UBO consolidation #5686
Triggered via pull request
December 13, 2024 00:18
Status
Failure
Total duration
1h 28m 30s
Artifacts
3
linux-ci.yml
on: pull_request
pre_job
2m 21s
linux-coverage
17m 34s
Matrix: linux-build-and-test
Linux CI Result
0s
Annotations
6 errors
linux-build-and-test (drawable)
Process completed with exit code 1.
|
linux-build-and-test (vulkan)
The job was canceled because "drawable" failed.
|
linux-build-and-test (vulkan)
The operation was canceled.
|
linux-build-and-test (legacy)
The job was canceled because "drawable" failed.
|
linux-build-and-test (legacy)
The operation was canceled.
|
Linux CI Result
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
coverage-report
|
456 KB |
|
mbgl-benchmark-runner
|
48.3 MB |
|
mbgl-render
|
46.8 MB |
|