Skip to content

Small fixes and reduced verbosity for setup #14

Small fixes and reduced verbosity for setup

Small fixes and reduced verbosity for setup #14

Triggered via push January 8, 2025 20:21
Status Cancelled
Total duration 5m 39s
Artifacts 6

eval.yml

on: push
Matrix: eval
Fit to window
Zoom out
Zoom in

Annotations

15 errors
eval (verus)
The run was canceled by @JonasAlaif.
eval (verus)
The operation was canceled.
eval (silicon)
The run was canceled by @JonasAlaif.
eval (silicon)
The operation was canceled.
eval (silicon)
Process completed with exit code 1.
eval (fstar)
The run was canceled by @JonasAlaif.
eval (fstar)
The operation was canceled.
eval (dafny)
The run was canceled by @JonasAlaif.
eval (dafny)
Process completed with exit code 1.
eval (dafny)
The operation was canceled.
eval (smt-comp)
The run was canceled by @JonasAlaif.
eval (smt-comp)
The operation was canceled.
eval (carbon)
The run was canceled by @JonasAlaif.
eval (carbon)
The operation was canceled.
eval (carbon)
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
carbon
35.2 MB
dafny
13.8 MB
fstar
7.04 MB
silicon
9.32 MB
smt-comp
30.5 MB
verus
227 KB