Build #21
Annotations
3 errors and 1 warning
build-workspace (ros:iron-ros-base)
Process completed with exit code 1.
|
build-workspace (ros:humble-ros-base)
The job was canceled because "ros_iron-ros-base" failed.
|
build-workspace (ros:humble-ros-base)
The operation was canceled.
|
build-workspace (ros:iron-ros-base)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|