Below is a list of tasks to be completed, but the list will be updated/adapted on a regular basis.
General
WARNING: danger of diverting too much from oemof-tabular structure, and could get messy with e.g. different source components requiring very different input parameters, but there could be a way around this
Pre-processing
e.g. so someone using the MVS can transfer their models over to oemof-tabular
e.g. if 50 MW PV is planned, then set capacity_minimum to 50 and capacity_maximum to 50 to see if this works and then still can include investment costs
Components
At the moment, PV panel is its own facade and additional parameters specific for the panel type
Post-processing
Documentation
Tests