Skip to content

fix: error handling and logging #214

fix: error handling and logging

fix: error handling and logging #214

Re-run triggered December 16, 2024 09:18
Status Failure
Total duration 13m 22s
Artifacts

tests.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
build (3.9)
Process completed with exit code 1.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
The operation was canceled.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
The operation was canceled.
build (3.8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build (3.9)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636