Skip to content

Update dependency bazel_gazelle to v0.40.0 #4598

Update dependency bazel_gazelle to v0.40.0

Update dependency bazel_gazelle to v0.40.0 #4598

Triggered via push December 10, 2024 12:15
Status Failure
Total duration 4m 39s
Artifacts

go-lint.yml

on: push
Fit to window
Zoom out
Zoom in

Annotations

2 errors
go-lint
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
go-lint
The operation was canceled.