Build and Release #297
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
build_and_release.yml
on: schedule
Create Prerelease
8s
Matrix: static-build
Annotations
9 errors
static-build (mips-linux-musl, 1)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 360 minutes.
|
static-build (mips-linux-musl, 1)
The operation was canceled.
|
static-build (mips-linux-musl, 0)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 360 minutes.
|
static-build (mips-linux-musl, 0)
The operation was canceled.
|
static-build (mips64-linux-musl, 0)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 360 minutes.
|
static-build (mips64-linux-musl, 0)
The operation was canceled.
|
static-build (mips64-linux-musl, 1)
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 360 minutes.
|
static-build (mips64-linux-musl, 1)
The operation was canceled.
|
static-build (x86_64-w64-mingw32, 0)
Process completed with exit code 2.
|