Skip to content

Various fixups

Various fixups #107

Triggered via push January 3, 2025 05:35
Status Cancelled
Total duration 15m 27s
Artifacts

bazel.yml

on: push
Matrix: build-linux
Matrix: build-windows
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Mac
Process completed with exit code 1.
Build Windows (arm)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/remove-nt3' exists
Build Windows (arm)
The operation was canceled.
Build Windows (native)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/remove-nt3' exists
Build Windows (native)
The operation was canceled.
Linux (roborio)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/remove-nt3' exists
Linux (roborio)
The operation was canceled.
Linux (native)
Canceling since a higher priority waiting request for 'Bazel-refs/heads/remove-nt3' exists
Linux (native)
The operation was canceled.