels": "Ετικέτες δεδομένων", "Visual_CategoryLabels": "Ετικέτες κατηγοριών", "Visual_Type": "Τύπος", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Λεπτά", "Visual_DurationUnit_Seconds": "Δευτερόλεπτα", "Visual_DurationMinimum": "Ελάχιστη διάρκεια", - "Role_Parent": "Γονικό", "Visual_SubTasks": "Δευτερεύουσες εργασίες", "Visual_InheritParentLegend": "Μεταβίβαση γονικού υπομνήματος", "Visual_ParentDurationByChildren": "Διάρκεια γονικού στοιχείου με βάση τα θυγατρικά στοιχεία", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Ρόμβος", "Visual_Shape_Square": "Τετράγωνο", "Visual_Shape_Circle": "Κύκλος", - "Visual_Description_Milestones": "Εμφάνιση επιλογών ορόσημων" + "Visual_Description_Milestones": "Εμφάνιση επιλογών ορόσημων", + "Visual_Expand_All": "Ανάπτυξη όλων", + "Visual_Collapse_All": "Σύμπτυξη όλων" } \ No newline at end of file diff --git a/stringResources/es-ES/resources.resjson b/stringResources/es-ES/resources.resjson index 352a22b0..726b780f 100644 --- a/stringResources/es-ES/resources.resjson +++ b/stringResources/es-ES/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Leyenda", "Role_Task": "Tarea", + "Role_Parent": "Primario", "Role_StartDate": "Fecha de inicio", "Role_EndDate": "Fecha de finalización", "Role_Duration": "Duración", "Role_Completion": "Porcentaje de finalización", "Role_Resource": "Recurso", + "Role_Milestones": "Hitos", "Role_Tooltips": "Información sobre herramientas", "Visual_General": "General", + "Visual_Short_Description": "Tipo de gráfico de barras donde se muestra una escala de tiempo de un proyecto o una programación con recursos.", + "Visual_Long_Description": "El diagrama de Gantt es un tipo de gráfico de barras para mostrar una programación con un eje de tiempo. Al colocar un diagrama de Gantt con otros gráficos relevantes en un lienzo interactivo, podrá administrar el proyecto de una forma completamente nueva. En Power BI, como los objetos visuales interactúan entre sí, puede analizar la asignación de recursos, la finalización de tareas y las tareas restantes con otra perspectiva y obtener una representación firme de los valores futuros.\nLos diagramas de Gantt son una parte indispensable de la cartera de administración de proyectos. A los jefes de proyecto y los directivos les encantan los diagramas de Gantt, ya que muestran a simple vista y de forma efectiva la escala de tiempo general del proyecto, el estado actual y el progreso (o su falta de ello), así como la tarea, con detalles considerables.\nCon este objeto visual personalizado, puede especificar las tareas, la fecha de inicio, la duración y el porcentaje de finalización para representarlos como un diagrama de Gantt. Tenga en cuenta que el porcentaje de finalización espera un valor decimal (por ejemplo, 0,85 equivale a 85 %) y la fecha de inicio espera un campo de fecha, no una jerarquía de fechas.\nTambién puede controlar el color de la barra con una leyenda. Puede usar cualquier campo relevante del proyecto como leyenda (por ejemplo, el tipo de tarea) para esta finalidad. Además, también puede especificar el campo del recurso, que se mostraría junto a la barra en el diagrama de Gantt.\nEste es un objeto visual de código abierto. Descargue el código desde GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Agrupar tareas", "Visual_ScrollToCurrentTime": "Desplazar a la hora actual", "Visual_DaysOff": "Días libres", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Configuración de tarea", "Visual_TaskSettings_Color": "Color de tarea", "Visual_TaskSettings_Height": "Alto", - "Visual_TaskSettings_RoundedCorners": "Esquinas redondeadas", + "Visual_BarsRoundedCorners": "Esquinas redondeadas de barras", "Visual_DataLabels": "Etiquetas de datos", "Visual_CategoryLabels": "Etiquetas de categoría", "Visual_Type": "Tipo", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minutos", "Visual_DurationUnit_Seconds": "Segundos", "Visual_DurationMinimum": "Duración mínima", - "Role_Parent": "Primario", "Visual_SubTasks": "Subtareas", "Visual_InheritParentLegend": "Heredar leyenda del elemento primario", "Visual_ParentDurationByChildren": "Duración del elemento primario según los secundarios", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rombo", "Visual_Shape_Square": "Cuadrado", "Visual_Shape_Circle": "Círculo", - "Visual_Description_Milestones": "Mostrar opciones de hitos" + "Visual_Description_Milestones": "Mostrar opciones de hitos", + "Visual_Expand_All": "Expandir todo", + "Visual_Collapse_All": "Contraer todo" } \ No newline at end of file diff --git a/stringResources/et-EE/resources.resjson b/stringResources/et-EE/resources.resjson index 45e62841..902148c8 100644 --- a/stringResources/et-EE/resources.resjson +++ b/stringResources/et-EE/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legend", "Role_Task": "Ülesanne", + "Role_Parent": "Ema", "Role_StartDate": "Alguskuupäev", "Role_EndDate": "Lõppkuupäev", "Role_Duration": "Kestus", "Role_Completion": "% lõpuleviimine", "Role_Resource": "Ressurss", + "Role_Milestones": "Vahekokkuvõtted", "Role_Tooltips": "Kohtspikrid", "Visual_General": "Üldine", + "Visual_Short_Description": "Teatud tüüpi lintdiagramm, mis illustreerib projekti ajakava koos ressurssidega", + "Visual_Long_Description": "Gantti diagramm on teatud tüüpi lintdiagramm, mis illustreerib ajakava koos ajateljega. Kui panete Gantti diagrammi koos teiste ülevaatlike diagrammide interaktiivsele lõuendile, saate hallata oma projekti täiesti uuel viisil. Kui Power BI-s visuaalid üksteisega interakteeruvad, saata vaadata oma ressursieraldust, ülesannete täitmist ja allesjäänud ülesandeid uuest vaatenurgast ning saate tulevikust selge ülevaate.\nGantti diagrammid on projektihalduse portfoolio asendamatu osa. Projektijuhtidele ja tegevjuhtidele meeldivad Gantti diagrammid väga, sest need kuvavad visuaalselt ja väga tõhusalt projekti üldise ajaskaala, praeguse oleku ja edusammud (või nende puudumise) koos ülesandega märkimisväärselt üksikasjalikult.\nSelle kohandatud visuaaliga saate määratleda ülesanded, alguskuupäeva, kestuse ja lõpule viimise protsendi nende renderdamiseks Gantti diagrammina. Pange tähele, et lõpule viimise protsent eeldab kümnendväärtust (nt, 0,85 tähendab 85%) ja alguskuupäeva, kuupäeva välja ja mitte kuupäeva hierarhiat.\nLegendiga saate ka kontrollida riba värvi. Saate legendina kasutada oma projekti mis tahes asjakohast välja, näiteks sel eesmärgil ülesande tüüpi. Saate määratleda ka ressursivälja, mis esitatakse riba kõrval Ganttis.\nSee on avatud lähtekoodiga visuaal. Hankige kood GitHubist: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Rühma tööülesanded", "Visual_ScrollToCurrentTime": "Keri praegusesse aega", "Visual_DaysOff": "Puhkepäevad", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Tööülesande sätted", "Visual_TaskSettings_Color": "Tööülesande värv", "Visual_TaskSettings_Height": "Kõrgus", - "Visual_TaskSettings_RoundedCorners": "Ümarad nurgad", + "Visual_BarsRoundedCorners": "Ribade ümarad nurgad", "Visual_DataLabels": "Andmesildid", "Visual_CategoryLabels": "Kategooriasildid", "Visual_Type": "Tüüp", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minutid", "Visual_DurationUnit_Seconds": "Sekundid", "Visual_DurationMinimum": "Kestus min", - "Role_Parent": "Ema", "Visual_SubTasks": "Alamülesanded", "Visual_InheritParentLegend": "Tuleta vanemlegend", "Visual_ParentDurationByChildren": "Vanema tütarelementide poolne kestus", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Romb", "Visual_Shape_Square": "Ruut", "Visual_Shape_Circle": "Ring", - "Visual_Description_Milestones": "Kuva vahekokkuvõtete suvandid" + "Visual_Description_Milestones": "Kuva vahekokkuvõtete suvandid", + "Visual_Expand_All": "Laienda kõik", + "Visual_Collapse_All": "Ahenda kõik" } \ No newline at end of file diff --git a/stringResources/eu-ES/resources.resjson b/stringResources/eu-ES/resources.resjson index 287cd5de..9b942473 100644 --- a/stringResources/eu-ES/resources.resjson +++ b/stringResources/eu-ES/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Zeregina", + "Role_Parent": "Nagusia", "Role_StartDate": "Hasiera-data", "Role_EndDate": "Amaiera-data", "Role_Duration": "Iraupena", "Role_Completion": "Osatutako %", "Role_Resource": "Baliabidea", + "Role_Milestones": "Mugarriak", "Role_Tooltips": "Argibideak", "Visual_General": "Orokorra", + "Visual_Short_Description": "Proiektuen kronologia edo antolaketa baliabideekin batera ilustratzen dituen barra-diagrama mota", + "Visual_Long_Description": "Antolaketa bat denbora-ardatz batean erakusteko erabiltzen den barra-diagrama da Gantt diagrama. Xehetasun asko dituzten beste diagrama batzuekin batera jartzen duzunean oihal interaktibo batean, proiektua modu berri-berri batean kudea dezakezula ikusiko duzu. Power BI-n, elementu bisualak elkarrekintzan jardun ahala, beste ikuspegi batetik ikusiko dituzu baliabide-esleipena, nahiz burututako zereginak eta egiteke daudenak. Horrela, errazago erabaki ahal izango duzu zer egin behar den aurrerantzean.\nGantt diagramak ezinbestekoak dira proiektuen kudeaketarako. Proiektuen kudeatzaile eta buruei asko gustatzen zaizkie Gantt diagramak, oso erraza baita begiratu batean xehetasun asko ikustea; adibidez, proiektuaren kronologia orokorra, uneko egoera eta aurrerapena (edo haren eza) edo baliabideen esleipena.\nElementu bisual pertsonalizatu honekin, zereginak, hasiera-data, iraupena eta osatutako ehunekoa zehatz ditzakezu, Gantt diagrama gisa ager daitezen. Kontuan izan osatutako ehunekoa balio hamartar gisa ezarri behar dela (adibidez, 0,85 adieraziz gero, % 85 esan nahiko da). Hasiera-data, berriz, data-eremu bat da, eta ez data-hierarkia.\nHalaber, legenda bat erabil dezakezu barraren kolorea kontrolatzeko. Proiektuko edozein eremu erabil dezakezu legenda gisa (adibidez, zeregin mota), helburu berarekin. Gainera, baliabide-eremua ere zehatz dezakezu (Gantt diagramako barraren ondoan agertuko litzateke).\nKode irekikoa da elementu bisual hau. Eskuratu kodea GitHub-en: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Taldeko zereginak", "Visual_ScrollToCurrentTime": "Korritu uneko ordura", "Visual_DaysOff": "Oporrak", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Zereginaren ezarpenak", "Visual_TaskSettings_Color": "Zereginaren kolorea", "Visual_TaskSettings_Height": "Altuera", - "Visual_TaskSettings_RoundedCorners": "Ertz biribilduak", + "Visual_BarsRoundedCorners": "Barren ertz biribilduak", "Visual_DataLabels": "Datu-etiketak", "Visual_CategoryLabels": "Kategoria-etiketak", "Visual_Type": "Mota", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minutuak", "Visual_DurationUnit_Seconds": "Segundoak", "Visual_DurationMinimum": "Gutxieneko iraupena", - "Role_Parent": "Nagusia", "Visual_SubTasks": "Azpizereginak", "Visual_InheritParentLegend": "Heredatu legenda nagusia", "Visual_ParentDurationByChildren": "Elementu nagusiaren iraupena, bigarren mailakoen arabera", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Erronboa", "Visual_Shape_Square": "Karratua", "Visual_Shape_Circle": "Zirkulua", - "Visual_Description_Milestones": "Bistaratu mugarrien aukerak" + "Visual_Description_Milestones": "Bistaratu mugarrien aukerak", + "Visual_Expand_All": "Zabaldu dena", + "Visual_Collapse_All": "Tolestu dena" } \ No newline at end of file diff --git a/stringResources/fi-FI/resources.resjson b/stringResources/fi-FI/resources.resjson index a9e3992a..a65c8415 100644 --- a/stringResources/fi-FI/resources.resjson +++ b/stringResources/fi-FI/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Selite", "Role_Task": "Tehtävä", + "Role_Parent": "Pääkohde", "Role_StartDate": "Alkamispäivä", "Role_EndDate": "Lopetuspäivä", "Role_Duration": "Kesto", "Role_Completion": "Valmistumisprosentti", "Role_Resource": "Resurssi", + "Role_Milestones": "Välitavoitteet", "Role_Tooltips": "Työkaluvihjeet", "Visual_General": "Yleinen", + "Visual_Short_Description": "Palkkikaavion tyyppi, joka esittää projektin aikajanan tai aikataulun resurssien kanssa", + "Visual_Long_Description": "Gantt-kaavio on palkkikaaviotyyppi, joka havainnollistaa aikataulun aika-akselin kanssa. Kun asetat Gantt-kaavion yhdessä muiden merkityksellisten kaavioiden kanssa vuorovaikutteiselle pohjalle, voit hallita projektiasi kokonaan uudella tavalla. Power BI:ssä visualisoinnit ovat vuorovaikutuksessa toistensa kanssa, ja voit tarkastella resurssien varaamista, tehtävien valmistumista sekä jäljellä olevia tehtäviä eri perspektiivistä ja saada vakaan käsityksen tulevaisuudesta.\nGantt-kaaviot kuuluvat olennaisesti projektinhallinnan portfolioon. Projektipäälliköt ja johtajat rakastavat Gantt-kaavioita, koska ne näyttävät visuaalisesti erittäin tehokkaalla yhdellä silmäyksellä nähtävällä tavalla projektin kokonaisaikajanan, nykyisen tilan ja edistymisen (tai sen puutteen) yhdessä tehtävän kanssa merkittävän yksityiskohtaisesti.\nTämän mukautetun visualisoinnin avulla voit määrittää tehtävät, alkamispäivän, keston ja valmistumisprosentin hahmonnettaviksi Gantt-kaaviossa. Huomaa, että valmistumisprosentti odottaa desimaaliarvoa (esimerkiksi 0,85 tarkoittaa 85 prosenttia) ja alkamispäivää, joa on päivämääräkenttä, ei päivämäärähierarkia.\nVoit myös määrittää palkin värin selitteen avulla. Voit käyttää mitä tahansa asianmukaista kenttää projektistasi selitteenä esimerkiksi tehtävätyypille tähän tarkoitukseen. Lisäksi voit määrittää myös resurssikentän, joka näkyy palkin vieressä Gantt-kaaviossa.\nTämä on avoimeen lähdekoodiin perustuva visualisointi. Hanki koodi GitHubista: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Ryhmitä tehtävät", "Visual_ScrollToCurrentTime": "Selaa nykyiseen aikaan", "Visual_DaysOff": "Vapaapäivät", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Tehtäväasetukset", "Visual_TaskSettings_Color": "Tehtävän väri", "Visual_TaskSettings_Height": "Korkeus", - "Visual_TaskSettings_RoundedCorners": "Pyöristetyt kulmat", + "Visual_BarsRoundedCorners": "Palkit, pyöristetyt kulmat", "Visual_DataLabels": "Arvopisteiden nimet", "Visual_CategoryLabels": "Luokkaotsikot", "Visual_Type": "Tyyppi", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minuuttia", "Visual_DurationUnit_Seconds": "sekuntia", "Visual_DurationMinimum": "Kesto minuutteina", - "Role_Parent": "Pääkohde", "Visual_SubTasks": "Alitehtävät", "Visual_InheritParentLegend": "Peri ylemmän tason selite", "Visual_ParentDurationByChildren": "Ylemmän tason kesto alemman tason mukaan", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rhombus", "Visual_Shape_Square": "Neliö", "Visual_Shape_Circle": "Ympyrä", - "Visual_Description_Milestones": "Näytä välitavoitteiden asetukset" + "Visual_Description_Milestones": "Näytä välitavoitteiden asetukset", + "Visual_Expand_All": "Laajenna kaikki", + "Visual_Collapse_All": "Kutista kaikki" } \ No newline at end of file diff --git a/stringResources/fr-FR/resources.resjson b/stringResources/fr-FR/resources.resjson index 0d27b9ca..227f0c30 100644 --- a/stringResources/fr-FR/resources.resjson +++ b/stringResources/fr-FR/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Légende", "Role_Task": "Tâche", + "Role_Parent": "Parent", "Role_StartDate": "Date de début", "Role_EndDate": "Date de fin", "Role_Duration": "Durée", "Role_Completion": "Pourcentage de complétion", "Role_Resource": "Ressource", + "Role_Milestones": "Jalons", "Role_Tooltips": "Info-bulles", "Visual_General": "Général", + "Visual_Short_Description": "Type de graphique à barres qui illustre la chronologie ou la planification d'un projet avec des ressources", + "Visual_Long_Description": "Le diagramme de Gantt est un type de graphique à barres permettant d'illustrer une planification avec un axe de temps. Le fait de placer un diagramme de Gantt et d'autres graphiques détaillés dans une zone de dessin interactive vous permet de gérer votre projet de façon inédite. Dans Power BI, les visuels interagissent les uns avec les autres : vous pouvez ainsi voir sous un nouvel angle l'allocation des ressources, l'achèvement des tâches et les tâches restantes, et vous faire une bonne idée de ce que le futur vous réserve.\nLes diagrammes de Gantt font partie intégrante du portefeuille de gestion d'un projet. Les responsables de projet et les dirigeants les plébiscitent, car ils peuvent voir en un coup d'œil la chronologie d'ensemble du projet, son état actuel, sa progression (ou sa stagnation) ainsi qu'une somme considérable de détails.\nCe visuel personnalisé vous permet de spécifier des tâches, une date de début, une durée et le pourcentage d'achèvement à représenter dans un diagramme de Gantt. Notez que le pourcentage d'achèvement doit être une valeur décimale (par exemple, 0,85 signifie 85 %), et la date de début un champ de date (et non une hiérarchie de dates).\nVous pouvez également contrôler la couleur de la barre à l'aide d'une légende, à laquelle vous pouvez affecter n'importe quel champ pertinent de votre projet. Vous pouvez aussi spécifier le champ de ressource qui apparaît à côté de la barre dans le diagramme de Gantt.\nCe visuel est open source. Obtenez le code sur GitHub ici : https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Grouper les tâches", "Visual_ScrollToCurrentTime": "Aller à l'heure actuelle", "Visual_DaysOff": "Jours de congé", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Paramètres de la tâche", "Visual_TaskSettings_Color": "Couleur de la tâche", "Visual_TaskSettings_Height": "Hauteur", - "Visual_TaskSettings_RoundedCorners": "Coins arrondis", + "Visual_BarsRoundedCorners": "Barres Coins arrondis", "Visual_DataLabels": "Étiquettes de données", "Visual_CategoryLabels": "Étiquettes des catégories", "Visual_Type": "Type", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minutes", "Visual_DurationUnit_Seconds": "Secondes", "Visual_DurationMinimum": "Durée en minutes", - "Role_Parent": "Parent", "Visual_SubTasks": "Sous-tâches", "Visual_InheritParentLegend": "Hériter la légende du parent", "Visual_ParentDurationByChildren": "Durée du parent par les enfants", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rhombus", "Visual_Shape_Square": "Carré", "Visual_Shape_Circle": "Cercle", - "Visual_Description_Milestones": "Afficher les options de jalons" + "Visual_Description_Milestones": "Afficher les options de jalons", + "Visual_Expand_All": "Développer tout", + "Visual_Collapse_All": "Tout réduire" } \ No newline at end of file diff --git a/stringResources/gl-ES/resources.resjson b/stringResources/gl-ES/resources.resjson index 3813d93a..c7331c6f 100644 --- a/stringResources/gl-ES/resources.resjson +++ b/stringResources/gl-ES/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Lenda", "Role_Task": "Tarefa", + "Role_Parent": "Primaria", "Role_StartDate": "Data de inicio", "Role_EndDate": "Data de finalización", "Role_Duration": "Duración", "Role_Completion": "% completado", "Role_Resource": "Recurso", + "Role_Milestones": "Fitos", "Role_Tooltips": "Información sobre ferramentas", "Visual_General": "Xeral", + "Visual_Short_Description": "Un tipo de gráfica de barras que mostra a liña de tempo ou programación dun proxecto con recursos.", + "Visual_Long_Description": "A gráfica de Gantt é un tipo de gráfica de barras para mostrar a programación cun eixe de tempo. Ao poñer unha gráfica de Gantt xunto con outras gráficas detalladas nun lenzo interactivo, pode xestionar o proxecto dun xeito completamente novo. En Power BI, cando os elementos visuais interactúan entre eles, pode mirar a asignación de recursos, a finalización das tarefas, as tarefas restantes con outra perspectiva e obter unha representación dos valores futuros.\nAs gráficas de Gantt son unha parte indispensable da carteira de xestión de proxectos. Aos xestores de proxectos e executivos encántanlles as gráficas de Gantt porque mostran dun xeito visual e dunha ollada a liña xeral de tempo do proxecto, o estado e progreso actual (ou a falta deste) xunto coas tarefas, con bastantes detalles.\nCon este elemento visual personalizado, pode especificar as tarefas, a data de comezo, a duración e a porcentaxe de finalización para representalas como unha gráfica de Gantt. Teña en conta que a porcentaxe de finalización espera un valor decimal (por exemplo, 0,85 equivale ao 85 %) e a data de comezo espera un campo de data e non unha xerarquía de datas.\nTamén pode controlar a cor da barra cunha lenda. Pode usar calquera campo relevante do proxecto como lenda, por exemplo, o tipo de tarefa, con este fin. Ademais, pode especificar o campo de recurso, que aparecerá xunto á barra na gráfica de Gantt.\nEste é un elemento visual de código aberto. Obteña o código en GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Tarefas de grupo", "Visual_ScrollToCurrentTime": "Desprazarse á hora actual", "Visual_DaysOff": "Días libres", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Configuración da tarefa", "Visual_TaskSettings_Color": "Cor da tarefa", "Visual_TaskSettings_Height": "Altura", - "Visual_TaskSettings_RoundedCorners": "Esquinas arredondadas", + "Visual_BarsRoundedCorners": "Barras con esquinas arredondadas", "Visual_DataLabels": "Etiquetas de datos", "Visual_CategoryLabels": "Etiquetas de categorías", "Visual_Type": "Tipo", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minutos", "Visual_DurationUnit_Seconds": "Segundos", "Visual_DurationMinimum": "Minutos de duración", - "Role_Parent": "Primaria", "Visual_SubTasks": "Subtarefas", "Visual_InheritParentLegend": "Herdar lenda do obxecto principal", "Visual_ParentDurationByChildren": "Duración do elemento principal segundo os secundarios", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rombo", "Visual_Shape_Square": "Cadrado", "Visual_Shape_Circle": "Círculo", - "Visual_Description_Milestones": "Mostrar opcións de fitos" + "Visual_Description_Milestones": "Mostrar opcións de fitos", + "Visual_Expand_All": "Expandir todo", + "Visual_Collapse_All": "Contraer todo" } \ No newline at end of file diff --git a/stringResources/he-IL/resources.resjson b/stringResources/he-IL/resources.resjson index 781e7e15..04ab0943 100644 --- a/stringResources/he-IL/resources.resjson +++ b/stringResources/he-IL/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "מקרא", "Role_Task": "משימה", + "Role_Parent": "אב", "Role_StartDate": "תאריך התחלה", "Role_EndDate": "תאריך סיום", "Role_Duration": "‏‏משך", "Role_Completion": "אחוזי השלמה", "Role_Resource": "משאב", + "Role_Milestones": "אבני דרך", "Role_Tooltips": "תיאורי כלים", "Visual_General": "כללי", + "Visual_Short_Description": "סוג של תרשים עמודות שממחיש ציר זמן או לוח זמנים של פרויקט עם משאבים", + "Visual_Long_Description": "תרשים גנט הוא סוג של תרשים עמודות להמחשת לוח זמנים עם ציר זמן. בעת הצבת תרשים גנט יחד עם תרשימים אחרים מלאי תובנות בבד ציור אינטראקטיבי, תוכל לנהל את הפרויקט באופן חדש לחלוטין. מכיוון שעזרים חזותיים ב- Power BI מקיימים אינטראקציה עם זה, באפשרותך לסקור את ההקצאה של משאבים, ההשלמה של משימות והמשימות שנותרו בנקודת מבט שונה ולהתמודד בהצלחה עם המשך הפרויקט.\nתרשימי גנט הם חלק הכרחי בתיק ניהול פרויקטים. מנהלי פרויקטים ומנהלים בכירים אוהבים תרשימי גנט, מכיוון שהם מציגים חזותית ובאופן אפקטיבי מאוד ובמבט מהיר, את ציר הזמן הכולל של הפרויקט, את המצב הנוכחי וההתקדמות (או היעדר התקדמות) ביחד עם ההקצאה ברמת פירוט סבירה.\nבאפשרותך לציין באמצעות עזר חזותי מותאם אישית זה את הפרמטרים Tasks, Start Date, Duration ו- %Completion לעיבודם בתור תרשים גנט. לתשומת לבך, לפרמטר %Completion דרוש ערך עשרוני (לדוגמה, 0.85 פירושו 85%) ותאריך התחלה, שדה תאריך ולא הירארכיית תאריכים.\nבאפשרותך לשלוט גם בצבע העמודה באמצעות מקרא. באפשרותך להשתמש בכל שדה רלוונטי מהפרויקט שלך בתור מקרא, כגון סוג משימה למטרה זו. בנוסף, באפשרותך לציין גם את שדה המשאבים, שיירשם בצמוד לעמודה בתרשים הגנט.\nזהו עזר חזותי בקוד פתוח. הורד את הקוד מ- GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "משימות קבוצתיות", "Visual_ScrollToCurrentTime": "גלול אל השעה הנוכחית", "Visual_DaysOff": "ימי חופש", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "הגדרות משימה", "Visual_TaskSettings_Color": "צבע עבור משימות", "Visual_TaskSettings_Height": "גובה", - "Visual_TaskSettings_RoundedCorners": "פינות מעוגלות", + "Visual_BarsRoundedCorners": "פינות מעוגלות של עמודות", "Visual_DataLabels": "תוויות נתונים", "Visual_CategoryLabels": "תוויות קטגוריה", "Visual_Type": "סוג", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "‏‏דקות", "Visual_DurationUnit_Seconds": "שניות", "Visual_DurationMinimum": "משך זמן מינימלי", - "Role_Parent": "אב", "Visual_SubTasks": "משימות משנה", "Visual_InheritParentLegend": "קבל בירושה מקרא של אב", "Visual_ParentDurationByChildren": "משך של האב לפי צאצאים", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "מעוין", "Visual_Shape_Square": "ריבוע", "Visual_Shape_Circle": "מעגל", - "Visual_Description_Milestones": "הצג אפשרויות של אבני דרך" + "Visual_Description_Milestones": "הצג אפשרויות של אבני דרך", + "Visual_Expand_All": "הרחב הכל", + "Visual_Collapse_All": "כווץ הכל" } \ No newline at end of file diff --git a/stringResources/hi-IN/resources.resjson b/stringResources/hi-IN/resources.resjson index 564808ba..d4a730a0 100644 --- a/stringResources/hi-IN/resources.resjson +++ b/stringResources/hi-IN/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "लेजेंड", "Role_Task": "कार्य", + "Role_Parent": "पेरेंट", "Role_StartDate": "प्रारंभ दिनांक", "Role_EndDate": "समाप्ति दिनांक", "Role_Duration": "अवधि", "Role_Completion": "% पूर्णता", "Role_Resource": "संसाधन", + "Role_Milestones": "माइलस्टोन", "Role_Tooltips": "टूलटिप", "Visual_General": "सामान्य", + "Visual_Short_Description": "बार चार्ट का एक प्रकार, जो संसाधनों सहित किसी प्रोजेक्ट टाइमलाइन या शेड्यूल को समझाता है", + "Visual_Long_Description": "गैंट चार्ट समय अक्ष के साथ किसी शेड्यूल को समझाने के लिए बार चार्ट का एक प्रकार है. जब आप किसी सहभागी कैनवास में गैंट चार्ट को अन्य गहरी जानकारी वाले चार्ट्स के साथ रखते हैं, तो आप अपने प्रोजेक्ट को एकदम नए तरीके से प्रबंधित कर सकते हैं. Power BI में जैसे विज़ुअल एक दूसरे के साथ सहभागिता करते हैं, आप भिन्न परिप्रेक्ष्य में अपना संसाधन आबंटन, कार्य पूर्णता, शेष बचे कार्यों को देख सकते हैं और भविष्य में सख्ती से हैंडल कर सकते हैं.\nगैंट चार्ट प्रोजेक्ट मैनेजमेंट पोर्टफ़ोलियो का अपरिहार्य हिस्सा होते हैं. प्रोजेक्ट प्रबंधक और कार्यकारी गैंट चार्ट्स को बेहद पसंद करते हैं, क्योंकि ये एक ही नजर में बेहद प्रभावशाली ढंग से यथेष्ट विवरण के साथ प्रोजेक्ट की समूची टाइम लाइन, असाइनमेंट के साथ-साथ वर्तमान स्थिति और प्रगति (या इसमें कमी) को विज़ुअली दिखाते हैं.\nइस कस्टम विज़ुअल से आप कार्यों, प्रारंभ दिनांक, अवधि और %Completion को गैंट के रूप में रेंडरिंग के लिए निर्दिष्ट कर सकते हैं. कृपया नोट करें कि %Completion में एक दशमलव मान (उदाहरण के लिए, 0.85 का अर्थ है 85%) और प्रारंभ दिनांक, जो एक दिनांक फ़ील्ड है न कि दिनांक पदानुक्रम, अपेक्षित है.\nआप एक लेजेंड के साथ पट्टी का रंग भी नियंत्रित कर सकते हैं. इस उद्देश्य के लिए लेजेंड के रूप में आप अपने प्रोजेक्ट से किसी भी प्रासंगिक फ़ील्ड का उपयोग कर सकते हैं, उदाहरण के लिए, कार्य प्रकार. इसके अलावा आप संसाधन फ़ील्ड को भी निर्दिष्ट कर सकते हैं, जो गैंट में पट्टी के आगे सूचीबद्ध होगा.\nयह एक ओपन सोर्स विज़ुअल है. GitHub से कोड प्राप्त करें: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "समूह कार्य", "Visual_ScrollToCurrentTime": "वर्तमान समय में स्क्रॉल करें", "Visual_DaysOff": "दिन का अवकाश", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "कार्य सेटिंग्स", "Visual_TaskSettings_Color": "कार्य का रंग", "Visual_TaskSettings_Height": "ऊंचाई", - "Visual_TaskSettings_RoundedCorners": "गोल कोने", + "Visual_BarsRoundedCorners": "गोल कोनों वाली बार", "Visual_DataLabels": "डेटा लेबल्स", "Visual_CategoryLabels": "श्रेणी लेबल", "Visual_Type": "प्रकार", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "मिनट", "Visual_DurationUnit_Seconds": "सेकंड", "Visual_DurationMinimum": "न्यूनतम अवधि", - "Role_Parent": "पेरेंट", "Visual_SubTasks": "उप-कार्य", "Visual_InheritParentLegend": "पैरेंट लेजंड प्राप्त करें", "Visual_ParentDurationByChildren": "संतानों द्वारा पैरेंट ड्यूरेशन", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "विषमकोण", "Visual_Shape_Square": "वर्ग", "Visual_Shape_Circle": "वृत", - "Visual_Description_Milestones": "माइलस्टोन विकल्प प्रदर्शित करें" + "Visual_Description_Milestones": "माइलस्टोन विकल्प प्रदर्शित करें", + "Visual_Expand_All": "सभी को विस्तृत करें", + "Visual_Collapse_All": "सभी को संक्षिप्त करें" } \ No newline at end of file diff --git a/stringResources/hr-HR/resources.resjson b/stringResources/hr-HR/resources.resjson index 9c570248..3ffd1908 100644 --- a/stringResources/hr-HR/resources.resjson +++ b/stringResources/hr-HR/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Zadatak", + "Role_Parent": "Nadređena stavka", "Role_StartDate": "Datum početka", "Role_EndDate": "Datum završetka", "Role_Duration": "Trajanje", "Role_Completion": "Postotak dovršenosti", "Role_Resource": "Resurs", + "Role_Milestones": "Prekretnice", "Role_Tooltips": "Zaslonski opisi", "Visual_General": "Općenito", + "Visual_Short_Description": "Vrsta trakastog grafikona koja ilustrira vremensku crtu projekta ili raspored s resursima", + "Visual_Long_Description": "Ganttov grafikon vrsta je trakastog grafikona za ilustraciju rasporeda pomoću vremenske osi. Kada Ganttov grafikon dodate uz ostale informativne grafikone na interaktivnom radnom području, projektom možete upravljati na posve novi način. Kako u dodatku Power BI vizuali ostvaruju međusobnu interakciju, dodjelu resursa, dovršenost zadataka i preostale zadatke možete vidjeti iz drukčije perspektive i dobiti dobru predodžbu o budućnosti.\nGanttovi su grafikoni nezaobilazan dio portfelja za upravljanje projektima. Voditelji projekata i rukovoditelji vole Ganttove grafikone jer na vrlo učinkovit i pregledan način vizualno pokazuju cijelu vremensku crtu projekta, trenutni status i napredovanje (ili nenapredovanje) uz zadatak s brojnim detaljima.\nPomoću tog prilagođenog vizuala možete navesti zadatke, datum početka, trajanje i postotak dovršenosti za prikaz u obliku Ganttova grafikona. Imajte na umu da se za postotak dovršenosti očekuje decimalna vrijednost (npr. 0,85 znači 85 %), a za datum početka polje datumsko polje, a ne datumska hijerarhija.\nMožete i odrediti boju trake s legendom. Kao legendu za ogledni zadatak za ovu namjenu možete koristiti bilo koje relevantno polje iz projekta. Uz to, možete navesti polje resursa, koje će bit navedeno pokraj trake na Ganttovu grafikonu.\nTo je vizual otvorenog koda. Kod preuzmite sa servisa GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Grupni zadaci", "Visual_ScrollToCurrentTime": "Pomakni se na trenutno vrijeme", "Visual_DaysOff": "Slobodni dani", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Postavke zadatka", "Visual_TaskSettings_Color": "Boja zadatka", "Visual_TaskSettings_Height": "Visina", - "Visual_TaskSettings_RoundedCorners": "Zaobljeni kutovi", + "Visual_BarsRoundedCorners": "Zaobljeni kutovi traka", "Visual_DataLabels": "Oznake podataka", "Visual_CategoryLabels": "Oznake kategorija", "Visual_Type": "Vrsta", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minute", "Visual_DurationUnit_Seconds": "Sekunde", "Visual_DurationMinimum": "Trajanje u min", - "Role_Parent": "Nadređena stavka", "Visual_SubTasks": "Podzadaci", "Visual_InheritParentLegend": "Nasljeđivanje nadređene legende", "Visual_ParentDurationByChildren": "Trajanje nadređenih elemenata uz podređene elemente", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Romb", "Visual_Shape_Square": "Kvadrat", "Visual_Shape_Circle": "Krug", - "Visual_Description_Milestones": "Mogućnosti prikaza prekretnice" + "Visual_Description_Milestones": "Mogućnosti prikaza prekretnice", + "Visual_Expand_All": "Proširi sve", + "Visual_Collapse_All": "Sažmi sve" } \ No newline at end of file diff --git a/stringResources/hu-HU/resources.resjson b/stringResources/hu-HU/resources.resjson index 0d75bc0b..ebdda72b 100644 --- a/stringResources/hu-HU/resources.resjson +++ b/stringResources/hu-HU/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Jelmagyarázat", "Role_Task": "Feladat", + "Role_Parent": "Szülő", "Role_StartDate": "Kezdő dátum", "Role_EndDate": "Záró dátum", "Role_Duration": "Időtartam", "Role_Completion": "Befejezettség %-ban", "Role_Resource": "Erőforrás", + "Role_Milestones": "Mérföldkövek", "Role_Tooltips": "Elemleírások", "Visual_General": "Általános", + "Visual_Short_Description": "Olyan sávdiagram, amely egy projekt idővonalát vagy ütemezését jeleníti meg erőforrásokkal", + "Visual_Long_Description": "A Gantt-diagram ütemezéseket ábrázol egy időtengellyel. Ha Gantt-diagramot helyez el más információkat tartalmazó diagramokkal együtt egy interaktív vászonra, egészen új módon kezelheti a projektjét. Ahogy a Power BI-ban hatnak egymásra a látványelemek, másik nézőpontból figyelheti meg az erőforrás-elosztást, a feladatok előrehaladási állapotát és a fennmaradó feladatokat, és jobb képe lehet a jövőről.\nA Gantt-diagramok a projektkezelési portfóliók elengedhetetlen részei. A projektmenedzserek és a vezetők kedvelik a Gantt-diagramokat, mert első pillantásra látható módon jelenítik meg a projektek átfogó idővonalát valamint az aktuális előrehaladás (vagy azok hiányának) részletes információit a hozzárendelésekkel. \nAz egyéni vizualizációval megadhat feladatokat, kezdő dátumokat, időtartamokat és %Completion állapotokat, és a program ezeket rendereli Gantt-diagramként. Vegye figyelembe, hogy a %Completion (százalékos elkészülési) állapot tizedesjegyeket tartalmazó értéket ad (például a 0,85 érték 85%-ot jelent), a Kezdő dátum pedig egy dátummező, nem dátumhierarchia.\nA jelmagyarázat segítségével a sáv színét is megadhatja. Jelmagyarázatként használhatja a projekt bármely releváns területét, például a cél szerinti feladattípusokat. Emellett meghatározhatja az erőforrás mező tartalmát is, amely a Gantt-diagram sávja mellett fog megjelenni.\nEz a vizualizáció nyílt forráskódú. A kódot letöltheti a GitHubról: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Csoportos feladatok", "Visual_ScrollToCurrentTime": "Görgetés az aktuális időhöz", "Visual_DaysOff": "Szabadnapok", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Feladat beállításai", "Visual_TaskSettings_Color": "Feladat színe", "Visual_TaskSettings_Height": "Magasság", - "Visual_TaskSettings_RoundedCorners": "Lekerekített sarkok", + "Visual_BarsRoundedCorners": "Sávok, lekerekített sarkok", "Visual_DataLabels": "Adatfeliratok", "Visual_CategoryLabels": "Kategóriacímkék", "Visual_Type": "Típus", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Perc", "Visual_DurationUnit_Seconds": "Másodperc", "Visual_DurationMinimum": "Időtartam, perc", - "Role_Parent": "Szülő", "Visual_SubTasks": "Részfeladatok", "Visual_InheritParentLegend": "Szülő jelmagyarázat öröklése", "Visual_ParentDurationByChildren": "Szülő időtartama gyermekenként", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rombusz", "Visual_Shape_Square": "Négyzet", "Visual_Shape_Circle": "Kör", - "Visual_Description_Milestones": "Mérföldkő-beállítások megjelenítése" + "Visual_Description_Milestones": "Mérföldkő-beállítások megjelenítése", + "Visual_Expand_All": "Az összes kibontása", + "Visual_Collapse_All": "Az összes összecsukása" } \ No newline at end of file diff --git a/stringResources/id-ID/resources.resjson b/stringResources/id-ID/resources.resjson index 4c166de3..d2ef77e2 100644 --- a/stringResources/id-ID/resources.resjson +++ b/stringResources/id-ID/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Tugas", + "Role_Parent": "Induk", "Role_StartDate": "Tanggal Mulai", "Role_EndDate": "Tanggal Berakhir", "Role_Duration": "Durasi", "Role_Completion": "Penyelesaian %", "Role_Resource": "Sumber info", + "Role_Milestones": "Pencapaian", "Role_Tooltips": "Tip-alat", "Visual_General": "Umum", + "Visual_Short_Description": "Tipe bagan batang yang menampilkan garis waktu atau jadwal proyek dengan sumber daya", + "Visual_Long_Description": "Bagan Gantt adalah jenis bagan batang untuk menjelaskan jadwal dengan sumbu waktu. Ketika memasukkan bagan Gantt beserta bagan lain yang berisi wawasan ke kanvas interaktif, Anda dapat mengelola proyek dengan cara yang sepenuhnya baru. Di Power BI, ketika visual berinteraksi satu sama lain, Anda dapat melihat alokasi sumber daya, penyelesaian tugas, dan sisa tugas dalam perspektif yang berbeda serta memegang kendali yang kuat di masa mendatang.\nBagan Gantt merupakan bagian yang tak terpisahkan dari portofolio manajemen proyek. Manajer Proyek dan eksekutif menyukai bagan Gantt karena keseluruhan garis waktu proyek ditampilkan secara visual dengan sangat efektif, status & adanya kemajuan (atau tidak) beserta penugasan juga ditampilkan secara mendetail.\nDengan visual kustom ini, Anda dapat menetapkan Tugas, Tanggal Mulai, Durasi dan %Penyelesaian render sebagai Gantt. Perlu diketahui bahwa %Penyelesaian memperkirakan nilai desimal (misalnya 0,85 berarti 85%) dan Tanggal Mulai, bidang tanggal dan bukan hierarki tanggal.\nAnda juga dapat mengontrol warna bilah dengan Legenda. Anda dapat menggunakan salah satu bidang yang relevan dari proyek sebagai Legenda, misalnya tipe tugas untuk tujuan ini. Selain itu, Anda juga dapat menentukan bidang sumber daya, yang akan dicantumkan di samping bilah dalam Gantt.\nIni adalah visual sumber terbuka. Dapatkan kodenya dari GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Tugas Grup", "Visual_ScrollToCurrentTime": "Gulir ke waktu saat ini", "Visual_DaysOff": "Hari libur", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Pengaturan Tugas", "Visual_TaskSettings_Color": "Warna tugas", "Visual_TaskSettings_Height": "Tinggi", - "Visual_TaskSettings_RoundedCorners": "Sudut Dibulatkan", + "Visual_BarsRoundedCorners": "Bilah Sudut Bulat", "Visual_DataLabels": "Label Data", "Visual_CategoryLabels": "Label Kategori", "Visual_Type": "Jenis", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Menit", "Visual_DurationUnit_Seconds": "Detik", "Visual_DurationMinimum": "Durasi min", - "Role_Parent": "Induk", "Visual_SubTasks": "Sub tugas", "Visual_InheritParentLegend": "Dapatkan legenda induk", "Visual_ParentDurationByChildren": "Durasi induk berdasarkan anak", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Belah ketupat", "Visual_Shape_Square": "Kuadrat", "Visual_Shape_Circle": "Lingkaran", - "Visual_Description_Milestones": "Tampilkan opsi pencapaian" + "Visual_Description_Milestones": "Tampilkan opsi pencapaian", + "Visual_Expand_All": "Perluas Semua", + "Visual_Collapse_All": "Ciutkan Semua" } \ No newline at end of file diff --git a/stringResources/it-IT/resources.resjson b/stringResources/it-IT/resources.resjson index fc8af75f..bef05686 100644 --- a/stringResources/it-IT/resources.resjson +++ b/stringResources/it-IT/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Attività", + "Role_Parent": "Padre", "Role_StartDate": "Data di inizio", "Role_EndDate": "Data di fine", "Role_Duration": "Durata", "Role_Completion": "% di completamento", "Role_Resource": "Risorsa", + "Role_Milestones": "Attività cardine", "Role_Tooltips": "Descrizioni comando", "Visual_General": "Generale", + "Visual_Short_Description": "Tipo di grafico a barre che illustra la sequenza temporale o la pianificazione di un progetto con le risorse", + "Visual_Long_Description": "Il diagramma di Gantt è un tipo di grafico a barre che consente di illustrare una pianificazione con asse temporale. Quando si inserisce un diagramma di Gantt ad altri grafici dettagliati in un'area di disegno interattiva, è possibile gestire il progetto in un modo completamente nuovo. Quando in Power BI gli oggetti visivi interagiscono tra loro, è possibile esaminare l'allocazione delle risorse, il completamento delle attività, le attività rimanenti da un altro punto di vista e controllare meglio le attività future.\nI diagrammi di Gantt sono una parte indispensabile del portfolio di soluzioni per la gestione progetti. Project manager e dirigenti preferiscono i diagrammi di Gantt perché mostrano visivamente e in modo efficace la linea temporale generale del progetto, lo stato corrente e lo stato di avanzamento (o l'assenza di informazioni sullo stato) oltre all'assegnazione, tutto in modo molto dettagliato.\nCon questo oggetto visivo personalizzato, è possibile specificare le attività, la data di inizio, la durata e la percentuale di completamento per il rendering in un diagramma di Gantt. Tenere presente che per la percentuale di completamento è previsto un valore decimale, ovvero 0,85 per indicare l'85%, mentre per la data di inizio è previsto un campo data e non una gerarchia di date.\nÈ anche possibile controllare il colore della barra con una legenda. Come legenda si può usare qualsiasi campo del progetto, ad esempio il tipo di attività per questo scopo. È anche possibile specificare il campo risorsa, che verrà indicato accanto alla barra nel diagramma di Gantt.\nOggetto visivo open source. Il codice sorgente è disponibile su GitHub all'indirizzo https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Attività del gruppo", "Visual_ScrollToCurrentTime": "Scorri fino all'ora corrente", "Visual_DaysOff": "Giorni non lavorativi", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Impostazioni dell'attività", "Visual_TaskSettings_Color": "Colore per Attività", "Visual_TaskSettings_Height": "Altezza", - "Visual_TaskSettings_RoundedCorners": "Angoli arrotondati", + "Visual_BarsRoundedCorners": "Angoli arrotondati delle barre", "Visual_DataLabels": "Etichette dati", "Visual_CategoryLabels": "Etichette categorie", "Visual_Type": "Tipo", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minuti", "Visual_DurationUnit_Seconds": "Secondi", "Visual_DurationMinimum": "Durata (min)", - "Role_Parent": "Padre", "Visual_SubTasks": "Sottoattività", "Visual_InheritParentLegend": "Eredita la legenda padre", "Visual_ParentDurationByChildren": "Durata padre da elementi figlio", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rombo", "Visual_Shape_Square": "Quadrato", "Visual_Shape_Circle": "Cerchio", - "Visual_Description_Milestones": "Visualizza opzioni attività cardine" + "Visual_Description_Milestones": "Visualizza opzioni attività cardine", + "Visual_Expand_All": "Espandi tutto", + "Visual_Collapse_All": "Comprimi tutto" } \ No newline at end of file diff --git a/stringResources/ja-JP/resources.resjson b/stringResources/ja-JP/resources.resjson index 9ea9c016..3542cf8c 100644 --- a/stringResources/ja-JP/resources.resjson +++ b/stringResources/ja-JP/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "凡例", "Role_Task": "タスク", + "Role_Parent": "親", "Role_StartDate": "開始日", "Role_EndDate": "終了日", "Role_Duration": "期間", "Role_Completion": "達成率", "Role_Resource": "リソース", + "Role_Milestones": "マイルストーン", "Role_Tooltips": "ヒント", "Visual_General": "全般", + "Visual_Short_Description": "リソースのプロジェクトのタイムラインまたはスケジュールを示す横棒グラフの一種", + "Visual_Long_Description": "ガント チャートは横棒グラフの一種で、時間軸でスケジュールを示すときに使用します。ガント チャートを対話式キャンバスで分析情報に富んだ他のグラフと一緒に配置すると、プロジェクトをまったく新しい方法で管理できます。相互に連携する視覚エフェクトを利用できる Power BI では、リソース割り当て、タスクの完了、別のパースペクティブで残っているタスクを確認し、今後について確実に把握できるようにします。\nガント チャートは、プロジェクト管理ポートフォリオに不可欠な部分です。プロジェクト管理者と幹部はガント チャートが手放せません。プロジェクト、現在の状況、進行状況 (または不足しているもの) が、詳細情報を含む割り当てと一緒に、時系列で分かりやすい視覚エフェクトにより一目で確認できるためです。\nこのカスタム視覚エフェクトを使用すると、ガントとして表示するタスク、開始日、期間、達成率を指定できます。達成率には 10 進値 (たとえば、0.85 は 85% を意味します) と開始日 (日付の階層ではなく、日付フィールド) が必要になります。\n凡例で使用する横棒の色も制御できます。そのためには凡例として、プロジェクトの任意の関連フィールド (タスクの種類など) を使用できます。また、ガントで横棒の隣にリストされるリソース フィールドも指定できます。\nこれは、オープンソースの視覚エフェクトです。GitHub からコードを取得します。https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "グループ タスク", "Visual_ScrollToCurrentTime": "現在の時刻にスクロールする", "Visual_DaysOff": "非稼働日", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "タスクの設定", "Visual_TaskSettings_Color": "タスクの色", "Visual_TaskSettings_Height": "高さ", - "Visual_TaskSettings_RoundedCorners": "丸めた角", + "Visual_BarsRoundedCorners": "角を丸めたバー", "Visual_DataLabels": "データ ラベル", "Visual_CategoryLabels": "カテゴリ ラベル", "Visual_Type": "種類", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "分", "Visual_DurationUnit_Seconds": "秒", "Visual_DurationMinimum": "期間 (分)", - "Role_Parent": "親", "Visual_SubTasks": "サブタスク", "Visual_InheritParentLegend": "親の凡例を継承", "Visual_ParentDurationByChildren": "子ごとの親の期間", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "ひし形", "Visual_Shape_Square": "正方形", "Visual_Shape_Circle": "円", - "Visual_Description_Milestones": "マイルストーン オプションを表示します" + "Visual_Description_Milestones": "マイルストーン オプションを表示します", + "Visual_Expand_All": "すべて展開", + "Visual_Collapse_All": "すべて折りたたむ" } \ No newline at end of file diff --git a/stringResources/kk-KZ/resources.resjson b/stringResources/kk-KZ/resources.resjson index 64c34379..2cda8b08 100644 --- a/stringResources/kk-KZ/resources.resjson +++ b/stringResources/kk-KZ/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Шартты белгілер", "Role_Task": "Тапсырма", + "Role_Parent": "Негізгі", "Role_StartDate": "Басталу күні", "Role_EndDate": "Аяқталу күні", "Role_Duration": "Ұзақтық", "Role_Completion": "% аяқталу", "Role_Resource": "Ресурс", + "Role_Milestones": "Аралық кезеңдер", "Role_Tooltips": "Кеңестер", "Visual_General": "Жалпы", + "Visual_Short_Description": "Жобаның уақыт шкаласын немесе ресурстармен бірге кестені көрсететін жолақты диаграмма түрі", + "Visual_Long_Description": "Гант диаграммасы жоспарды уақыт осімен көрсетуге арналған жолақты диаграмма түрі болып табылады. Гант диаграммасын басқа ақпараттық диаграммалармен бірге интерактивтік кенепке қойсаңыз, жобаңызды бүтіндей басқа жолмен басқара аласыз. Power BI жүйесінде көрнекі элементтер бір-бірімен әрекеттесетіндіктен, ресурстарды бөлуге, тапсырмаларды орындауға, қалған тапсырмаларға басқа перспективадан қарай аласыз және болашаққа нық қарай аласыз.\nГант диаграммалары жобаны басқару портфелінің қажетті бөлігі болып табылады. Жоба менеджерлері мен басшылары Гант диаграммаларын ұнатады, себебі олар өте тиімді жолмен көрнекі түрде жобаның жалпы уақыт шкаласын, ағымдағы күйді және орындалу барысын (немесе оның жоқтығын) егжей-тегжейлі көрсетеді.\nБұл реттелетін көрнекі элемент көмегімен тапсырмаларды, басталу уақытын, ұзақтықты және %Орындалуды оларды Гант ретінде қарастыру үшін көрсете аласыз. %Орындалу үшін ондық мән (мысалы, 0,85 мәні 85% білдіреді) және басталу күні, күн өрісі, қажет, күн иерархиясы емес.\nЖолақ түсін шартты белгілермен басқара аласыз. Жобадан кез келген тиісті өрісті шартты белгілер ретінде пайдалануға болады, мысалы, осы мақсат үшін тапсырма түрі. Сонымен қатар, ресурс өрісін көрсете аласыз, ол Гант диаграммасында жолақтан кейін көрсетіледі.\nБұл ашық кодты көрнекі элемент. Кодты алыңыз: GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Тапсырмаларды топтау", "Visual_ScrollToCurrentTime": "Ағымдағы уақытқа жылжыту", "Visual_DaysOff": "Демалыс күндері", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Тапсырма параметрлері", "Visual_TaskSettings_Color": "Тапсырма түсі", "Visual_TaskSettings_Height": "Биіктігі", - "Visual_TaskSettings_RoundedCorners": "Дөңгеленген бұрыштар", + "Visual_BarsRoundedCorners": "Жолақтардың дөңгелек бұрыштары", "Visual_DataLabels": "Деректер белгілері", "Visual_CategoryLabels": "Санат белгілері", "Visual_Type": "Түр", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Минуттар", "Visual_DurationUnit_Seconds": "Секундтар", "Visual_DurationMinimum": "Ұзақтық мин.", - "Role_Parent": "Негізгі", "Visual_SubTasks": "Қосалқы тапсырмалар", "Visual_InheritParentLegend": "Негізгі мәндік белгілерді иелену", "Visual_ParentDurationByChildren": "Қосалқы арқылы негізгінің ұзақтығы", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Ромб", "Visual_Shape_Square": "Шаршы", "Visual_Shape_Circle": "Дөңгелек", - "Visual_Description_Milestones": "Аралық кезең параметрлерін көрсету" + "Visual_Description_Milestones": "Аралық кезең параметрлерін көрсету", + "Visual_Expand_All": "Бәрін шығарып алу", + "Visual_Collapse_All": "Бәрін тасалау" } \ No newline at end of file diff --git a/stringResources/ko-KR/resources.resjson b/stringResources/ko-KR/resources.resjson index 737f6846..c30e367a 100644 --- a/stringResources/ko-KR/resources.resjson +++ b/stringResources/ko-KR/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "범례", "Role_Task": "작업", + "Role_Parent": "부모", "Role_StartDate": "시작 날짜", "Role_EndDate": "종료 날짜", "Role_Duration": "지속 시간", "Role_Completion": "완료율(%)", "Role_Resource": "리소스", + "Role_Milestones": "마일스톤", "Role_Tooltips": "도구 설명", "Visual_General": "일반", + "Visual_Short_Description": "프로젝트 일정 또는 일정을 리소스와 함께 보여 주는 막대형 차트 유형입니다.", + "Visual_Long_Description": "Gantt 차트는 시간 축으로 일정을 나타내는 막대 차트 유형입니다. Gantt 차트를 다른 정보성 차트와 함께 대화형 캔버스에 사용하면 프로젝트를 완전히 새로운 방법으로 관리할 수 있습니다. Power BI에서는 시각적 개체가 서로 상호 작용하므로 리소스 할당, 완료된 작업, 남아 있는 작업을 다양한 관점에서 확인하고 향후 발생할 상황을 확실하게 이해할 수 있습니다.\nGantt 차트는 프로젝트 관리 포트폴리오에서 꼭 필요한 부분입니다. 프로젝트 관리자와 경영진이 Gantt 차트를 좋아하는 이유는 프로젝트의 전체 일정, 현재 상태 및 진행률(또는 부족한 부분)을 할당 정보와 함께 매우 자세히 표시하여 한눈에 효과적으로 파악할 수 있게 해 주기 때문입니다.\n이러한 사용자 지정 시각적 개체를 활용하면 Tasks, Start Date, Duration 및 %Completion을 Gantt로 렌더링하도록 지정할 수 있습니다. 참고로, %Completion은 10진수 값(예: 0.85는 85%를 의미함)이어야 하고 시작 날짜는 날짜 계층 구조가 아니라 날짜 필드입니다.\n범례를 사용하여 막대의 색상을 제어할 수도 있습니다. 프로젝트의 관련 필드를 범례로 사용할 수 있습니다(예: 이 용도의 작업 유형). 또한 Gantt의 막대 옆에 나열되는 리소스 필드도 지정할 수 있습니다.\n이는 오픈 소스 시각적 개체입니다. GitHub에서 코드를 받아 보세요. https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "그룹 작업", "Visual_ScrollToCurrentTime": "현재 시간으로 스크롤", "Visual_DaysOff": "휴가", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "작업 설정", "Visual_TaskSettings_Color": "작업 색", "Visual_TaskSettings_Height": "높이", - "Visual_TaskSettings_RoundedCorners": "둥근 모서리", + "Visual_BarsRoundedCorners": "바 둥근 모서리", "Visual_DataLabels": "데이터 레이블", "Visual_CategoryLabels": "범주 레이블", "Visual_Type": "형식", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "분", "Visual_DurationUnit_Seconds": "초", "Visual_DurationMinimum": "기간(분)", - "Role_Parent": "부모", "Visual_SubTasks": "하위 작업", "Visual_InheritParentLegend": "부모 범례 상속", "Visual_ParentDurationByChildren": "자식 요소별 부모 기간", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "마름모꼴", "Visual_Shape_Square": "제곱", "Visual_Shape_Circle": "원", - "Visual_Description_Milestones": "중요 시점 옵션 표시" + "Visual_Description_Milestones": "중요 시점 옵션 표시", + "Visual_Expand_All": "모두 펼치기", + "Visual_Collapse_All": "모두 접기" } \ No newline at end of file diff --git a/stringResources/lt-LT/resources.resjson b/stringResources/lt-LT/resources.resjson index 83c5cca2..4554b55e 100644 --- a/stringResources/lt-LT/resources.resjson +++ b/stringResources/lt-LT/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Užduotis", + "Role_Parent": "Pirminis", "Role_StartDate": "Pradžios data", "Role_EndDate": "Pabaigos data", "Role_Duration": "Trukmė", "Role_Completion": "% baigimas", "Role_Resource": "Išteklius", + "Role_Milestones": "Gairės", "Role_Tooltips": "Patarimai", "Visual_General": "Bendra", + "Visual_Short_Description": "Juostinės diagramos tipas, vaizduojantis projekto laiko juostą arba grafiką su ištekliais", + "Visual_Long_Description": "Ganto diagrama yra juostinės diagramos tipas, skirtas vaizduoti grafikui su laiko ašimi. Interaktyvioje drobėje Ganto diagramą įdėję su kitomis informatyviomis diagramomis, savo projektą galite valdyti visiškai nauju būdu. Tarnyboje „Power BI“ vaizdiniams elementams interaktyviai bendraujant tarpusavyje, galite iš kitos perspektyvos pažiūrėti į išteklių priskyrimą, užduočių įvykdymą, likusias užduotis ir tiksliai planuoti ateitį.\nGanto diagramos yra būtinai reikalinga projektų valdymo portfelio dalis. Projektų vadovams ir direktoriams Ganto diagramos labai patinka, nes jose labai efektyviai ir gana išsamiai parodoma bendroji projekto laiko juosta, dabartinė būsena ir eiga (ar jos nebuvimas) bei informacija apie priskyrimus – visa tai galima matyti vos pažvelgus į diagramą.\nNaudodami šį pasirinktinį vaizdinį elementą, kaip Ganto diagramą galite atvaizduoti nurodytus elementus Užduotys, Pradžios data, Trukmė ir Įvykdymo %. Atkreipkite dėmesį, kad su elementu Įvykdymo % reikia naudoti dešimtainę reikšmę (pavyzdžiui „0,85“ reiškia „85 %“), o Pradžios data turi būti datos laukas, o ne datų hierarchija.\nTaip pat elementu Legenda galite valdyti juostos spalvą. Šiuo tikslu kaip elementą Legenda galite naudoti bet kurį reikiamą projekto lauką, pavyzdžiui, užduoties tipo lauką. Be to, galite nurodyti išteklių lauką, kuris bus šalia juostos Ganto diagramoje.\nTai yra atvirojo kodo vaizdinis elementas. Šį kodą galite gauti iš „GitHub“: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Grupuoti užduotis", "Visual_ScrollToCurrentTime": "Slinkti į dabartinį laiką", "Visual_DaysOff": "Poilsio dienos", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Užduoties parametrai", "Visual_TaskSettings_Color": "Užduoties spalva", "Visual_TaskSettings_Height": "Aukštis", - "Visual_TaskSettings_RoundedCorners": "Suapvalinti kampai", + "Visual_BarsRoundedCorners": "Juostos suapvalintais kampais", "Visual_DataLabels": "Duomenų žymos", "Visual_CategoryLabels": "Kategorijų žymos", "Visual_Type": "Tipas", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minutės", "Visual_DurationUnit_Seconds": "Sekundės", "Visual_DurationMinimum": "Trukmė min.", - "Role_Parent": "Pirminis", "Visual_SubTasks": "Antrinės užduotys", "Visual_InheritParentLegend": "Paveldėta pirminė legenda", "Visual_ParentDurationByChildren": "Pirminė trukmė pagal antrinius elementus", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rombas", "Visual_Shape_Square": "Kvadratas", "Visual_Shape_Circle": "Apskritimas", - "Visual_Description_Milestones": "Rodyti gairių parinktis" + "Visual_Description_Milestones": "Rodyti gairių parinktis", + "Visual_Expand_All": "Išplėsti viską", + "Visual_Collapse_All": "Sutraukti viską" } \ No newline at end of file diff --git a/stringResources/lv-LV/resources.resjson b/stringResources/lv-LV/resources.resjson index eee12138..f3e9a2d2 100644 --- a/stringResources/lv-LV/resources.resjson +++ b/stringResources/lv-LV/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Apzīmējumi", "Role_Task": "Uzdevums", + "Role_Parent": "Vecākelements", "Role_StartDate": "Sākuma datums", "Role_EndDate": "Beigu datums", "Role_Duration": "Ilgums", "Role_Completion": "Pabeigšanas %", "Role_Resource": "Resurss", + "Role_Milestones": "Atskaites punkti", "Role_Tooltips": "Rīku padomi", "Visual_General": "Vispārīgi", + "Visual_Short_Description": "Joslu diagrammas veids, kurā attēlots projekta laika grafiks vai arī grafiks ar resursiem.", + "Visual_Long_Description": "Ganta diagramma ir joslu diagrammas veids, ko izmanto, lai attēlotu grafiku ar laika asi. Interaktīvajā pamatnē izmantojot Ganta diagrammu kopā ar citām noderīgām diagrammām, projektu varat pārvaldīt pavisam jaunā veidā. Pakalpojumā Power BI, kurā vizuālie dati savstarpēji mijiedarbojas, varat citā perspektīvā apskatīt resursu iedalīšanu, uzdevumu pabeigtību, atlikušos uzdevumus un gūt skaidru izpratni par gaidāmo.\nGanta diagrammas ir neatņemama projekta pārvaldības portfeļa daļa. Projektu vadītāji un vadošie darbinieki ir ļoti iecienījuši Ganta diagrammas, jo tajās ir vizuāli ļoti uzskatāmi un detalizēti parādīts vispārējais projekta laika grafiks, pašreizējais statuss un norise (vai to trūkums), kā arī informācija par piešķiršanu.\nIzmantojot šos pielāgotos vizuālos datus, varat norādīt atveidei Ganta diagrammā vienumus Uzdevumi, Sākuma datums, Ilgums un Pabeigtība (%). Ņemiet vērā, ka vienumam Pabeigtība (%) ir jānorāda decimālskaitļa vērtība (piemēram, 0,85 nozīmē 85%), savukārt vienumam Sākuma datums — datuma lauks, nevis datumu hierarhija.\nVarat arī kontrolēt joslas krāsu, izmantojot sadaļu Apzīmējumi. Kā apzīmējumu varat izmantot jebkuru atbilstošu projekta lauku, piemēram, uzdevuma veidu. Turklāt varat arī norādīt resursa lauku, kas Ganta diagrammā atrodas blakus joslai.\nŠie ir atklātā pirmkoda vizuālie dati. Iegūstiet kodu no GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Grupas uzdevumi", "Visual_ScrollToCurrentTime": "Ritināt līdz pašreizējam laikam", "Visual_DaysOff": "Brīvdienas", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Uzdevuma iestatījumi", "Visual_TaskSettings_Color": "Uzdevuma krāsa", "Visual_TaskSettings_Height": "Augstums", - "Visual_TaskSettings_RoundedCorners": "Noapaļoti stūri", + "Visual_BarsRoundedCorners": "Joslu noapaļotie stūri", "Visual_DataLabels": "Datu etiķetes", "Visual_CategoryLabels": "Kategoriju etiķetes", "Visual_Type": "Veidi", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minūtes", "Visual_DurationUnit_Seconds": "Sekundes", "Visual_DurationMinimum": "Minimālais ilgums", - "Role_Parent": "Vecākelements", "Visual_SubTasks": "Apakšuzdevumi", "Visual_InheritParentLegend": "Pārmantot vecākelementa apzīmējumus", "Visual_ParentDurationByChildren": "Vecākelementu ilgums pa bērnelementiem", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rombs", "Visual_Shape_Square": "Kvadrāts", "Visual_Shape_Circle": "Aplis", - "Visual_Description_Milestones": "Rādīt atskaites punktu opcijas" + "Visual_Description_Milestones": "Rādīt atskaites punktu opcijas", + "Visual_Expand_All": "Izvērst visu", + "Visual_Collapse_All": "Sakļaut visu" } \ No newline at end of file diff --git a/stringResources/ms-MY/resources.resjson b/stringResources/ms-MY/resources.resjson index 2d6cefc7..058b2856 100644 --- a/stringResources/ms-MY/resources.resjson +++ b/stringResources/ms-MY/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Petunjuk", "Role_Task": "Tugas", + "Role_Parent": "Induk", "Role_StartDate": "Tarikh Mula", "Role_EndDate": "Tarikh Tamat", "Role_Duration": "Tempoh", "Role_Completion": "% Pelengkapan", "Role_Resource": "Sumber", + "Role_Milestones": "Pencapaian", "Role_Tooltips": "Petua alat", "Visual_General": "Umum", + "Visual_Short_Description": "Jenis carta bar yang menggambarkan garis waktu projek atau jadual dengan sumber", + "Visual_Long_Description": "Carta Gantt adalah sejenis carta bar untuk menggambarkan jadual dengan paksi masa. Apabila anda meletakkan carta Gantt bersama-sama dengan carta wawasan lain dalam kanvas interaktif, anda boleh menguruskan projek anda dengan cara yang baru. Dalam Power BI sebagai visual berinteraksi antara satu sama lain, anda boleh melihat peruntukan sumber anda, penyelesaian tugas, baki tugas dalam perspektif yang berbeza dan dapatkan pegangan yang kukuh pada masa depan.\nCarta Gantt adalah sebahagian daripada portfolio pengurusan projek yang tidak diperlukan. Pengurus Projek dan eksekutif suka carta Gantt, kerana mereka secara visual menunjukkan dengan cara yang sangat berkesan, garis masa keseluruhan projek, status semasa & kemajuan (atau kekurangannya) bersama dengan tugasan pada butiran yang besar.\nDengan visual tersuai ini, anda boleh menentukan Tugas, Tarikh Mula, Tempoh dan %Completion untuk menjadikannya sebagai Gantt. Sila ambil perhatian bahawa %Completion menjangka nilai perpuluhan (contohnya 0.85 bermaksud 85%) dan Tarikh Mula, bidang tarikh dan bukan hierarki tarikh.\nAnda juga boleh mengawal warna bar dengan Legenda. Anda boleh menggunakan mana-mana medan yang berkaitan dari projek anda sebagai Legenda contoh jenis tugas untuk tujuan ini. Di samping itu, anda juga boleh menentukan medan sumber, yang akan disenaraikan di bar seterusnya dalam Gantt.\nIni adalah visual sumber terbuka. Dapatkan kod dari GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Tugas Kumpulan", "Visual_ScrollToCurrentTime": "Tatal ke masa semasa", "Visual_DaysOff": "Hari cuti", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Pengaturan Tugas", "Visual_TaskSettings_Color": "Warna tugas", "Visual_TaskSettings_Height": "Ketinggian", - "Visual_TaskSettings_RoundedCorners": "Sudut Bulat", + "Visual_BarsRoundedCorners": "Bar Sudut Bulat", "Visual_DataLabels": "Label Data", "Visual_CategoryLabels": "Label Kategori", "Visual_Type": "Jenis", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minit", "Visual_DurationUnit_Seconds": "Saat", "Visual_DurationMinimum": "Durasi min", - "Role_Parent": "Induk", "Visual_SubTasks": "Subtugasan", "Visual_InheritParentLegend": "Warisi petunjuk ibu bapa", "Visual_ParentDurationByChildren": "Tempoh ibu bapa mengikut anak", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rhombus", "Visual_Shape_Square": "Segi Empat Sama", "Visual_Shape_Circle": "Kumpulan", - "Visual_Description_Milestones": "Paparkan opsyen pencapaian" + "Visual_Description_Milestones": "Paparkan opsyen pencapaian", + "Visual_Expand_All": "Kembangkan Semua", + "Visual_Collapse_All": "Runtuhkan Semua" } \ No newline at end of file diff --git a/stringResources/nb-NO/resources.resjson b/stringResources/nb-NO/resources.resjson index 3ac14a82..4e7afdc4 100644 --- a/stringResources/nb-NO/resources.resjson +++ b/stringResources/nb-NO/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Forklaring", "Role_Task": "Oppgave", + "Role_Parent": "Overordnet", "Role_StartDate": "Startdato", "Role_EndDate": "Sluttdato", "Role_Duration": "Varighet", "Role_Completion": "% fullført", "Role_Resource": "Ressurs", + "Role_Milestones": "Milepæler", "Role_Tooltips": "Verktøytips", "Visual_General": "Generelt", + "Visual_Short_Description": "En stolpediagramtype som illustrerer en prosjekttidslinje eller tidsplan med ressurser", + "Visual_Long_Description": "Gantt-diagrammet er et type stolpediagram som brukes til å illustrere en tidsplan med tidsakse. Når du plasserer Gantt-diagrammet sammen med andre illustrerende diagrammer på et interaktivt lerret, kan du administrere prosjektet på helt ny måte. Når visualobjekter samhandler i Power BI, kan du ved å vise ressurstildelingen, oppgavegjennomføringen og gjenstående aktiviteter med ulike perspektiver, få god oversikt over fremdriften.\nGantt-diagram er en uunnværlig del av prosjektlederens portefølje. Prosjektledere og overordnede elsker Gantt-diagrammer fordi de raskt og effektivt viser hele tidslinjen til prosjektet, gjeldende status og fremdrift (eller mangel på fremdrift) sammen med tilordningen, med mange detaljer.\nMed dette tilpassede visualobjektet kan du angi aktiviteter, startdato, varighet og %fullføring, og gjengi dem i et Gantt-diagram. Legg merke til at %fullføring forventer en desimalverdi (0,85 betyr for eksempel 85%) og startdato, et datofelt og ikke et datohierarki.\nDu kan også kontrollere fargen på feltet med en forklaring. Du kan bruke alle relevante felt fra prosjektet som forklaring, for eksempel aktivitetstype. I tillegg kan du også angi ressursfeltet som skal vises ved siden av feltet i Gantt-diagrammet.\nDette er et visualobjekt med åpen kildekode. Hent koden fra GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Gruppeaktiviteter", "Visual_ScrollToCurrentTime": "Rull til gjeldende klokkeslett", "Visual_DaysOff": "Fridager", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Oppgaveinnstillinger", "Visual_TaskSettings_Color": "Oppgavefarge", "Visual_TaskSettings_Height": "Høyde", - "Visual_TaskSettings_RoundedCorners": "Avrundede hjørner", + "Visual_BarsRoundedCorners": "Stolper avrundede hjørner", "Visual_DataLabels": "Dataetiketter", "Visual_CategoryLabels": "Kategorietiketter", "Visual_Type": "Type", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minutter", "Visual_DurationUnit_Seconds": "sekunder", "Visual_DurationMinimum": "Varighet, min", - "Role_Parent": "Overordnet", "Visual_SubTasks": "Deloppgaver", "Visual_InheritParentLegend": "Arve overordnet forklaring", "Visual_ParentDurationByChildren": "Overordnet varighet etter underordnede", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rhombus", "Visual_Shape_Square": "Kvadrat", "Visual_Shape_Circle": "Sirkel", - "Visual_Description_Milestones": "Vis alternativer for milepæler" + "Visual_Description_Milestones": "Vis alternativer for milepæler", + "Visual_Expand_All": "Utvid alle", + "Visual_Collapse_All": "Skjul alle" } \ No newline at end of file diff --git a/stringResources/nl-NL/resources.resjson b/stringResources/nl-NL/resources.resjson index b7782309..98f627ea 100644 --- a/stringResources/nl-NL/resources.resjson +++ b/stringResources/nl-NL/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Taak", + "Role_Parent": "Bovenliggend item", "Role_StartDate": "Begindatum", "Role_EndDate": "Einddatum", "Role_Duration": "Duur", "Role_Completion": "Percentage voltooid", "Role_Resource": "Resource", + "Role_Milestones": "Mijlpalen", "Role_Tooltips": "Tooltips", "Visual_General": "Algemeen", + "Visual_Short_Description": "Een soort staafdiagram waarin een projecttijdlijn of -schema met resources wordt weergegeven", + "Visual_Long_Description": "Een Gantt-diagram is een soort staafdiagram waarin een schema met tijdas wordt weergegeven. Wanneer u een Gantt-diagram samen met andere informatieve diagrammen in een interactief canvas plaatst, kunt u het project op een geheel nieuwe manier beheren. In Power BI waar visuals op elkaar reageren, kunt u de resourcetoewijzing, de voltooiing van taken en resterende taken vanuit een ander perspectief bekijken en zo een betere grip krijgen op de toekomst.\nGantt-diagrammen zijn een onmisbaar onderdeel van het projectbeheerportfolio. Projectmanagers en leidinggevenden zijn dol op Gantt-diagrammen, omdat ze hierin op zeer efficiënte wijze in één oogopslag de algehele tijdlijn van het project en de huidige status en voortgang (of het gebrek daaraan), samen met de opdracht, met veel details kunnen bekijken.\nBij deze aangepaste visual kunt u de taken, de begindatum, de duur en het voltooiingspercentage opgeven en vervolgens het Gantt-diagram weergeven. Houd er rekening mee dat voor het voltooiingspercentage een decimale waarde moet worden opgegeven (zo staat 0,85 voor 85%) en voor begindatum moet een datum en geen datumhiërarchie worden opgegeven.\nU kunt ook de kleur van de balk bepalen met behulp van een legenda. U kunt hiervoor elk relevant veld uit het project als legenda gebruiken, bijvoorbeeld het veld Taaktype. Daarnaast kun u ook het resourceveld opgeven dat naast de balk in het Gantt-diagram wordt weergegeven.\nDit is een open source visual. U kunt de code op GitHub ophalen: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Groepstaken", "Visual_ScrollToCurrentTime": "Naar huidige tijd scrollen", "Visual_DaysOff": "Vrije dagen", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Taakinstellingen", "Visual_TaskSettings_Color": "Taakkleur", "Visual_TaskSettings_Height": "Hoogte", - "Visual_TaskSettings_RoundedCorners": "Afgeronde hoeken", + "Visual_BarsRoundedCorners": "Afgeronde hoeken van balken", "Visual_DataLabels": "Gegevenslabels", "Visual_CategoryLabels": "Categorielabels", "Visual_Type": "Type", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minuten", "Visual_DurationUnit_Seconds": "Seconden", "Visual_DurationMinimum": "Duur (min)", - "Role_Parent": "Bovenliggend item", "Visual_SubTasks": "Subtaken", "Visual_InheritParentLegend": "Bovenliggende legenda overnemen", "Visual_ParentDurationByChildren": "Duur van de bovenliggende item door onderliggende items", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rhombus", "Visual_Shape_Square": "Vierkant", "Visual_Shape_Circle": "Cirkel", - "Visual_Description_Milestones": "Opties voor mijlpalen weergeven" + "Visual_Description_Milestones": "Opties voor mijlpalen weergeven", + "Visual_Expand_All": "Alles uitvouwen", + "Visual_Collapse_All": "Alles samenvouwen" } \ No newline at end of file diff --git a/stringResources/pl-PL/resources.resjson b/stringResources/pl-PL/resources.resjson index 4607e74f..4358a463 100644 --- a/stringResources/pl-PL/resources.resjson +++ b/stringResources/pl-PL/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Zadanie", + "Role_Parent": "Nadrzędny", "Role_StartDate": "Data rozpoczęcia", "Role_EndDate": "Data zakończenia", "Role_Duration": "Czas trwania", "Role_Completion": "% ukończenia", "Role_Resource": "Zasób", + "Role_Milestones": "Kamienie milowe", "Role_Tooltips": "Etykietki narzędzi", "Visual_General": "Ogólne", + "Visual_Short_Description": "Typ wykresu słupkowego, który ilustruje oś czasu projektu lub harmonogram z zasobami", + "Visual_Long_Description": "Wykres Gantta to typ wykresu słupkowego umożliwiający zilustrowanie harmonogramu przy użyciu osi czasu. Po umieszczeniu wykresu Gantta wraz z innymi szczegółowymi wykresami na kanwie interaktywnej można zarządzać projektem w całkiem nowy sposób. W usłudze Power BI — ponieważ wizualizacje współpracują ze sobą — można sprawdzić alokację zasobów, postęp wykonywania zadania lub pozostałe zadania w innej perspektywie, aby uzyskać jasny obraz działania w przyszłości.\nWykresy Gantta są niezbędną częścią portfela zarządzania projektami. Kierownicy projektów i dyrektorzy lubią wykresy Gantta, ponieważ w bardzo efektywny, szybki sposób przedstawiają wizualnie ogólną oś czasu projektu, bieżący stan i postęp (lub jego brak) oraz przypisania na uzasadnionym poziomie szczegółowości.\nPrzy użyciu tej niestandardowej wizualizacji można określić zadania, datę rozpoczęcia, czas trwania i % ukończenia (%Completion) do renderowania w postaci wykresu Gantta. Należy zwrócić uwagę, że oczekiwana wartość % ukończenia (%Completion) to wartość dziesiętna (na przykład 0,85 oznacza 85%), a oczekiwana data rozpoczęcia to pole daty, a nie hierarchia dat.\nMożna również kontrolować kolor słupka przy użyciu legendy. W tym celu można używać wszystkich odpowiednich pól z projektu jako legendy dla przykładowego typu zadania. Ponadto można określić pole zasobu, które znajdzie się obok słupka na wykresie Gantta.\nJest to wizualizacja typu open source. Pobierz kod z usługi GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Grupuj zadania", "Visual_ScrollToCurrentTime": "Przewiń do bieżącej godziny", "Visual_DaysOff": "Dni wolne", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Ustawienia zadania", "Visual_TaskSettings_Color": "Kolor zadania", "Visual_TaskSettings_Height": "Wysokość", - "Visual_TaskSettings_RoundedCorners": "Zaokrąglone rogi", + "Visual_BarsRoundedCorners": "Słupki z zaokrąglonymi rogami", "Visual_DataLabels": "Etykiety danych", "Visual_CategoryLabels": "Etykiety kategorii", "Visual_Type": "Typ", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minuty", "Visual_DurationUnit_Seconds": "Sekundy", "Visual_DurationMinimum": "Czas trwania (min)", - "Role_Parent": "Nadrzędny", "Visual_SubTasks": "Podzadania", "Visual_InheritParentLegend": "Dziedzicz legendę elementu nadrzędnego", "Visual_ParentDurationByChildren": "Czas trwania elementu nadrzędnego według elementów podrzędnych", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Romb", "Visual_Shape_Square": "Kwadrat", "Visual_Shape_Circle": "Okrąg", - "Visual_Description_Milestones": "Wyświetl opcje kamieni milowych" + "Visual_Description_Milestones": "Wyświetl opcje kamieni milowych", + "Visual_Expand_All": "Rozwiń wszystkie", + "Visual_Collapse_All": "Zwiń wszystko" } \ No newline at end of file diff --git a/stringResources/pt-BR/resources.resjson b/stringResources/pt-BR/resources.resjson index 94cec324..4885773e 100644 --- a/stringResources/pt-BR/resources.resjson +++ b/stringResources/pt-BR/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Tarefa", + "Role_Parent": "Pai", "Role_StartDate": "Data de Início", "Role_EndDate": "Data de Término", "Role_Duration": "Duração", "Role_Completion": "% de Conclusão", "Role_Resource": "Recurso", + "Role_Milestones": "Marcos", "Role_Tooltips": "Dicas de ferramentas", "Visual_General": "Geral", + "Visual_Short_Description": "Um tipo de gráfico de barras que ilustra uma linha do tempo ou um agendamento de projeto com recursos", + "Visual_Long_Description": "O gráfico de Gantt é um tipo de gráfico de barras para ilustrar um agendamento com eixo temporal. Quando você coloca o gráfico de Gantt juntamente com outros gráficos introspectivos em uma tela interativa, você pode gerenciar seu projeto de forma totalmente nova. No Power BI, já que os visuais interagem uns com os outros, você pode examinar sua alocação de recurso, a conclusão de tarefas e as tarefas restantes em uma perspectiva diferente e obter um controle mais firme sobre o futuro.\nOs gráficos de Gantt são parte indispensável do portfólio de gerenciamento de projetos. Gerentes de projeto e executivos adoram gráficos de Gantt, pois eles mostram visualmente, de uma forma imediata muito eficaz, a linha do tempo geral do projeto, o status atual e o andamento (ou falta dele), juntamente com a atribuição e com detalhes consideráveis.\nCom esse visual personalizado, você pode especificar as Tarefas, Data de Início, Duração e % de Conclusão para renderizá-los como Gantt. Observe que a % de Conclusão espera um valor decimal (por exemplo, 0,85 significa 85%) e que Data de Início é um campo de data e não uma hierarquia de datas.\nVocê também pode controlar a cor da barra com uma Legenda. Você pode usar qualquer campo relevante do seu projeto, como Legenda para tipo de tarefa de exemplo, para essa finalidade. Além disso, você também pode especificar o campo de recurso, que seria listado ao lado da barra no Gantt.\nEsse é um visual de código aberto. Obtenha o código do GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Agrupar Tarefas", "Visual_ScrollToCurrentTime": "Rolar para a hora atual", "Visual_DaysOff": "Dias de folga", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Configurações de Tarefas", "Visual_TaskSettings_Color": "Cor da tarefa", "Visual_TaskSettings_Height": "Altura", - "Visual_TaskSettings_RoundedCorners": "Cantos Arredondados", + "Visual_BarsRoundedCorners": "Cantos Arredondados de Barras", "Visual_DataLabels": "Rótulos de Dados", "Visual_CategoryLabels": "Rótulos da Categoria", "Visual_Type": "Tipo", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minutos", "Visual_DurationUnit_Seconds": "Segundos", "Visual_DurationMinimum": "Duração em min", - "Role_Parent": "Pai", "Visual_SubTasks": "Subtarefas", "Visual_InheritParentLegend": "Herdar legenda pai", "Visual_ParentDurationByChildren": "Duração do pai por filhos", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Rhombus", "Visual_Shape_Square": "Quadrado", "Visual_Shape_Circle": "Círculo", - "Visual_Description_Milestones": "Exibir as opções de marco" + "Visual_Description_Milestones": "Exibir as opções de marco", + "Visual_Expand_All": "Expandir Tudo", + "Visual_Collapse_All": "Recolher Tudo" } \ No newline at end of file diff --git a/stringResources/pt-PT/resources.resjson b/stringResources/pt-PT/resources.resjson index e7a462cd..a1d46759 100644 --- a/stringResources/pt-PT/resources.resjson +++ b/stringResources/pt-PT/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Tarefa", + "Role_Parent": "Principal", "Role_StartDate": "Data de Início", "Role_EndDate": "Data de Fim", "Role_Duration": "Duração", "Role_Completion": "% Conclusão", "Role_Resource": "Recurso", + "Role_Milestones": "Marcos", "Role_Tooltips": "Descrições", "Visual_General": "Geral", + "Visual_Short_Description": "Um tipo de gráfico de barras que ilustra uma linha cronológica de projeto ou agenda com recursos", + "Visual_Long_Description": "O Gráfico Gantt é um tipo de gráfico de barras que ilustra uma agenda com o eixo de tempo. Quando junta o gráfico Gantt a outros gráficos informativos numa tela interativa, pode gerir o seu projeto de uma forma totalmente nova. No Power BI, como os visuais interagem entre si, pode ver a sua alocação de recursos, a conclusão de tarefas, as restantes tarefas em perspetivas diferentes e obter um controlo firme sobre o futuro da empresa.\nOs gráficos Gantt são uma parte fundamental do portefólio de gestão de projetos. Os gestores de projetos e executivos gostam de gráficos Gantt porque estes mostram visualmente, de forma muito eficaz e de relance, a linha cronológica geral do projeto, o estado atual e o progresso (ou falta do mesmo), juntamente com a tarefa em bastante detalhe.\nCom este visual personalizado, pode especificar as Tarefas, a Data de Início, a Duração e a Percentagem de Conclusão, compostas em formato Gantt. Tenha em atenção que %Completion espera um valor decimal (por exemplo, 0,85 corresponde a 85%) e a Data de Início, um campo de data e não uma hierarquia de datas.\nTambém pode controlar a cor das barras com uma Legenda. Pode utilizar qualquer campo relevante do seu projeto como Legenda para os tipos de tarefa de exemplo para este fim. Além disso, também é possível especificar o campo de recursos que seria listado junto à barra no Gantt.\nEste é uma visual de open source. Obtenha o código do GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Tarefas de Grupo", "Visual_ScrollToCurrentTime": "Deslocar para o tempo atual", "Visual_DaysOff": "Dias livres", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Definições de Tarefa", "Visual_TaskSettings_Color": "Cor de tarefa", "Visual_TaskSettings_Height": "Altura", - "Visual_TaskSettings_RoundedCorners": "Cantos Arredondados", + "Visual_BarsRoundedCorners": "Barras com Cantos Arredondados", "Visual_DataLabels": "Etiquetas de Dados", "Visual_CategoryLabels": "Etiquetas de Categoria", "Visual_Type": "Tipo", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minutos", "Visual_DurationUnit_Seconds": "Segundos", "Visual_DurationMinimum": "Duração min", - "Role_Parent": "Principal", "Visual_SubTasks": "Subtarefas", "Visual_InheritParentLegend": "Herdar legenda principal", "Visual_ParentDurationByChildren": "Duração do elemento principal por subordinados", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Losango", "Visual_Shape_Square": "Quadrado", "Visual_Shape_Circle": "Círculo", - "Visual_Description_Milestones": "Apresentar opções de marcos" + "Visual_Description_Milestones": "Apresentar opções de marcos", + "Visual_Expand_All": "Expandir Tudo", + "Visual_Collapse_All": "Fechar Tudo" } \ No newline at end of file diff --git a/stringResources/ro-RO/resources.resjson b/stringResources/ro-RO/resources.resjson index a1c8c50e..38427e78 100644 --- a/stringResources/ro-RO/resources.resjson +++ b/stringResources/ro-RO/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legendă", "Role_Task": "Activitate", + "Role_Parent": "Părinte", "Role_StartDate": "Dată de început", "Role_EndDate": "Dată de sfârșit", "Role_Duration": "Durată", "Role_Completion": "% finalizare", "Role_Resource": "Resursă", + "Role_Milestones": "Jaloane", "Role_Tooltips": "Sfaturi ecran", "Visual_General": "General", + "Visual_Short_Description": "Un tip de diagramă cu bare care ilustrează cronologia sau planificarea unui proiect cu resurse", + "Visual_Long_Description": "Diagrama Gantt este un tip de diagramă cu bare ce ilustrează o planificare cu o axă temporală. Atunci când amplasați o diagramă Gantt împreună cu alte diagrame de profunzime pe o pânză interactivă, vă puteți gestiona proiectul într-un mod cu totul nou. În Power BI, pe măsură ce elementele vizuale interacționează între ele, puteți să examinați alocarea resurselor, finalizarea activităților și activitățile rămase într-o perspectivă diferită, precum și să aveți o imagine clară a situației din viitor.\nDiagramele Gantt sunt o parte indispensabilă a portofoliului managementului de proiect. Managerii de proiect și directorii apreciază mult diagramele Gantt, deoarece ele ilustrează într-un mod foarte eficient și imediat cronologia generală a proiectului, starea actuală și progresul (sau lipsa acestuia), împreună cu atribuirile, incluzând detaliile importante.\nCu acest element vizual particularizat, puteți specifica activități, data de început, durata și procentul de finalizare, pentru a le reda sub formă de diagramă Gantt. Rețineți că procentul de finalizare așteaptă o valoare zecimală (de exemplu, 0,85 înseamnă 85%) și data de început, un câmp de dată și nu o ierarhie de date.\nDe asemenea, puteți să controlați culoarea barei cu o legendă. În acest scop puteți utiliza orice câmp relevant din proiectul dvs. ca legendă, de exemplu, tipul de activitate. În plus, mai puteți specifica și câmpul resurselor, care va fi listat lângă bara din diagrama Gantt.\nAcesta este un element vizual open source. Obțineți codul de la GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Grupare activități", "Visual_ScrollToCurrentTime": "Defilați la ora curentă", "Visual_DaysOff": "Zile libere", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Setări activitate", "Visual_TaskSettings_Color": "Culoare activitate", "Visual_TaskSettings_Height": "Înălțime", - "Visual_TaskSettings_RoundedCorners": "Colțuri rotunjite", + "Visual_BarsRoundedCorners": "Colțuri rotunjite de bară", "Visual_DataLabels": "Etichete de date", "Visual_CategoryLabels": "Etichete categorie", "Visual_Type": "Tip", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minute", "Visual_DurationUnit_Seconds": "Secunde", "Visual_DurationMinimum": "Minim durată", - "Role_Parent": "Părinte", "Visual_SubTasks": "Subactivități", "Visual_InheritParentLegend": "Se moștenește legenda părinte", "Visual_ParentDurationByChildren": "Durata elementelor principale după elementele secundare", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Romb", "Visual_Shape_Square": "Pătrat", "Visual_Shape_Circle": "Cerc", - "Visual_Description_Milestones": "Afișați opțiunile pentru repere" + "Visual_Description_Milestones": "Afișați opțiunile pentru repere", + "Visual_Expand_All": "Extindere totală", + "Visual_Collapse_All": "Restrângere totală" } \ No newline at end of file diff --git a/stringResources/ru-RU/resources.resjson b/stringResources/ru-RU/resources.resjson index 74224fdb..6b9eed21 100644 --- a/stringResources/ru-RU/resources.resjson +++ b/stringResources/ru-RU/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Обозначения", "Role_Task": "Задача", + "Role_Parent": "Родительский", "Role_StartDate": "Дата начала", "Role_EndDate": "Дата окончания", "Role_Duration": "Длительность", "Role_Completion": "% готовности", "Role_Resource": "Ресурс", + "Role_Milestones": "Вехи", "Role_Tooltips": "Подсказки", "Visual_General": "Общие", + "Visual_Short_Description": "Тип линейчатой диаграммы, которая иллюстрирует временную шкалу или расписание проекта вместе с ресурсами.", + "Visual_Long_Description": "Диаграмма Ганта — это тип линейчатой диаграммы, которая иллюстрирует расписание на шкале времени. Если поместить диаграмму Ганта вместе с другими аналитическими диаграммами на интерактивный холст, можно управлять проектом совершенно по-новому. В Power BI при взаимодействии визуальных элементов друг с другом вы можете взглянуть на выделение ресурсов, степень завершенности задач и оставшиеся задачи с разных точек зрения и получить более точное представление о дальнейших перспективах проекта.\nДиаграммы Ганта — это неотъемлемая часть портфеля управления проектами. Проект-менеджеры и руководители любят диаграммы Ганта за то, что они наглядно показывают общую временную шкалу проекта, текущее состояние и ход выполнения (или его отсутствие), а также подробное распределение задач.\nС помощью этого пользовательского визуального элемента вы можете указать задачи, дату начала, длительность и выполнение в процентах в виде диаграммы Ганта. Обратите внимание, что для параметра \\\"Выполнение в процентах\\\" требуется десятичное значение (например, 0,85 означает 85%), а \\\"Дата начала\\\" — это поле даты, а не иерархия дат.\nВы также можете изменить цвет отрезка с условным обозначением. В качестве условного обозначения можно использовать любое релевантное поле проекта, например тип задачи. Кроме того, вы можете указать поле ресурсов, которое будет находиться рядом с отрезком на диаграмме.\nЭто визуальный элемент с открытым кодом. Найти код можно на GitHub: https://github.com/Microsoft/powerbi-visuals-gantt.", "Visual_GroupTasks": "Групповые задачи", "Visual_ScrollToCurrentTime": "Прокрутить до текущего времени", "Visual_DaysOff": "Выходные дни", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Параметры задачи", "Visual_TaskSettings_Color": "Цвет задачи", "Visual_TaskSettings_Height": "Высота", - "Visual_TaskSettings_RoundedCorners": "Скругленные углы", + "Visual_BarsRoundedCorners": "Скругленные углы полос", "Visual_DataLabels": "Метки данных", "Visual_CategoryLabels": "Метки категорий", "Visual_Type": "Тип", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "мин", "Visual_DurationUnit_Seconds": "Секунды", "Visual_DurationMinimum": "Длительность (мин)", - "Role_Parent": "Родительский", "Visual_SubTasks": "Подзадачи", "Visual_InheritParentLegend": "Наследовать родительские условные обозначения", "Visual_ParentDurationByChildren": "Длительность выполнения родительских объектов дочерними", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Ромб", "Visual_Shape_Square": "Квадрат", "Visual_Shape_Circle": "Круг", - "Visual_Description_Milestones": "Показать параметры вех" + "Visual_Description_Milestones": "Показать параметры вех", + "Visual_Expand_All": "Развернуть все", + "Visual_Collapse_All": "Свернуть все" } \ No newline at end of file diff --git a/stringResources/sk-SK/resources.resjson b/stringResources/sk-SK/resources.resjson index 3cf08aba..0a5454c2 100644 --- a/stringResources/sk-SK/resources.resjson +++ b/stringResources/sk-SK/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Úloha", + "Role_Parent": "Nadradená položka", "Role_StartDate": "Dátum začiatku", "Role_EndDate": "Koncový dátum", "Role_Duration": "Trvanie", "Role_Completion": "% dokončenia", "Role_Resource": "Prostriedok", + "Role_Milestones": "Míľniky", "Role_Tooltips": "Popisy", "Visual_General": "Všeobecné", + "Visual_Short_Description": "Typ pruhového grafu, ktorý ilustruje časovú os alebo plán projektu so zdrojmi", + "Visual_Long_Description": "Ganttov graf je typ stĺpcového grafu, ktorý ilustruje plán s časovou osou. Keď vložíte Ganttov graf spolu s inými prehľadnými grafmi na interaktívne plátno, môžete svoj projekt spravovať úplne novým spôsobom. V službe Power BI vizuály navzájom interaktívne spolupracujú, takže sa môžete pozrieť na pridelenie zdrojov, dokončenie úloh a zostávajúce úlohy z rôznych perspektív a získať účinný nástroj pre budúce rozhodovanie.\nGanttove grafy sú neodmysliteľnou súčasťou portfólia projektového riadenia. Projektoví manažéri a vedúci pracovníci milujú Ganttove grafy, pretože vizuálne a veľmi efektívnym spôsobom znázorňujú celkovú časovú os projektu a jeho aktuálny stav a priebeh (alebo jeho nedostatočné napredovanie) spolu s priradenými úlohami s množstvom podrobností.\nS týmto vlastným vizuálom môžete špecifikovať úlohy, dátum začiatku, trvanie a percento dokončenia, aby sa vykreslili Ganttovým štýlom. Všimnite si, že ako percento dokončenia sa očakáva desatinná hodnota (napríklad 0,85 znamená 85 %) a ako dátum začiatku sa očakáva pole s dátumom a nie hierarchia dátumov.\nMôžete tiež ovládať farbu pruhu s legendou. Zo svojho projektu môžete ako legendu použiť ľubovoľné relevantné pole, napríklad typ úlohy. Okrem toho môžete tiež zadať pole zdroja, ktoré bude uvedené vedľa pruhu v Ganttovom grafe.\nTento vizuál je typu open-source. Kód získate na stránke GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Úlohy skupiny", "Visual_ScrollToCurrentTime": "Prejsť na aktuálny čas", "Visual_DaysOff": "Dni voľna", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Nastavenia úlohy", "Visual_TaskSettings_Color": "Farba úlohy", "Visual_TaskSettings_Height": "Výška", - "Visual_TaskSettings_RoundedCorners": "Zaoblené rohy", + "Visual_BarsRoundedCorners": "Pruhy so zaoblenými rohmi", "Visual_DataLabels": "Označenia údajov", "Visual_CategoryLabels": "Označenia kategórií", "Visual_Type": "Typ", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minúty", "Visual_DurationUnit_Seconds": "Sekundy", "Visual_DurationMinimum": "Minimálne trvanie", - "Role_Parent": "Nadradená položka", "Visual_SubTasks": "Podúlohy", "Visual_InheritParentLegend": "Zdediť legendu nadradeného objektu", "Visual_ParentDurationByChildren": "Doba trvania nadradených projektov podľa podradených", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Kosoštvorec", "Visual_Shape_Square": "Štvorec", "Visual_Shape_Circle": "Kruh", - "Visual_Description_Milestones": "Zobraziť možností medzníkov" + "Visual_Description_Milestones": "Zobraziť možností medzníkov", + "Visual_Expand_All": "Rozbaliť všetko", + "Visual_Collapse_All": "Zbaliť všetko" } \ No newline at end of file diff --git a/stringResources/sl-SI/resources.resjson b/stringResources/sl-SI/resources.resjson index 547f200d..249b92ae 100644 --- a/stringResources/sl-SI/resources.resjson +++ b/stringResources/sl-SI/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Opravilo", + "Role_Parent": "Nadrejeno", "Role_StartDate": "Začetni datum", "Role_EndDate": "Končni datum", "Role_Duration": "Trajanje", "Role_Completion": "% dokončanja", "Role_Resource": "Vir", + "Role_Milestones": "Mejniki", "Role_Tooltips": "Zaslonski namigi", "Visual_General": "Splošno", + "Visual_Short_Description": "Vrsta paličnega grafikona, ki omogoča ponazoritev časovnice projekta ali razporeda z viri", + "Visual_Long_Description": "Gantogram je vrsta paličnega grafikona, s katerim prikažete razpored s časovno osjo. Ko na interaktivnem platnu uporabite gantogram skupaj z drugimi podrobnimi grafikoni, lahko upravljate svoj projekt na povsem novi ravni. Ker so te ponazoritve v storitvi Power BI medsebojno povezane, si lahko ogledate dodeljevanje virov, dokončanja opravil in preostala opravila iz različnih perspektiv ter tako zagotovite uspešno obvladovanje prihodnjih projektov.\nGantogrami so nepogrešljiv del portfelja upravljanja projektov. Projektni vodje in vodstveni kadri obožujejo gantograme, saj zagotavljajo učinkovit in pregleden način prikaza celotne časovnice projekta, trenutnega stanja in napredka (ali njegove odsotnosti) ter podrobnosti dodeljenih nalog.\nS to ponazoritvijo po meri lahko določite opravilo, datum začetka, trajanje in odstotek dokončanega ter podatke prikažete na gantogramu. Odstotek dokončanega zahteva decimalno vrednost (npr. 0,85 pomeni 85 %), datum začetka pa zahteva polje z datumom in ne hierarhijo datumov.\nBarvo vrstice lahko upravljate v legendi. Za legendo lahko uporabite katero koli ustrezno polje v projektu – v tem primeru na primer vrsto opravila. Določite lahko tudi polje z viri, ki bo navedeno ob vrstici v gantogramu.\nTo je odprtokodna ponazoritev. Kodo lahko pridobite na spletnem mestu storitve GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Opravila skupine", "Visual_ScrollToCurrentTime": "Pojdi na trenutno uro", "Visual_DaysOff": "Prosti dnevi", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Nastavitve opravila", "Visual_TaskSettings_Color": "Barva opravila", "Visual_TaskSettings_Height": "Višina", - "Visual_TaskSettings_RoundedCorners": "Zaobljeni vogali", + "Visual_BarsRoundedCorners": "Zaobljeni vogali vrstic", "Visual_DataLabels": "Oznake podatkov", "Visual_CategoryLabels": "Oznake kategorij", "Visual_Type": "Vrsta", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minute", "Visual_DurationUnit_Seconds": "Sekunde", "Visual_DurationMinimum": "Trajanje min", - "Role_Parent": "Nadrejeno", "Visual_SubTasks": "Podopravila", "Visual_InheritParentLegend": "Podeduj nadrejeno legendo", "Visual_ParentDurationByChildren": "Trajanje nadrejenega s strani podrejenega", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Romb", "Visual_Shape_Square": "Kvadrat", "Visual_Shape_Circle": "Krog", - "Visual_Description_Milestones": "Prikaži možnosti za mejnike" + "Visual_Description_Milestones": "Prikaži možnosti za mejnike", + "Visual_Expand_All": "Razširi vse", + "Visual_Collapse_All": "Strni vse" } \ No newline at end of file diff --git a/stringResources/sr-Cyrl-RS/resources.resjson b/stringResources/sr-Cyrl-RS/resources.resjson index 6cff4c75..184fd0c4 100644 --- a/stringResources/sr-Cyrl-RS/resources.resjson +++ b/stringResources/sr-Cyrl-RS/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Легенда", "Role_Task": "Задатак", + "Role_Parent": "Надређена", "Role_StartDate": "Датум почетка", "Role_EndDate": "Датум завршетка", "Role_Duration": "Трајање", "Role_Completion": "% завршетка", "Role_Resource": "Ресурс", + "Role_Milestones": "Кључне тачке", "Role_Tooltips": "Описи алатки", "Visual_General": "Опште", + "Visual_Short_Description": "Тип тракастог графикона који илуструје временску осу пројекта или распоред са ресурсима", + "Visual_Long_Description": "Гантов графикон представља тип тракастог графикона који илуструје распоред помоћу временске осе. Када на интерактивно платно поставите Гантов графикон заједно са другим графиконима који пружају увид, можете да управљате пројектом на потпуно нови начин. Док визуелни елементи услузи Power BI врше интеракцију једни са другима, можете да погледате доделу ресурса, довршење задатака, преостале задатке у различитој перспективи, као и да добијете контролу над будућношћу.\nГантови графикони су нераздвојни део портфолија за управљање пројектима. Менаџери пројеката и директори воле Гантове графиконе зато што они визуелно, на веома ефикасан начин за трен ока приказују свеукупну временску осу пројекта, тренутни статус и напредак (односно његов недостатак) уз додељивање велике количине детаља.\nПомоћу овог прилагођеног визуелног елемента, можете да наведете задатке, датум почетка, трајање, проценат довршености како бисте их приказали у виду Гантовог графикона. Имајте у виду да проценат довршености очекује децималну вредност (на пример, 0,85 значи 85%), а датум почетка очекује поље за датум, не хијерархију датума.\nТакође можете да контролишете боју траке помоћу легенде. Можете да користите било које релевантно поље из пројекта као легенду, на пример, тип задатка за ову сврху. Поред тога, можете и да наведете поље ресурса, које би било наведено поред траке у Гантовом графикону.\nОво је визуелни елемент отвореног кода. Преузмите кôд из услуге GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Задаци групе", "Visual_ScrollToCurrentTime": "Померите се до тренутног времена", "Visual_DaysOff": "Слободни дани", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Поставке задатака", "Visual_TaskSettings_Color": "Боја задатака", "Visual_TaskSettings_Height": "Висина", - "Visual_TaskSettings_RoundedCorners": "Заобљени углови", + "Visual_BarsRoundedCorners": "Траке са заобљеним угловима", "Visual_DataLabels": "Ознаке података", "Visual_CategoryLabels": "Ознаке категорија", "Visual_Type": "Тип", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Минути", "Visual_DurationUnit_Seconds": "Секунде", "Visual_DurationMinimum": "Трајање у мин.", - "Role_Parent": "Надређена", "Visual_SubTasks": "Подзадаци", "Visual_InheritParentLegend": "Наследи надређену легенду", "Visual_ParentDurationByChildren": "Трајање надрeћених по подређеним ставкама", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Ромб", "Visual_Shape_Square": "Квадрат", "Visual_Shape_Circle": "Круг", - "Visual_Description_Milestones": "Прикажи опције контролних тачака" + "Visual_Description_Milestones": "Прикажи опције контролних тачака", + "Visual_Expand_All": "Развиј све", + "Visual_Collapse_All": "Скупи све" } \ No newline at end of file diff --git a/stringResources/sr-Latn-RS/resources.resjson b/stringResources/sr-Latn-RS/resources.resjson index ce4f2c0a..1b370500 100644 --- a/stringResources/sr-Latn-RS/resources.resjson +++ b/stringResources/sr-Latn-RS/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Legenda", "Role_Task": "Zadatak", + "Role_Parent": "Nadređena", "Role_StartDate": "Datum početka", "Role_EndDate": "Datum završetka", "Role_Duration": "Trajanje", "Role_Completion": "% završetka", "Role_Resource": "Resurs", + "Role_Milestones": "Ključne tačke", "Role_Tooltips": "Opisi alatki", "Visual_General": "Opšte", + "Visual_Short_Description": "Tip trakastog grafikona koji ilustruje vremensku osu projekta ili raspored sa resursima", + "Visual_Long_Description": "Gantov grafikon predstavlja tip trakastog grafikona koji ilustruje raspored pomoću vremenske ose. Kada na interaktivno platno postavite Gantov grafikon zajedno sa drugim grafikonima koji pružaju uvid, možete da upravljate projektom na potpuno novi način. Dok vizuelni elementi usluzi Power BI vrše interakciju jedni sa drugima, možete da pogledate dodelu resursa, dovršenje zadataka, preostale zadatke u različitoj perspektivi, kao i da dobijete kontrolu nad budućnošću.\nGantovi grafikoni su nerazdvojni deo portfolija za upravljanje projektima. Menadžeri projekata i direktori vole Gantove grafikone zato što oni vizuelno, na veoma efikasan način za tren oka prikazuju sveukupnu vremensku osu projekta, trenutni status i napredak (odnosno njegov nedostatak) uz dodeljivanje velike količine detalja.\nPomoću ovog prilagođenog vizuelnog elementa, možete da navedete zadatke, datum početka, trajanje, procenat dovršenosti kako biste ih prikazali u vidu Gantovog grafikona. Imajte u vidu da procenat dovršenosti očekuje decimalnu vrednost (na primer, 0,85 znači 85%), a datum početka očekuje polje za datum, ne hijerarhiju datuma.\nTakođe možete da kontrolišete boju trake pomoću legende. Možete da koristite bilo koje relevantno polje iz projekta kao legendu, na primer, tip zadatka za ovu svrhu. Pored toga, možete i da navedete polje resursa, koje bi bilo navedeno pored trake u Gantovom grafikonu.\nOvo je open source vizuelni element. Preuzmite kôd iz usluge GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Zadaci grupe", "Visual_ScrollToCurrentTime": "Pomerite se do trenutnog vremena", "Visual_DaysOff": "Slobodni dani", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Postavke zadataka", "Visual_TaskSettings_Color": "Boja zadataka", "Visual_TaskSettings_Height": "Visina", - "Visual_TaskSettings_RoundedCorners": "Zaobljeni uglovi", + "Visual_BarsRoundedCorners": "Trake sa zaobljenim uglovima", "Visual_DataLabels": "Oznake podataka", "Visual_CategoryLabels": "Oznake kategorija", "Visual_Type": "Tip", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minuti", "Visual_DurationUnit_Seconds": "Sekunde", "Visual_DurationMinimum": "Trajanje u min.", - "Role_Parent": "Nadređena", "Visual_SubTasks": "Podzadaci", "Visual_InheritParentLegend": "Nasledi nadređenu legendu", "Visual_ParentDurationByChildren": "Trajanje nadrećenih po podređenim stavkama", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Romb", "Visual_Shape_Square": "Kvadrat", "Visual_Shape_Circle": "Krug", - "Visual_Description_Milestones": "Prikaži opcije kontrolnih tačaka" + "Visual_Description_Milestones": "Prikaži opcije kontrolnih tačaka", + "Visual_Expand_All": "Razvij sve", + "Visual_Collapse_All": "Skupi sve" } \ No newline at end of file diff --git a/stringResources/sv-SE/resources.resjson b/stringResources/sv-SE/resources.resjson index 179c1e5a..99ac6128 100644 --- a/stringResources/sv-SE/resources.resjson +++ b/stringResources/sv-SE/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Förklaring", "Role_Task": "Aktivitet", + "Role_Parent": "Överordnad", "Role_StartDate": "Startdatum", "Role_EndDate": "Slutdatum", "Role_Duration": "Varaktighet", "Role_Completion": "% färdigt", "Role_Resource": "Resurs", + "Role_Milestones": "Milstolpar", "Role_Tooltips": "Knappbeskrivningar", "Visual_General": "Allmänt", + "Visual_Short_Description": "En typ av stapeldiagram som illustrerar ett projekts tidslinje eller ett schema med resurser", + "Visual_Long_Description": "Gantt-diagrammet är en typ av stapeldiagram för att illustrera ett schema med en tidsaxel. När du sätter ett Gantt-schemat tillsammans med andra informativa diagram på en interaktiv arbetsyta så kan du hantera ditt projekt på ett helt nytt sätt. I Power BI eftersom visuella objekt interagerar med varandra, kan du granska din resurstilldelning, slutförande av aktiviteter, återstående aktiviteter med ett nytt perspektiv och få ett fast grepp om framtiden.\nGantt-diagram är en oundgänglig del i en projekthanteringsportfölj. Projekthanterare och chefer älskar Gantt-diagram, eftersom de kan visa på ett effektivt och översiktligt sätt den övergripande tidslinjen för projektet, aktuell status och framsteg (eller brist på framsteg) tillsammans med uppgiften i detalj.\nMed det här anpassade visuella objektet kan du ange uppgifterna, startdatum, varaktighet och %Completion för att återge dem som Gantt. Observera att %Completion förväntar sig ett decimalvärde (till exempel 0,85 innebär 85%) och startdatum, ett datumfält och inte en datumhierarki.\nDu kan även kontrollera stapelns färg med en teckenförklaring. Du kan använda alla relevanta fält från ditt projekt som en teckenförklaring till exempel för uppgiftstyp i detta syfte. Dessutom kan du ange det resursfält som ska listas bredvid stapeln i Gantt-diagrammet.\nDet här är ett visuellt objekt med öppen källkod. Hämta koden från GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Gruppaktiviteter", "Visual_ScrollToCurrentTime": "Bläddra till aktuell tidpunkt", "Visual_DaysOff": "Lediga dagar", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Uppgiftsinställningar", "Visual_TaskSettings_Color": "Uppgift färg", "Visual_TaskSettings_Height": "Höjd", - "Visual_TaskSettings_RoundedCorners": "Rundade hörn", + "Visual_BarsRoundedCorners": "Rundade hörn med staplar", "Visual_DataLabels": "Dataetiketter", "Visual_CategoryLabels": "Kategorietiketter", "Visual_Type": "Typ", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Minuter", "Visual_DurationUnit_Seconds": "Sekunder", "Visual_DurationMinimum": "Varaktighet min", - "Role_Parent": "Överordnad", "Visual_SubTasks": "Underuppgifter", "Visual_InheritParentLegend": "Ärv överordnad förklaring", "Visual_ParentDurationByChildren": "Överordnad varaktighet av underordnat element", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Romb", "Visual_Shape_Square": "Fyrkant", "Visual_Shape_Circle": "Cirkel", - "Visual_Description_Milestones": "Visa milstolpealternativ" + "Visual_Description_Milestones": "Visa milstolpealternativ", + "Visual_Expand_All": "Visa alla", + "Visual_Collapse_All": "Minimera alla" } \ No newline at end of file diff --git a/stringResources/th-TH/resources.resjson b/stringResources/th-TH/resources.resjson index 47b138af..f6c6ef24 100644 --- a/stringResources/th-TH/resources.resjson +++ b/stringResources/th-TH/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "คำอธิบายแผนภูมิ", "Role_Task": "งาน", + "Role_Parent": "พาเรนต์", "Role_StartDate": "วันที่เริ่ม", "Role_EndDate": "วันที่สิ้นสุด", "Role_Duration": "ระยะเวลา", "Role_Completion": "% ความเสร็จสมบูรณ์", "Role_Resource": "ทรัพยากร", + "Role_Milestones": "หลักเป้าหมาย", "Role_Tooltips": "เคล็ดลับเครื่องมือ", "Visual_General": "ทั่วไป", + "Visual_Short_Description": "ชนิดของแผนภูมิแท่งซึ่งแสดงเส้นเวลาโครงการหรือกำหนดการพร้อมทรัพยากร", + "Visual_Long_Description": "แผนภูมิแกนต์เป็นชนิดแผนภูมิแท่งที่จะแสดงกำหนดการด้วยแกนเวลา เมื่อคุณวางแผนภูมิแกนต์พร้อมกับแผนภูมิเชิงลึกอื่นๆ ในผืนผ้าใบแบบโต้ตอบ คุณสามารถจัดการโครงการของคุณด้วยวิธีใหม่ ใน Power BI เมื่อภาพโต้ตอบระหว่างกัน คุณสามารถดูการจัดสรรทรัพยากรของคุณ การเสร็จสมบูรณ์ของงาน งานที่เหลืออยู่ในมุมมองที่แตกต่างกัน และรับมือกับอนาคตได้\nแผนภูมิแกนต์เป็นส่วนจำเป็นของพอร์ตโครงการการจัดการโครงการ ผู้จัดการโครงการและผู้บริหารรักแผนภูมิแกนต์เนื่องจากแสดงภาพได้อย่างรวดเร็วและมีประสิทธิภาพ ทั้งไทม์ไลน์โดยรวมของโครงการ สถานะปัจจุบันและความคืบหน้า (หรือความบกพร่อง) พร้อมกับงานที่มอบหมายโดยละเอียด\nด้วยภาพแบบกำหนดเองนี้ คุณสามารถระบุงาน วันที่เริ่มต้น ระยะเวลา และ % ความเสร็จสมบูรณ์ สำหรับการแสดงภาพเป็นแผนภูมิแกนต์ โปรดทราบว่า % ความเสร็จสมบูรณ์ คาดหวังค่าทศนิยม (ตัวอย่างเช่น 0.85 หมายถึง 85%) และวันที่เริ่มต้น เป็นเขตข้อมูลวันที่ ไม่ใช่ลำดับชั้นวันที่\nคุณยังสามารถควบคุมสีของแท่งด้วยคำอธิบายแผนภูมิ คุณสามารถใช้เขตข้อมูลที่เกี่ยวข้องจากโครงการของคุณเป็นคำอธิบายแผนภูมิสำหรับชนิดงานตัวอย่างเช่นเพื่อจุดประสงค์นี้ นอกจากนี้ คุณยังสามารถระบุเขตข้อมูลทรัพยากร ซึ่งจะแสดงรายการถัดจากแท่งในแผนภูมิแกนต์\nนี่เป็นการแสดงภาพแบบโอเพนซอร์ส (Open Source) รับรหัสจาก GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "งานกลุ่ม", "Visual_ScrollToCurrentTime": "เลื่อนไปยังเวลาปัจจุบัน", "Visual_DaysOff": "วันหยุด", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "การตั้งค่างาน", "Visual_TaskSettings_Color": "สีของงาน", "Visual_TaskSettings_Height": "ความสูง", - "Visual_TaskSettings_RoundedCorners": "มุมโค้งมน", + "Visual_BarsRoundedCorners": "แท่งมุมมน", "Visual_DataLabels": "ป้ายชื่อข้อมูล", "Visual_CategoryLabels": "ป้ายชื่อประเภท", "Visual_Type": "ชนิด", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "นาที", "Visual_DurationUnit_Seconds": "วินาที", "Visual_DurationMinimum": "ระยะเวลานาที", - "Role_Parent": "พาเรนต์", "Visual_SubTasks": "งานย่อย", "Visual_InheritParentLegend": "สืบทอดคำอธิบายแผนภูมิหลัก", "Visual_ParentDurationByChildren": "ระยะเวลาหลักตามรายการรอง", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "สี่เหลี่ยมขนมเปียกปูน", "Visual_Shape_Square": "สี่เหลี่ยมจัตุรัส", "Visual_Shape_Circle": "วงกลม", - "Visual_Description_Milestones": "แสดงตัวเลือกหลักเป้าหมาย" + "Visual_Description_Milestones": "แสดงตัวเลือกหลักเป้าหมาย", + "Visual_Expand_All": "ขยายทั้งหมด", + "Visual_Collapse_All": "ยุบทั้งหมด" } \ No newline at end of file diff --git a/stringResources/tr-TR/resources.resjson b/stringResources/tr-TR/resources.resjson index 9905b0c3..29471b91 100644 --- a/stringResources/tr-TR/resources.resjson +++ b/stringResources/tr-TR/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Gösterge", "Role_Task": "Görev", + "Role_Parent": "Üst", "Role_StartDate": "Başlangıç Tarihi", "Role_EndDate": "Bitiş Tarihi", "Role_Duration": "Süre", "Role_Completion": "% Tamamlanma", "Role_Resource": "Kaynak", + "Role_Milestones": "Kilometre Taşları", "Role_Tooltips": "Araç İpuçları", "Visual_General": "Genel", + "Visual_Short_Description": "Proje zaman çizelgesini veya kaynaklarla yapılan zamanlamayı gösteren bir tür çubuk grafiği", + "Visual_Long_Description": "Gantt grafiği, zaman ekseniyle bir zamanlamayı göstermek için kullanılan bir çubuk grafiğidir. Gantt grafiğini diğer içgörü sağlayan grafiklerle etkileşimli bir kanvasa koyduğunuzda, projenizi tamamen yeni bir şekilde yönetebilirsiniz. Power BI'da, görseller birbirleriyle etkileşirken kaynak ayırmanıza, görev tamamlamanıza, kalan görevlere farklı bir bakış açısından bakabilir ve geleceğe dair daha net fikirleriniz olabilir.\nGantt grafikleri proje yönetim portföyünün ayrılmaz bir parçasıdır. Proje Yöneticileri ve üst düzey yöneticiler, projenin genel zaman çizgisini, şimdiki durumu ve ilerlemesini (veya ilerleme kaydedilmediğini) atamanın kendisi ile tek bakışta çok etkili bir şekilde gösterdiği için Gantt grafiklerini çok sever.\nBu özel görsel ile Görevleri, Başlangıç Tarihini, Süreyi ve Tamamlanma Yüzdesini Gantt olarak işlenmek üzere belirtebilirsiniz. Tamamlanma Yüzdesinin ondalık bir değer gerektirdiğini (örneğin 0,85'in %85 anlamına geldiğini) ve bir tarih alanı olan Başlangıç Tarihi'nin bir tarih hiyerarşisi olmadığını unutmayın.\nAyrıca çubuğun rengini bir Gösterge ile denetleyebilirsiniz. Bu amaçla projenizdeki istediğiniz bir alanı, örneğin görev türünü Gösterge olarak kullanabilirsiniz. Ayrıca Gantt grafiğinde çubuğun yanında listelenen kaynak alanını da belirtebilirsiniz.\nBu, açık kaynaklı bir grafiktir. Kodu GitHub'dan alabilirsiniz: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Grup Görevleri", "Visual_ScrollToCurrentTime": "Geçerli zamana kaydır", "Visual_DaysOff": "İzinli günler", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Görev Ayarları", "Visual_TaskSettings_Color": "Görev rengi", "Visual_TaskSettings_Height": "Yükseklik", - "Visual_TaskSettings_RoundedCorners": "Yuvarlatılmış Köşeler", + "Visual_BarsRoundedCorners": "Yuvarlatılmış Köşeli Çubuklar", "Visual_DataLabels": "Veri Etiketleri", "Visual_CategoryLabels": "Kategori Etiketleri", "Visual_Type": "Tür", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Dakika", "Visual_DurationUnit_Seconds": "Saniye", "Visual_DurationMinimum": "Süre dk", - "Role_Parent": "Üst", "Visual_SubTasks": "Alt görevler", "Visual_InheritParentLegend": "Üst göstergeyi devral", "Visual_ParentDurationByChildren": "Alt öğeler tarafından üst süresi", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Eşkenar Dörtgen", "Visual_Shape_Square": "Kare", "Visual_Shape_Circle": "Daire", - "Visual_Description_Milestones": "Kilometre taşı seçeneklerini göster" + "Visual_Description_Milestones": "Kilometre taşı seçeneklerini göster", + "Visual_Expand_All": "Tümünü Genişlet", + "Visual_Collapse_All": "Tümünü Daralt" } \ No newline at end of file diff --git a/stringResources/uk-UA/resources.resjson b/stringResources/uk-UA/resources.resjson index 6bcc2102..69a03464 100644 --- a/stringResources/uk-UA/resources.resjson +++ b/stringResources/uk-UA/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Легенда", "Role_Task": "Завдання", + "Role_Parent": "Батьківський елемент", "Role_StartDate": "Дата початку", "Role_EndDate": "Дата завершення", "Role_Duration": "Тривалість", "Role_Completion": "% завершення", "Role_Resource": "Ресурс", + "Role_Milestones": "Проміжні етапи", "Role_Tooltips": "Підказки", "Visual_General": "Загальні", + "Visual_Short_Description": "Тип гістограми з часовою шкалою проекту або розкладом із ресурсами.", + "Visual_Long_Description": "Діаграма Ганта – це тип гістограми, яка зручно ілюструє розклад відносно осі часу. Додавши до інтерактивного полотна діаграму Ганта та інші наочні діаграми, ви отримуєте абсолютно нові можливості керування проектом. Взаємодія візуалізацій у Power BI надасть вам цілісну актуальну картину й можливість із різних перспектив відстежувати виділення ресурсів, відсоток завершення завдань і невиконані завдання.\nДіаграми Ганта незамінні для керування проектами. Менеджери проектів і керівники надають перевагу цьому дуже ефективному способу візуалізації, що дає змогу швидко й досить докладно оцінити загальний розклад, поточний стан, дані про призначення й перебіг виконання.\nДля цієї спеціальної візуалізації можна вказати завдання, дату початку, тривалість і відсоток виконання. Зверніть увагу: відсоток виконання слід указати як десятковий дріб (наприклад, 0,85 означає 85%), а дата початку – це поле дати, а не ієрархія дат.\nТакож можна налаштувати колір смуги й легенду. Як легенду можна використовувати будь-яке відповідне поле проекту, як-от тип завдання. Крім того, ви можете вказати поле ресурсу, що відображатиметься поруч зі смугою на діаграмі Ганта.\nЦе візуалізація з відкритим кодом. Отримайте його на сайті GitHub https://github.com/Microsoft/powerbi-visuals-gantt.", "Visual_GroupTasks": "Групувати завдання", "Visual_ScrollToCurrentTime": "Прокрутити до поточного часу", "Visual_DaysOff": "Вихідні дні", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Параметри завдання", "Visual_TaskSettings_Color": "Колір завдання", "Visual_TaskSettings_Height": "Висота", - "Visual_TaskSettings_RoundedCorners": "Заокруглені кути", + "Visual_BarsRoundedCorners": "Заокруглені кути панелей", "Visual_DataLabels": "Підписи даних", "Visual_CategoryLabels": "Мітки категорій", "Visual_Type": "Тип", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Хвилини", "Visual_DurationUnit_Seconds": "Секунди", "Visual_DurationMinimum": "Тривалість у хв.", - "Role_Parent": "Батьківський елемент", "Visual_SubTasks": "Підзавдання", "Visual_InheritParentLegend": "Успадкувати легенду батьківського елемента", "Visual_ParentDurationByChildren": "Тривалість батьківського елемента за дочірніми елементами", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Ромб", "Visual_Shape_Square": "Квадрат", "Visual_Shape_Circle": "Коло", - "Visual_Description_Milestones": "Показувати параметри проміжних етапів" + "Visual_Description_Milestones": "Показувати параметри проміжних етапів", + "Visual_Expand_All": "Розгорнути все", + "Visual_Collapse_All": "Згорнути все" } \ No newline at end of file diff --git a/stringResources/vi-VN/resources.resjson b/stringResources/vi-VN/resources.resjson index d7af36a4..f4e9d7c4 100644 --- a/stringResources/vi-VN/resources.resjson +++ b/stringResources/vi-VN/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "Chú giải", "Role_Task": "Tác vụ", + "Role_Parent": "Cha mẹ", "Role_StartDate": "Ngày Bắt đầu", "Role_EndDate": "Ngày Kết thúc", "Role_Duration": "Khoảng thời gian", "Role_Completion": "% Hoàn thành", "Role_Resource": "Tài nguyên", + "Role_Milestones": "Mốc", "Role_Tooltips": "Chú giải công cụ", "Visual_General": "Chung", + "Visual_Short_Description": "Một loại biểu đồ thanh minh họa lịch biểu hoặc mốc thời gian dự án với các tài nguyên", + "Visual_Long_Description": "Biểu đồ Gantt là một dạng biểu đồ thanh để minh họa lịch biểu bằng trục thời gian. Khi bạn đặt biểu đồ Gantt cùng các loại biểu đồ có chứa thông tin chi tiết khác ở dạng bức vẽ có tính tương tác, bạn có thể quản lý dự án của mình theo cách hoàn toàn mới. Trong Power BI, vì hình ảnh tương tác với những hình ảnh khác, bạn có thể xem mục phân bổ tài nguyên, nhiệm vụ hoàn thành, nhiệm vụ chưa hoàn theo các góc nhìn khác nhau và xử lý sau.\nBiểu đồ Gantt là một phần không thể thiếu trong danh mục quản lý dự án. Những người điều phối và quản lý dự án rất ưa chuộng biểu đồ Gantt vì loại biểu đồ này hiển thị một cách trực quan theo cách mang lại hiệu quả ngay tức thì, thời gian tổng thể của dự án, hiện trạng & tiến trình (hoặc không có) cùng với nhiệm vụ ở mức chi tiết phù hợp.\nVới hình ảnh tùy chỉnh này, bạn có thể xác định Nhiệm vụ, Ngày bắt đầu, Khoảng thời gian và %Hoàn thành để hiển thị dưới dạng Gantt. Xin hãy lưu ý rằng %Hoàn thành nên là giá trị thập phân ( ví dụ 0,85 tương ứng với 85%) và Ngày bắt đầu, trường ngày và không phải dạng cấp bậc ngày.\nBạn cũng có thể kiểm soát màu sắc của thanh bằng Chú giải. Bạn cũng có thể sử dụng mọi trường liên quan từ dự án của mình như Chú giải cho loại nhiệm vụ minh họa cho mục đích này. Ngoài ra, bạn cũng có thể xác định trường tài nguyên, được liệt kê bên cạnh thanh trong biểu đồ Gantt.\nĐây là hình ảnh nguồn mở. Tải mã từ GitHub: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "Nhiệm vụ nhóm", "Visual_ScrollToCurrentTime": "Cuộn đến thời gian hiện tại", "Visual_DaysOff": "Số ngày nghỉ", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "Cài đặt nhiệm vụ", "Visual_TaskSettings_Color": "Màu cho nhiệm vụ", "Visual_TaskSettings_Height": "Chiều cao", - "Visual_TaskSettings_RoundedCorners": "Góc bo tròn", + "Visual_BarsRoundedCorners": "Góc bo tròn của thanh", "Visual_DataLabels": "Nhãn Dữ liệu", "Visual_CategoryLabels": "Nhãn danh mục", "Visual_Type": "Loại", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "Phút", "Visual_DurationUnit_Seconds": "Giây", "Visual_DurationMinimum": "Thời gian tính bằng phút", - "Role_Parent": "Cha mẹ", "Visual_SubTasks": "Công việc phụ", "Visual_InheritParentLegend": "Kế thừa chú giải chính", "Visual_ParentDurationByChildren": "Thời lượng của chú giải chính theo chú giải phụ", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "Hình thoi", "Visual_Shape_Square": "Hình vuông", "Visual_Shape_Circle": "Hình tròn", - "Visual_Description_Milestones": "Hiển thị tùy chọn mốc" + "Visual_Description_Milestones": "Hiển thị tùy chọn mốc", + "Visual_Expand_All": "Bung rộng tất cả", + "Visual_Collapse_All": "Thu gọn tất cả" } \ No newline at end of file diff --git a/stringResources/zh-CN/resources.resjson b/stringResources/zh-CN/resources.resjson index b0d00626..a15cad9f 100644 --- a/stringResources/zh-CN/resources.resjson +++ b/stringResources/zh-CN/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "图例", "Role_Task": "任务", + "Role_Parent": "父级", "Role_StartDate": "开始日期", "Role_EndDate": "结束日期", "Role_Duration": "持续时间", "Role_Completion": "完成百分比", "Role_Resource": "资源", + "Role_Milestones": "里程碑", "Role_Tooltips": "工具提示", "Visual_General": "常规", + "Visual_Short_Description": "一种条形图,用于说明项目时间线或资源计划", + "Visual_Long_Description": "甘特图是一种条形图,用于通过时间轴说明计划。将甘特图与其他富有见解的图表一起放在交互式画布中后,可以通过全新方式管理项目。在 Power BI 中,由于视觉对象相互交互,用户可以从不同角度查看资源分配、任务完成情况和剩余任务,从而牢牢把握未来。\n甘特图是项目管理组合中不可或缺的一部分。项目经理和管理人员喜欢使用甘特图,因为它们以非常高效且一目了然的方式直观地显示项目的总体时间线、当前的状态和进度(或没有)以及相当详细的任务分配。\n使用此自定义视觉对象,可以指定任务、开始日期、持续时间和完成百分比以呈现为甘特图。请注意,完成百分比应为十进制值(例如 0.85 即表示 85%),开始日期是一个日期字段,而不是日期层次结构。\n还可以使用图例控制条形图的颜色。为此,可以将项目中的任何相关字段用作图例,例如,任务类型。此外,还可以指定资源字段,该字段将在甘特图中的条形图旁边列出。\n这是一个开放源代码视觉对象。从 GitHub 获取代码: https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "组任务", "Visual_ScrollToCurrentTime": "滚动到当前时间", "Visual_DaysOff": "休息日", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "任务设置", "Visual_TaskSettings_Color": "任务颜色", "Visual_TaskSettings_Height": "高度", - "Visual_TaskSettings_RoundedCorners": "圆角", + "Visual_BarsRoundedCorners": "条形圆角", "Visual_DataLabels": "数据标签", "Visual_CategoryLabels": "类别标签", "Visual_Type": "类型", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "分钟", "Visual_DurationUnit_Seconds": "秒", "Visual_DurationMinimum": "持续时间(分钟)", - "Role_Parent": "父级", "Visual_SubTasks": "子任务", "Visual_InheritParentLegend": "继承父图例", "Visual_ParentDurationByChildren": "子级继承父级持续时间", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "菱形", "Visual_Shape_Square": "正方形", "Visual_Shape_Circle": "圆圈", - "Visual_Description_Milestones": "显示里程碑选项" + "Visual_Description_Milestones": "显示里程碑选项", + "Visual_Expand_All": "全部展开", + "Visual_Collapse_All": "全部折叠" } \ No newline at end of file diff --git a/stringResources/zh-TW/resources.resjson b/stringResources/zh-TW/resources.resjson index 7698532b..c701ad73 100644 --- a/stringResources/zh-TW/resources.resjson +++ b/stringResources/zh-TW/resources.resjson @@ -1,13 +1,17 @@ { "Role_Legend": "圖例", "Role_Task": "工作", + "Role_Parent": "父代", "Role_StartDate": "開始日期", "Role_EndDate": "結束日期", "Role_Duration": "持續時間", "Role_Completion": "% 完成", "Role_Resource": "資源", + "Role_Milestones": "里程碑", "Role_Tooltips": "工具提示", "Visual_General": "一般", + "Visual_Short_Description": "這種橫條圖搭配資源說明專案時間軸或排程", + "Visual_Long_Description": "甘特圖是橫條圖的一種,可藉由時間軸圖解說明排程。當您將甘特圖與其他見解的圖表放在互動式畫布中時,即可以全新的方式管理專案。在 Power BI 中,隨著視覺效果的彼此互動,您即可以不同的檢視方塊查看資源配置、工作完成、剩餘工作,而對未來有更穩固的掌握。\n甘特圖是專案管理組合中不可或缺的一部分。專案經理和主管們喜歡甘特圖,因為它們在視覺上以一目了然的方式非常有效地顯示專案的整體時間線、目前的狀態和進度 (或缺乏進度),以及以相當詳細的資料顯示工作分派。\n有了這種自訂視覺效果,您可以以甘特圖的方式來呈現指定的工作、開始日期、工期和完成百分比。請注意,完成百分比預期為小數點值 (例如 0.85 表示 85%),而開始日期在這裡是日期欄位,並不是日期階層。\n您也可以使用圖例來控制橫條的色彩。您可以使用專案的任何相關欄位做為圖例,例如用於此目的的工作類型。此外,您也可以指定資源欄位,該欄位會列在甘特圖中的橫條旁邊。\n這是開放原始碼視覺效果。從 GitHub 取得程式碼:https://github.com/Microsoft/powerbi-visuals-gantt", "Visual_GroupTasks": "群組工作", "Visual_ScrollToCurrentTime": "捲動到目前時間", "Visual_DaysOff": "休息日", @@ -50,7 +54,7 @@ "Visual_TaskSettings": "工作設定", "Visual_TaskSettings_Color": "工作色彩", "Visual_TaskSettings_Height": "高度", - "Visual_TaskSettings_RoundedCorners": "圓角", + "Visual_BarsRoundedCorners": "橫條圓角", "Visual_DataLabels": "資料標籤", "Visual_CategoryLabels": "類別標籤", "Visual_Type": "類型", @@ -72,7 +76,6 @@ "Visual_DurationUnit_Minutes": "分鐘", "Visual_DurationUnit_Seconds": "秒", "Visual_DurationMinimum": "持續時間 (分鐘)", - "Role_Parent": "父代", "Visual_SubTasks": "子工作", "Visual_InheritParentLegend": "繼承父圖例", "Visual_ParentDurationByChildren": "子系的父系持續時間", @@ -91,5 +94,7 @@ "Visual_Shape_Rhombus": "菱形", "Visual_Shape_Square": "正方形", "Visual_Shape_Circle": "圓形", - "Visual_Description_Milestones": "顯示里程碑選項" + "Visual_Description_Milestones": "顯示里程碑選項", + "Visual_Expand_All": "全部展開", + "Visual_Collapse_All": "全部摺疊" } \ No newline at end of file diff --git a/test/visualTest.ts b/test/visualTest.ts index a7b61309..36eb7974 100644 --- a/test/visualTest.ts +++ b/test/visualTest.ts @@ -79,7 +79,7 @@ describe("Gantt", () => { defaultDataViewBuilder = new VisualData(); dataView = defaultDataViewBuilder.getDataView(); fixDataViewDateValuesAggregation(dataView); - + }); function fixDataViewDateValuesAggregation(dataView: DataView) { @@ -990,7 +990,7 @@ describe("Gantt", () => { if (dataView.categorical?.categories && !dataView.categorical.categories[milestoneColumnIndex].objects) { dataView.categorical.categories[milestoneColumnIndex].objects = []; } - + categoriesColumn?.values.forEach((value: PrimitiveValue) => { let milestoneSettingsObject: { milestones: { fill: any; shapeType: string } } | null = null; if (value) { @@ -1002,7 +1002,7 @@ describe("Gantt", () => { } }; } - + dataView?.categorical?.categories?.[milestoneColumnIndex]?.objects?.push(milestoneSettingsObject); }); @@ -1666,7 +1666,7 @@ describe("Gantt", () => { const text: string | null = e.textContent; const taskResourcesX = +(e.getAttribute("x") ?? 0); const taskResourcesY = +(e.getAttribute("y") ?? 0); - const taskRectX = taskRects[i].getBBox().x + VisualClass.RectRound * 2; + const taskRectX = taskRects[i].getBBox().x + VisualClass.RectRound; const taskRectY = taskRects[i].getBBox().y; if (text) { @@ -1977,7 +1977,7 @@ describe("Gantt", () => { dataView.metadata.objects = { taskResource: { show: true, - fill: { solid: { color: "#A3A3A3" } }, + fill: { solid: { color: "#A3A3A3" } }, fontSize } }; @@ -2145,7 +2145,7 @@ describe("Gantt", () => { describe("PersistProperties test", () => { const collapsedTasksUpdateIDs: string = "collapsedTasksUpdateIDs"; - + it("Synchronous one task", (done) => { const newId = crypto?.randomUUID() || Math.random().toString(); @@ -2165,7 +2165,7 @@ describe("Gantt", () => { it("Synchronous multiple tasks", (done) => { const collapsedTasksUpdateIDsRandom : string[] = [] - + for (let count = 0; count < 3; count++) { const newId = crypto?.randomUUID() || Math.random().toString(); collapsedTasksUpdateIDsRandom.push(newId); @@ -2196,7 +2196,7 @@ describe("Gantt", () => { visualBuilder.update(dataView); expect(visualBuilder.instance[collapsedTasksUpdateIDs].length).toBe(2); - + dataView.metadata.objects = objects2; visualBuilder.update(dataView); expect(visualBuilder.instance[collapsedTasksUpdateIDs].length).toBe(1); @@ -2211,7 +2211,7 @@ describe("Gantt", () => { it("Asynchronous multiple tasks", async () => { const collapsedTasksUpdateIDsRandom : string[] = [] - + for (let count = 0; count < 3; count++) { const newId = crypto?.randomUUID() || Math.random().toString(); collapsedTasksUpdateIDsRandom.push(newId); @@ -2243,7 +2243,7 @@ describe("Gantt", () => { dataView.metadata.objects = objects1; visualBuilder.update(dataView); resolve(visualBuilder.instance[collapsedTasksUpdateIDs].includes(collapsedTasksUpdateIDsRandom[0])); - }, + }, 1_000); });