Skip to content

Commit

Permalink
Merge pull request #163 from Yannik25/master
Browse files Browse the repository at this point in the history
Update README.md
  • Loading branch information
CircuitSetup authored May 29, 2024
2 parents 3d21235 + 9225651 commit cc06e5a
Showing 1 changed file with 2 additions and 2 deletions.
4 changes: 2 additions & 2 deletions README.md
Original file line number Diff line number Diff line change
Expand Up @@ -171,8 +171,8 @@ What you'll need to measure all 3 phases properly:
* JP12 and JP13 severed on the main board & add-on boards
Similar to the above for measuring a second voltage, once JP12 and JP13 are severed:
* CT1-CT3 on the main board, and CT1-CT3 on the add-on board will be in phase with the 1st phase
* CT3-CT4 on the main board with the 2nd phase
* CT3-CT4 on the add-on board with the 3rd phase.
* CT4-CT6 on the main board with the 2nd phase
* CT1-CT6 on the add-on board with the 3rd phase.

The transformers should be calibrated individually for greater accuracy.

Expand Down

0 comments on commit cc06e5a

Please sign in to comment.