Not enough generation capacity - dummy technology to cover rest of load #23

Open
jonasVano opened this issue Jun 1, 2021 · 2 comments
Labels
balmorel feature request A new functionality you want to use. GENESYS-2 GENESYS-MOD help wanted Extra attention is needed oemof urbs

Comments

@jonasVano
Copy link

Hi all,

in our model we have so called "slack-cost". They are applied to the amount of energy that is missing in the system due to shortage in generation. Do you have something similar in your models? If so, do we need a parameter to harmonize those cost? Do you have any uncovered load anayway?

@jonasVano jonasVano added help wanted Extra attention is needed balmorel GENESYS-2 GENESYS-MOD oemof urbs feature request A new functionality you want to use. labels Jun 1, 2021
@khainsch
Copy link
Member

khainsch commented Jun 8, 2021

Yes, we do have the functionality of said slack costs (with incredible high costs so they are really only triggered if necessary). But so far, we do not see these being required in the current model runs.

@jonasVano
Copy link
Author

I would suggest to use a very high value: 999999

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
balmorel feature request A new functionality you want to use. GENESYS-2 GENESYS-MOD help wanted Extra attention is needed oemof urbs
Projects
None yet
Development

No branches or pull requests

2 participants